IR 05000280/1990029

From kanterella
Jump to navigation Jump to search
Forwards Errata to Insp Repts 50-280/90-29 & 50-281/90-29 Cover Ltr
ML18153C464
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/26/1990
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18153C465 List:
References
NUDOCS 9012110196
Download: ML18153C464 (4)


Text

'

,,

November 26,* 1990 Docket Nos. 50-280, 50-281 License Nos~ DPR-32, DPR-37 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

SUBJECT:

ERRATA LETTER FOR NRC INSPECTION REPORT NOS. 50-280/90-29* AND 50-281/90-29

.

-

The above subject inspection report was transmitted to you by letter, dated November 15, 199 It has come to our attention that the report was transmitted with a typographical erro The correct Inspection Report No are 50-280/90-29 and 50-281/90-29.. We have enclosed the corrected page of the standard lette Pl ease discard the superseded page and i rise rt the *

corrected page into your copy of the repor

Enclosure:

Corrected Page of the Standard Letter

REGION II==

101 MARIETTA STREET, ATLANTA, GEORGIA 30323 ENCLOSURE November 26, 1990 Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-280/90-29 AND 50-281/90-29

.This refers to the inspection conducted by P. T. Burnett of this office on October 15-19, 199 The inspection included a review of activities authorized for your Surry facilit At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the repor Areas examined during the inspection are identified in. the repor Within_

these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, violations or deviations were not identified..

In accordance with 10 CFR 2. 790 of the NRC' s "Rules of Practice, 11 a copy of

. this letter and its enclosure will be placed in the NRG Public Document Roo Should you have any questioris concernin~ this lettef, please contact u

Sincerely,

Caudle A. Julian, Chief Engineering Branch

Division of Reactor Safety Enclosure:

NRC Inspecti6ri Report cc w/ encl :..; See pa.ge 2