June 9, 2020

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - SECURITY BASELINE INSPECTION REPORT 05000282/2020401 AND 05000306/2020401

Dear Mr. Sharp:

On May 29, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2020401 and 05000306/2020401

Enterprise Identifier: I-2020-401-0068

Licensee:

Northern States Power Company, Minnesota

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, MN

Inspection Dates:

April 15, 2020 to May 29, 2020

Inspectors:

J. Kutlesa, Physical Security Inspector

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed remotely.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following inspection elements:

Access Control (1 Partial)

(1)

(Partial)

  • Tier I: 02.01(a, b, c, d, e); 02.03(a); 02.05(a)
  • Tier II: 02.06(a, b, c, d); 02.08(a, b, c, d, e, f, g)
  • Tier III: 0 2.10(a)

71130.08 - Fitness-For-Duty Program

The inspectors evaluated the fitness-for-duty program by completing the following inspection elements:

Fitness-For-Duty Program (1 Partial)

(1)

(Partial)

  • Tier I: All Requirements
  • Tier II: 02.05(a, b, c, d, e, f, h, j); 02.06(f, g); 02.11(a)
  • Tier III: 02.13(b, c); 02.14(c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 29, 2020, the inspectors presented the security baseline inspection results to Scott Sharp and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

FP-S-FSIP-06

Searches

FP-S-FSIP-07

Access Controls

FP-S-FSIP-10

Security Response to Emergency Events

FP-S-FSIP-17

Security Program Administration

FP-S-SIP-13

Information Control Program

71130.08

Miscellaneous

FFD Performance Data Letter

2/25/2020

NANTeL

Generic Fitness-for-Duty and Behavior Observation Content

Document

06/08/2017

NRC Form 891

Xcel Corporate FFD Report 2019

2/17/2020

Procedures

FP-S-AA-01

Access Authorization Program

FP-S-FAP-01

CFR 26 Fatigue Assessment Procedure

FP-S-FFD-01

Monticello/Prairie Island Fitness-for-Duty Program

FP-S-FMP-01

CFR 26 Fatigue Management Fleet Procedure

QF 1720

Monticello/Prairie Island Fitness-For-Duty Handbook

Self-Assessments #A-AA/PAD-FLT-

20-1

20 Nuclear Oversight Audit of Access Authorization and

PADS

03/16/2020