IR 05000285/1980022

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-285/80-22 on 801208-12.No Noncompliance Noted.Major Areas Inspected:Lighting,Detection & Assessment Aids,Compensatory Measures & Power Supply.Details Withheld (Ref 10CFR2.790)
ML19351G434
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/07/1981
From: Caldwell R, Joseph Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19351G432 List:
References
50-285-80-22, NUDOCS 8102230701
Download: ML19351G434 (1)


Text

.

_-._ - -

.

- -.... -. - - -

_

o..

U. S. NUCLEAR REGULATORY COMMISSION i

0FFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No. 50-285/80-22 License No. DPR-40

.

l Safeguards Group: IV

]

Licensee:

Omaha Public Power District 1623 Harney Street

,

Omaha, Nebraska 68102

'

Facility Name:

Fort Calhoun Station, Unit 1 Inspection at:

Blair Nebraska Inspection Conducted:

December 8-12, 1980

Date of Last Physical Security Inspection:

August 11-15, 1980

j Type of Inspection:

Unannounced Physical Security i

.

7 Gb 7 0+. k Inspector:

't R. A. Caldwell, Physical Security / Investigation Date Specialist f

Approved by:

M be.

.i 7.J an N J

Jasnes lA. F. Kelly N

Date

'

j Chu fs, Physical Security Branch

.

Inspection Summary

Areas Inspected:

Included a review'of the Lighting; Detection Aids; Assess-l ment Aids; Compensatory Measures; Power Supply, Records and Reports; Licensee

!

Action of Previous Inspection Findings.

The inspection involved thirty-three inspector-hours by two NRC inspectors including seven inspection hours accomplished during off-shift periods.

The t

inspection began during the off shift.

Results:

The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.

,

i

810eeso70I

... -.

. -. -. - - -. -. - - -. - -. -.

. - -.

-