Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 OCT 2 6 1990 Virginia Electric and Power Company ATTN:
Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-280/90-28 AND 50-281/90-28 OFFICIAL COPY This refers to the inspection conducted by W. E. Holland of.this office on September. 2-29, 199 The inspection* included a review of activities authorized for your Surry facilit At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the repor Areas examined during the inspection are identified in the repor v!ithin these areas, the inspection consisted of selective ex~mi~ations of procedures and representative records, interviews with personnel, and observation of activities in progres The entlosed Inspection Report identifies ~ctivities that appeared to violate NRC requirements that are not cited;. therefore, a response is not require In accordance with 10 CFR 2.790 of the NRC's 11 Rules of Practice, 11 a copy of this letter and its enclosure will be placed in the NRC Public Document Roo In accordance with 10 CFR 2.790 of the NRC 1s 11 Rules of Practice; 11 a copy of this letter and its enclosure will be placed in the NRC Public Document Roo Should ybu have any questjons concerning this letter, please contact u Enclosure:
NRC Inspection Report cc w/encl:
(See page 2)
Sincerely, OR~INAl. SfGNED BY
"11A.RVIN V. ~INKULE Marvin V. Sinkule, Chief Reactor Projects Branch 2 Division of Reactor Projects
- Virginia Electric and Power Compnay cc w/encl:
E. W. Harrell Vic~ President - Nuclear Operatiohs Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 J. P. 0 1Hanlon Vice President - Nuclear Services Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060
- fvi." R. Kans l er Station Manager Surry Power Station P. 0. Box 315 Surry, VA 23883 R. F. Saunders, Manager - *
Nuclear Li~ensing Virginia Electric & Power C Dominion Boulevard Glen Allen, VA 23060 Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, VA 23683 W. T. Lough Virginia Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams P. 0. Box 1535 Richmond, VA 23212 C. M. G. Buttery, M.D., M. Department of Health 109 Goveinor Street Richmond, VA 23219 (cc w/encl cont 1d - See page 3)
ocr 2 6 1sso
Virginia Electric and Power Compnay (cc w/encl cont 1 d)
Attorney General
. Supreme Co~rt Building 101 North 8th Street Richmond, VA 23219 Commonwealth of Vi~ginia bee w/encl:
Document Control Desk DRP Section Chief NRC Resident Inspector U.S. Nuclear Regulatory Commission*
Route 1, Box 166 Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission*
Route 2, Box 78-A Mineral, VA 23117 RII i_RY PFridii ckson: tm 10/:;fJ90
DDT 2 6 1990 r