e
.t.
.
i ('
U. S. NUCLEAR REGULATORY COMMISSION
~ v)
,
0FFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-285/80-05 Docket No. 50-285 License No. DPR-40 Licensee: Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station, Unit 1 Inspection At:
Blair, Nebraska Inspection Conducted: February 12-15, 1980 Date of La'.t Physical Security Inspection Visit: September 11-14, 1979 Type of Inspection: Unannounced Physical Security Inspectors:
W48u--
3 !/4hC'
7t. A. Caldwell, h durity/ Investigation Date
,
Specialist hNck/b 3l/9lf0 C. Abigail Evans, Security / Investigation Date Specialist Approved by:
_
h[ged <
I!/9 d
-
G. L. Madsen, Chief, Reactor Operations and Date Nuclear Support Branch Inspection Summary Areas Inspected:
Included review of Security Plan; Security Organization; Physical-Barriers (Protected Area); Physical Barriers (Vital Areas); Lighting; Alarm Stations; Detection Aids; Assessment Aids; Compensatory Measures; Locks, Keys, and Combinations; Records and Reports.
- 8004070 OSC
-
..
-
.. '
'2 The inspection involved 62 inspector hours onsite by two NRC inspectors.
The inspection was begun during a regular shift with six inspector hours being accomplished.offsite and seventeen inspector hours were completed
~during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements-within the 11 areas examined during the inspection.
.
J J
...
, -.. -,