IE Insp Rept 50-285/80-23 on 801215-18.No Noncompliance Noted.Major Areas Inspected:Maint Program & LER Followup
ML19343C154
Person / Time
Site: Fort Calhoun 
Issue date: 12/31/1980
From: Hunnicutt D, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19343C153 List:
References
50-285-80-23, NUDOCS 8102180774
Download: ML19343C154 (9)


Text

{{#Wiki_filter:& f) V U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

, Report No. 50-285/80-23 License No. OPR-40 Docket No. 50-285 Licensee: Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68012 Facility Name: Fort Calhoun Station, Unit 1 Inspection at: Fort Calhoun Station, Blair, Nebraska Inspection conducted: December 15-18, 1980 Inspectors: 7- [. fM;&_ h /2/pr/ta D. M. Hunnicutt, Chief Date ' Reactor Projects Section No. 2 Gu Eb hfb t L. A. Yandelf, Reactor Inspector ' 0 ate Accompanying Personnel: D. P. Richardson, Engineering Aide (C0-0P Student) Approved by: [[ /m />/b/fa D. M. Hunnicutt, Chief f Oate Reactor Projects Section No. 2 l Inspection Summary Inspection conducted durino the period of December 15-18, 1980 (Recort No.

50-285/80-23) Areas Inspected: Routine, unannounced inspection of the maintenance program and follow-up of LER's.

The inspection involved forty-eight (48) inspector-hours on-site by two NRC inspectors.

Results: Within the two areas inspected, no violations or deviations were identified.

ggg180 7

DETAILS 1.

Persons Contacted

  • R. Andrews, Section Manager, Operations
  • K. Morris, Manager, Administrative Services
  • F. Thurtell, Division Manager, Environmental and Regulatory Affairs
  • R. Jaworski, Section Manager, Technician Services i
  • S. Stevens, Manager, Ft. Calhoun Station
  • P. Surber, Acting Section Manager, GSE
  • T. Patterson, Licensing Administrator
  • G. Peterson, Supervisor, Maintenance D. Dale, QC Inspector W. Jewell, QC Inspector J. Newman, CE Field Service QA Support T. Metza, QC Inspector D. Lundy, Maintenance Foreman
  • Denotes those attending exit interview.

The inspectors also talked with and interviewed other licensee employees during the inspection.

These employees included licensed and unlicensed operators, craftsmen, engineers, and office personnel.

2.

Maintenance Program The inspector reviewed the licensee's corrective maintenance program a.

to verify that written procedures had been established for initiating and approving maintenance requests; for identifying inspection and hold points related to the activity; for performing the maintenance activity; and for testing of structures, systems or components follow-ing maintenance work.

The following Maintenance Orders were reviewed l in conjunction with procedures G-17, Maintenance Order and G-26, l Maintenance Quality Control Program.

M0 Number-Date Subject 5849 5/17/80 Pump RC-38 seal removal 5857 5/17/80 Pump RC-3B disassemble 5882 5/20/80 Linear Power Channel i j 5914 5/22/80 Pump RC-3B reassemble 5959 5/28/80 Pump RC-3B couple and checkout l l l

-

6002 5/31/80 Auto initiate of auxiliary feed 6106 6/07/80 Pump CH-1B internal leakage 6125 6/08/80 Explosive detector 6145 6/09/80 Containment Sump Pump 6266 6/21/80 Pump CH-1C Packing Cooling 6307 6/25/80 Pump CH-1B-6405 7/08/80 "B" Channel, Trip Unit-3 6430 7/10/80 Steam Generator Level, "C" Channel 6490 7/18/80 Pump CH-1B 6579 8/01/80 Pump CH-1B 6596 8/04/80 Diesel Generator No. 1 6699 8/11/80 "B" Linear Channel, 7016 9/05/80 Pump CH-1B, (available in QA file only) 7017 9/05/80 "D" Channel, Trip Unit-3 7287 10/02/80 Seismic pipe restraint (C-45) 7288 10/02/80 Seismic pipe restraint (C-46) 7289 10/02/80 Seismic pipe restraint (D-4) 7345 10/02/80 Pump CH-1A, Suction-relief valve 7419 10/10/80 Seismic pipe restraint (C-47) 7423 10/10/80 Atmospheric dump valve, HCV-1040 l t-

" .

7449 10/13/80 Isolation to waste evaporator 7592 10/23/80 Diesel fire pump 7624 10/27/80 LPSI pump 18, vibration 7629 10/27/80 Pump CH-1A 7666 10/30/80 Matrix relay AB-1 7757 11/05/80 DG fail to start 7780 11/07/80 SI-125 packing leak The inspector verified that surveillance tests were performed when called for by the MO, and that inservice inspection pump / valve information was being recorded when required.

No violations or deviations were found in this area.

b.

The inspector reviewed the licensee's equipment control procedure as outlined in G-17 and 0-20, Equipment Tagging Procedure.

Several tag out sheets were reviewed and a representative sample of tags were verified to be properly identified and hung.

The licensee does provide for independent verification of tagging under standing order 0-37, Independent Verification of Critical Systems Valve Configurations, which requires that certain safety related systems be given a double valve lineup when coming out of a refueling outage.

The procedure also provides for independent verifi-cation on other plant startups when called out on FC-84 and approved by the PRC.

Procedure 0-20 does not specify requirements for inde-pendent verifications, and it is not OPPD's practice to do so for individual maintenance and surveillance items.

This issue is being addressed by the NRC in its position outlined in NUREG 0737, item I.C.6, and by OPPD in their response that took exception to this position.

The regional inspectors have requested clarification of this matter as well as guidance in the application of section 5.1.5 of ANSI N18.7-72 as it pertains to independent verification.- Pending resolution of this question by NRR, the inspector has no further com-ments on the licensee's method of independent verification.

No violations or deviations were found in this area.

c.

The inspector reviewed the licensee's preventive maintenance program as described in procedure M-2, Preventive Maintenance Program.

The master Preventive Maintenance Schedule and one of the craft PM schedules (with the associated computerized cards) were reviewed and discussed with plant personne.

.

No violations or deviations were found in this area.

d.

The inspector reviewed the licensee's administrative controls for special processes to ensure that only qualified procedures and per-sonnel were being used.

The inspector selected two welding procedure specifications for review and evaluation.

The two welding procedure specifications contained the necessary information and approvals.

OPPD Weld Procedure Specifi-cation No. 3, revision 3, dated February 26, 1979, had been approved by the Maintenance Supervisor and QA Engineer and covered manual weld-ing to the GTAW Welding Process.

OPPD Weld Procedure Specification No. 1, revision 2, dated June 23, 1976, had been approved by the Maintenance Supervisor and the QA Engineer and covered manual welding to the SMAW Welding Process.

The inspector reviewed the following NDE Procedures: Liquid Penetrant Examination Procedure (QAP #11) dated April 25, 1977 Ultrasonic Thickness Measurement Procedure (QAP #12) dated Sept-ember 30, 1977.

Magnetic Particle Examination Procedure (QAP #13) dated April 25, 1977.

Visual Examination Procedure (QAP #22) dated February 28, 1980.

Each of the above procedures provided the necessary instructions and information for a qualified Level II or properly supervised Level I to pe: form the specified actions.

l The inspector reviewed Fort Calhoun. Station Unit No. 1 STANDING ORDER N0. G-12, Special Process Control and STANDING ORDER NO. G-26, Main-tenance Quality Control Program.

Each of these STANDING ORDERS (Procedures) provided the necessary instructions to implement the l specified actions to be performed.

A review of Standing Order No.

l G-12, Special Process Control, issued on October 16, 1979, other l related procedures and discussions with licensee personnel resulted l in a determination that qualified procedures were used for each identi-fied special process performed on Critical Quality Elements.

The l approved and qualified procedures specified prerequisite requirements

6.o be used during the process.

Procedures specified environmental conditions, equipment, instrumentation, and personnel who were to be involved in the process.

! Personnel to be used during the special processes were required to be f qualified according to applicable codes and standards required for the specified special process.

Procedures required that the licensee approve the qualifications of contractor / personnel.

The inspector l

' .

reviewed the qualification records of one of the five licensee quali-fied welders.

The welder, Symbol K, had been qualified to ASME Section V, for the TIG process on June 22, 1978, and for the 01AW process on May 9, 1978.

Licensee records indicated that each of the five welders had met qualification requirements by welding within their qualification areas at intervals of less than ninety days.

Licensee procedures require a current listing of (1) Special Processes; ! (2) approved, qualified procedures; (3) qualified personnel and the Special Processes to which these personnel are qualified; and (4) con- ' tractor personnel approved and qualified and the Special Processes which these personnel are qualified to perform, Licensee procedures

specified requirements to assure that procedures and personnel have ' been qualified to perform the functions specified by the Special Pro-cesses.

The responsibilities have been assigned by designating a

responsible individual by job title, who is required to assure that the Special Process is performed in accordance with the stated requirements.

The inspector selected three completed packages containing data and i information related to the installation of seismic restraints required by IE Bulletin No. 79-14.

Each of these seismic restraint installa-tions was documented and installation verified by the following: ' Maintenance Order No. (selected Nos, were 7968, 7973, and 8088) Maintenance Procedure and revision verification Design package checklist Original drawing or appropriate layout sketch Welding and Test Control Record Non-destructive Examination information.

A seismic restraint in the process of being installed was reviewed.

The Maintenance Order, No. 7732, was issued on November 3, 1980.

A pipe restraint (SIS-196) was being fabricated for installation on SIS piping.

The documentation package indicated the present status ' of the fai;rication of this piping restraint.

No violations or deviations were found in this area.

Weld Materials The inspector observed that weld filler material was stored in accordance with approved procedures ~, that each type of filler material was separated from other types of filler material, and that all filler material was in locked storage.

Loose filler material was segregated . -_

' .

according to rod diameter and heat and lot number.

The QC inspector had control of filler materials and custody of the keys to locks.on the cabinets and oven that contained filler materials.

The inspector reviewed selected completed Weld and Test Control Records, Form FC-145, showing the issuance of filler materials.

Applicable , sections of this Control Form had been filled out and signed and l dated as required by Standing Order No. G-12.

' The document package for a pipe restraint under fabrication in Room . 21 was determined to meet requirements specified in Standing Order No. G-12, when this document package was reviewed by the inspector during a plant. inspection tour on December 16, 1980.

Inspection of Pipe Restraints, Wali and Floor Support Structures and Review of Selected Installation in Progress On December 16, 1980, the inspector toured the following plant con-trolled areas: , Plant Area Description of Work or Installation Inspected Room 4 Observed the UT depth measurements being performed by a qualified QC inspector on four -inch diameter Hilti anchors (studs) installed in a seismically designed wall.

A support plate for an appropriately designed seismic restraint is to be installed in this area for Seismic restraint No. ACS-37.

Room 4 Visually inspected three overhead seismic restraints and three seismic supports on piping.

Two of these seismic supports included saddle welds to the attach-ment plates.

Room 18 Visually inspected fcur seismic restraints on small.

diameter piping.

Room 21 Visually inspected three seismic restraints (SIS-36, ' SIS-39 and SIS-205).

Visually inspected seismic restraints for two valve operators (2917 and 2957).

Observed welding in progress fer seismic restraint No. 97, which will be the replacement seismic restraint for No. 119, when installatior, of No.~97 is completed.

e.

The inspector reviewed selected Fort Calhoun Station Unit No. 1 Maintenance Procedures, including the following: . MP-RC-4-3, Rev. O, issued 11/23/77 Pressurizer Manway Cover Replacement

.

MP-RC-6-2, Rev. 1, issued 2/25/80 Inspection and Replacement of Reactor Vessel Closure Head MP-RC-6-6-1A, issued 2/25/80 Cleaning and Inspecting of R. V. Studs, Nuts and Washers MP-RC-6-8-B, Rev. 1, issued 1/7/80 Incore Instrument (ICI) Flange Cleaning Procedure MP-RC-7-1, Rev. 1, issued 6/17/77 Reactor Vessel Internals Inspection Procedure MP-VA-6-1, Rev. 1, issued 10/10/77 Removal of Containment Air Cooling and Filtering

Unit Charcoal Trap Char-coal Units VA-6A/B MP-VR-1, Rev. 1, issued 1/7/80 Repair of Bolted Bonnet Valve Gasket Surfaces MP-WD-21-1, Rev. 2, issued 1/7/80 Waste Evaporator Recircula-

tion Spray Nozzle Cleaning MP-RC-1-3, Rev. 7, issued 3/1/80 Reactor Vessel Flange Preparation Field Handling, Maintenance and Storage Requirements for Combustion Engineering Furnished Equipment CEND-353, dated August 1977.

The inspector's review.and evaluation of the above procedures resulted in a determination that procedures have been developed for cleaning safety related components and systems; for maintaining the cleanliness of previously cleaned surfaces or systems, and that the cleanliness classifications of plant systems have been established.

(NOTE: The licensee's procedures appear to meet the intent of ANSI N45.2.1 - 1973, . " Cleaning of Fluid Systems and Associated Components During Construc- ! tion Phase of Nuclear Power Plants," even though the licensee is not l committed to this ANSI by Technical Specifications requirements).

Each of the licensee's procedures reviewed by the inspector specified the individual (s) by job title responsible for implementing cleanliness controls required by each specific procedure.

No violations or deviations were found in this area.

! , l , _ w.

,

. . _.

. .. . _- - -_ . - .

.. ,

3.

Licensee Event Reoort (LER) Follow-uo ! ., The below listed LER's were reviewed to verify that (1) correct reporting requirements were met, (2) that proper corrective action was identified and taken, and (3) that licensee administrative procedures were followed in the evaluation and review of the event.

LER 80-11, Containment Penetration Leak Rate Tests.

LER 80-12, RPS Trip Unit-3, set point drift.

, LER 80-13, Channel A, DC Sequencer SI-1, inoperable.

{ LER 80-14, Transformer (T-4) to DG-1, failed.

LER 80-15, RPS Trip Unit-4, setpoint drift.

LER 80-16, Pump CH-18, suction side demineralized water flush line cracked.

LER 80-17 Setpoint Selector Switch for RMO-61 set in improper ! (high) setpoint position.

Revise ST-RM-2, section F. 2.

LER 80-19 Seismic pipe restraint SIS-62 made inoperable while second restraint SIS-7 was already inoperable.

! LER 80-20 Axial Power Distribution set points on channel D out of tolerance.

4.

Exit Interview An exit interview was conducted on December 18, 1980, with those OPPD , personnel denoted in paragraph 1 of this report to summarize the scope t of the inspection and the findings.

. - -. -, ,, -..,. . -, -, .


v,,-

.,,-.r , ,y . --',. , - --, - - y - }}