IR 05000280/1990015

From kanterella
Jump to navigation Jump to search
Insp Repts 50-280/90-15 & 50-281/90-15 on 900319-23.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program Including Review of Training,Changes to Emergency Organization,Audit Repts & Maint of Equipment
ML18153C201
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/20/1990
From: Rankin W, Sartor W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18153C200 List:
References
50-280-90-15, 50-281-90-15, NUDOCS 9005020346
Download: ML18153C201 (6)


Text

Report Nos.:

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, ATLANTA, GEORGIA 30323 APR 2 0 1u, 50-280/90-15 and 50-281/90-15 Licensee: Virginia, Electric and Power Company Glen Alleni VA 23060 Docket Nos.:

50-280 and 50-281 License Nns.: DPR-32 and DPR-37 Facility Name:

Surry 1 and 2 Inspection Conducted: Ma~~-11~_90 Inspector:L<?r~ ~2~ '

w.-M. Sartor



Approved by:~-~~~ ____ _

Scope:

W. H. Rankin, Chief Emergency Preparedness Section Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards SUMMARY 1 /2-c/9t-Date Si'gned

'J/IG/9,*

te Sfgned This routine, announced inspection was conducted in the area of emergency preparednes Several aspects of the emergency preparedness program were inspected to determine if the program was being maintained in a state of operational readiness for responding to emergencie This included a review of training, changes to the emergency organization, distribution of changes to the Emergency Plan and Emergency Plan Implementing Procedures (EPIPs), audit reports, staff augmentation, and the maintenance of selected equipmen Results:

Within the areas inspected, no violations or deviations were identified. the Surry emergency preparedness program was being effectively maintaine Program strengths included the increased emergency preparedness staffing level at both corporate and site, and the increased management support and attention to improving emergency staff augmentation time All areas inspected were indicative of a program being well maintained with the exception of some document control problem~ (Paragraph 3).

/

,:;,c,(1420 __

900502Q}1~ h~nno2~u

~DR ADU~~ ---*poc G!

  • Persons Contacted Licensee Employees REPORT DETAILS
  • W. Benthau, Supervisor, Licensing
  • R. Bilyen, Licensing Engineer E. Casti 11 o, Chemistry Response Team Leader D. Cobb, Control Room Operator/Communicator J. Collins, Director, Emergency Preparedness
  • J. Costello, Station Coordinator, Emergency Planning
  • E. Grechick, Assistant Station Manager
  • D. Hart, Supervisor, Quality Assurance T. Hartwell, Engineering Technician W. Henry, Shift Supervisor
  • E. Smith, Jr., Manager, Quality Assurance
  • W. Thorton, Director, Health Physics and Chemistry D. White, Shift Supervisor L. White, Senior Fire Protection Specialist Nuclear Regulatory Commission
  • J. York, Resident Inspector
  • Attended exit interview Emergency Plan and Implementing Procedures (82701)

Pursuant to 10 CFR 50.47(b) (16), 10 CFR 50.54(q), Appendix E to 10 CFR Part 50, and Section 8 of the licensee's Emergency Plan, this area*

was inspected to determine whether significant changes were made in the licensee I s emergency preparedness program si nee the last unannounced inspection (January 1990), and to assess the impact of any such changes on the overall state of emergency preparedness at the facilit The inspector reviewed the licensee 1s program for making changes to the Emergency Plan and the Emergency Plan Implementing Procedures (EPIPs).

The inspector verified that changes to these documents were reviewed and approved in accordance with l.i censee procedures. * A review of the licensee's Letters of Agreement with offsite emergency response organizations indicated the letters required renewal in accordance with the two year period established for updating the letters. Further review with the corporate emergency planning staff revealed that the licensee had

_ -- already requested the updating of the letters of agreement from the offsite emergency response organization *

The inspector also reviewed the Emergency Telephone Directory referenced in EPIP 3.01 that would be used by the Security personnel for the callout of emergency response personne The Emergency Telephone Director was found to be current and the Security personnel on duty appeared to understand fully their responsibilities in performing the callou No violations or deviations were identifie.

Emergency Facilities, Equipment, Instrumentation, and Supplies (82701)

Pursuant to 10 CFR 50.47(b)(8) and (9), 10 CFR 50.54(q), and Section I of Appendix E to 10 CFR Part 50, this area was inspected to determine whether the licensee's emergency response facilities and other essential emergency equipment, instrumentation, and supplies were mai~tained in a state of operational readiness, and to assess the impact of any changes in this area upon the emergency preparedness progra An assessment of the state of operational readiness of emergency equipment and instrumentation was made by reviewing selected surveillance test procedures (STPs).

The STPs selected were 55.4, Emergency Communication Test; 55.5, Early Warning System Polling Function; and 55.6, Early Warning System Siren Activation Monitoring Tes The results of the STPs reflected equipment that was fully functional in most instances, with the exceptions being identified for prompt corrective actio While reviewing the STPs, the inspector noted there appeared to be several months of missing reports, particularly for the Emergency Communi cati ans Tes Additional searching provided the missing STPs; however, it was apparent that the administrative processing of STPs did not provide for adequate trackin This issue was discussed with li~ensee representatives and the inspector was informed a new program was pending approval that would improve upon the Periodic Test Tracking System currently being use No violations or deviations were identifie.

Organization and Management Control (82701)

Pursuant to 10 CFR 50.47(b)(l) and (16) and Section IV.A of Appendix E to 10 CFR Part 50, this area was inspected to determine the effects of any changes in the licensee's emergency response organization and/or management control systems on the emergency preparedness program and to verify that such changes were properly factored into the Emergency Plan and EPIP The organization and management of the emergency preparedness program were reviewed and discussed with licensee representative The more significant changes in the management of the emergency preparedness program had occurred at the corporate level during 198 Prior to the management changes the Supervisor of Emergency Preparedness reported to.

the Manager, Nuclear Programs who reported to the Vice President of Nuclear Service The Vice President of Nuclear Services position was filled in June 1989, and in November 1989 the Supervisor of Emergency

  • Preparedness position was upgraded to Directot level with the Director of Emergency Preparedness reporting directly to the Vice President of Nuclear Service Additional upgrading of the corporate emergency preparedness staff has been the doubling of the staff to 10 personnel. The increased

. corporate staff has increased the support available to the site, particularly in the area of scenario developmen Changes to the site emergency preparedness staff closely parallels the corporate restructuring with the site staff doubling from one to two and the Station Coordinator Emergency Planning position being elevated one leve The more significant change because of its effect upon emergency planning was the management realignment of the Chemistry Department reporting to the Superintendent Radiation Protection vice the Technical Services Superintenden A parallel change was made in the emergency organization with the Chemistry team now reporting to the Radiological Assessment Coordinato This change now permits both the health physics and chemistry team personne 1 to be directed by the same Coordinator, thus improving the health physics/chemistry coordinatio The site EPIPs provided for the aforementioned change No violations or deviations were identifie.

Training (82701)

Pursuant to 10 CFR 50.47(b)(2) and (15),Section IV.F of Appendix E to 10 CFR Part 50, and Section 7.2 of the licensee's Emergency Plan, this area was inspected to determine whether the licensee's key emergency response personnel were properly trained and understood their emergency responsibilitie The inspector reviewed documentation of the emergency response training program, including training procedures and selected lesson plans, and interviewed members of the instructional staf Based on these re~iews and interviews, the inspector determined that the licensee had established a formal emergency training progra The effectiveness of this formal program was evaluated by wal kthroughs with selected personnel and a walkthrough one evening starting at approximately 7:30 p.m. of the on duty staff that would become the initial emergency response organization if an emergency were to occu All of the personnel interviewed were aware of their emergency assignments and responsibilitie A review of the training records for these personnel the next day documented that their training was complete and curren Additional training records were reviewed by choosing three positions at random from EPIP 3.02, titled TSC Activation, and then verifying the status of training from the personnel on the callout list who would have been called in to fill the selected positions. Again, all required training was found to be curren No violations or deviations were identifie.

Independent Review/Audits (82701) *

Pursuant to 10 CFR 50.47(b){14) and (16) and 10 CFR 50.54(t), this area was inspected to determine whether the licensee had performed an independent review of audits of the emergency preparedness program, and whether the licensee had a corrective action system for deficiencies and weaknesses identified during exercise and drill The inspector had reviewed the audit reports during the previous inspection (January 8-12, 1990) with the exception of Audit Report No. 90-01 which was conducted January 8-29, 1990. A review of this report identified only one Surry finding relative to Fitness for Dut The inspector noted that the Sta ti on Coordinator Emergency Planning had initiated corrective actio No violations or deviations were identifie.

Action on Previous Inspection Findings (92701, 92702) (Closed) Violation 50-280, 281/89-09-04:

Failure to meet the augmentation staff requirements within the time periods specified in Table 5.1 of the Station Emergency Pla The licensee response dated June 12, 1989, was considered acceptable by Region I The 1 i censee stated that notifi cati ans had. been prioritized, corporate callout. procedures had been prioritized, an additional personnel had been designated to staff specific positions where discrepancies in response times had been note The inspector reviewed the completed survei 11 ance test procedures (STP) of the seven most recent callout drills and reviewed the licensee evaluation of the emergency response organization's compositio The inspector was also informed that two personnel had been relocated to insure the augmentation of a key Table 5.1 positio The corrective actions stated in the licensee response had been implemented, and the STP results of the most recent test had been fully successfu Additionally, the inspector noted that the licensee had selected random times to include weekends to conduct their augmentation drill callouts to better evaluate their progra The licensee had also initiated the use of pagers for key personnel which has also improved response time (Closed) IFI 50-280, 281/87-29-12:

Improved command and control of the offsite monitoring team The inspector reviewed the licensee's procedures and interviewed selected personnel designated as the Radioloaical Assessment Coordinator and the Field Team Radio Operato Personnel were fully aware of the procedures in place for maintaining command and control of the offsite monitoring team,.

  • *

5 {Closed) IFI 50-280, 281/89-33-01:

Review licensee's corrective action to enhance PAR decision makin The licensee had prepared a flow chart that improved the PAR decision making process for inclusion into EPIP 1.05, Response to General Emergenc.

Exit Interview The inspection scope and findings were summarized on March 23, 1990, with those persons indicated in Paragraph 1 abov The inspector described the areas inspecte The licensee did not identify as proprietary any of the material provided to or reviewed by the inspector during this inspectio Di ssenti na comments were not received from the 1 i cense Licensee management was informed that a previous violation and two IFis discussed in Paragraph 7 were closed during this inspection.