U.S. NUCLEAR REGULATORY COMMISSION
-
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
.
Report No. 50-285/80-06 Docket No. 50-285 License No. DPR-40 Safeguards Group IV Licensee: Omaha Public Powtr District 1623 Harney Stree.t Omaha, NE 68102 Facility Name: Fort Calhoun Nuclear Power Station Inspection At: Fort Calhoun Site, Fort Calhoun, NE Inspection Conducted: March 5-7, 1980 Date of Last Material Control and Accounting Inspection: September 28-30, 1977 Type of Inspection: Unannounced Material Centrol and Accountability I1 27)
Inspectors:
.
.
. G. Finle 8Datd
"
Auditor s.?.SLL 3hdn>
b.?.Patterson'
Dat#
Chemist Approved By:
_
3 13
-
.
.
w. A. Hind, Chief
"Da te'
Safeguards Branch s
Inspection Summary:
Inspection on March 5-7, 1980 (Report No. 50-285/80-06)
Areas Inspected: Facility organization and operation measurements and controls, inventory and inventory verifications, shipping and receiving, storage and interval controls, records and reports and manar;emtat of material control system. The inspection involved 32 inspetion-iours onsite by two NRC inspector (s) and was begun durin;.h: regular hc9 s.
Results: The licensee was found to be in compliance with NRC require-ments in the seven areas examined during the inspection.
i I
(Details 2.790(d) Information)
'S * ' M s-r3-Copy _.___Of CUE
'
t 1-o.c.
Inis pccr. ::T IG !!7.' TO E FIPP.07*,C"D '. :TiiOUT ' IICIIl0
-
APPROVI.L CF P.III (LQ 7 8004110 i IO
_
_
_-
-...