IR 05000280/1987030

From kanterella
Jump to navigation Jump to search
Ack Receipt of 871128 & 1222 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-280/87-30 & 50-281/87-30.Records Will Be Adjusted to Reflect That No Regulatory Requirements Violation Occurred Re Violation a
ML18152A639
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/11/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8801200139
Download: ML18152A639 (1)


Text

JAN 11 19BB Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart, Vice President, Nuclear Operations

P. 0. Box 26666 Richmond, VA 23251 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-280/87-30 AND 50-281/87-30 Thank you for your responses of November 28, 1987 and December 22, 1987, to our Notice of Violation issued* on October 28, 1987, concerning activities conducted at your Surry facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 After reviewing your letter, we agree with your conclusion that Violation A of the October 28, 1987, Notice of Violation did not constitute a violatio This information was not available to our inspector during the inspectio Accordingly, we will adjust our records to reflect that no violation of regulatory requirements occurred with respect to Violation Your corrective action associated with Violation B will be reviewed during future inspection Your cooperation with us is appreciate

Sincerely, P/

Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety cc:

D. L. Benson, Station Manager bee:

N. E. Hardwick, Manager - Nuclear Programs and Licensing RII JJBl#.

fY7 /88 RII...-:#L'

C/'

FSCantrell 01/;/ /88 8801200139 ~~8abiso PDR ADOCK PDR Q