g U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
50-278/80-25 Docket No.
50-278 License No.
DPR-56 Priority Category C
--
Licensee:
Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Facility Name:
Peach Bottom Atomic Power Station, Unit 3 Inspection at:
Delta, Pennsylvania Inspection conducted: October 29, 1980 Inspectors:
ht.8e
//- / '/ - @ O R. JJ Paolino, Reactor Inspector date signed date signed
.
date signed ted
'/
7/80 Approved by:
t d.
u. toneter, Unter, tngineering Support dat'e signed Section No. 2, RC&ES Branch
,
Inspection Summary:
Inspection on October 29, 198'1 (Report No. 50-278/80-25)
Areas Inspected:
Routine, announced inspection by a regional based inspector of
l motor operated valves and air operated valves of the High Pressure Coolant Injection
!
System to verify component installation as identified and reported by the licensee in response to NRC Bulletin No. 79 ^18.
The inspection involved 8 inspection-hours on site by one NRC regional based inspector.
Results:
No items of noncompliance were identified.
I
'
Region I Form 12 (Rev. April 77)
810110059k
.
,
.
3.
In addition to the above, the inspector examined Air Operated Valves Nos. A0-23-42 and A0-23-43.
The installed Air Operated Valve No.
A0-23-42 did not correspond with the information supplied by the licensee in response to NRC Bulletin 79-018. Air Operated Valve No. A0-23-43 did not have an identification tag and therefore could not be verified as conforming with the information supplied by the licensee.
Discussions with the licensee indicates that the informa-tion on Air Operated Valves is not current.
The licensee stated that the 79-01B response on Air Operated Valves was based on a sur-vey performed in April,1977.
The licensee furnished the inspector a copy of an engineering work letter (Res 5-3, MOD #514D) dated January 22, 1980 for Nameplate Inspection of Air Operated Valves scheduled for completion in February, 1980.
The nameplate identification for Air Operated Valve No. A0-23-43 corresponds with the data listed in the above inspection report indicating the original valve was replaced.
Upon further inspection the inspector noted that the original Air Operated Valve model number for A0-23-42 contained the prefix THT, indicating a high temperature applicatica.
The inspector was unable to verify whether the replacement valve model r. umber 8321A5 (S/N 53481D) was qualified for this application.
The discrepancy between the reported component identification and the actual installation is unresolved pending NRC review of licensee re-evaluation, qualification and submittal of current corrected data in accordance with IE Bulletin No. 79-018 (050-278/80-25-01).
.
3.
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable or items of noncompliance or deviations.. Unresolved item (s) identified in this report are identified in. paragraph 28.
4.
Safety Evaluation Report The acceptability)of the action taken by the licensee to correct the unresolveditem(s listed in Details, paragraph 2B will be documented in the safety evaluation report (SER) that is to be written for Peach Bottom Unit 3.
5.
Exit Interview The inspector met with licensee representatives (listed in Details, para-graph 1) at the conclusion of the inspection on October 29, 1980.
The inspector summarized the purpose and scope of the inspection and the inspection findings.
gem o g g-1, w o N o&SW
_
_
_
-
_
b
-
DETAILS 1.
Persons Contacted Philadelphia Electric Company J. Crews, Branch Supervisor - Field Engineers
- R. Fleishman, Assistant Station Superintendent C. Rogers, Field Engineer
- A. Spector, Electrical Engineer T. Ullrich, Station Superintendent j
U.S. Nuclear Regulatory Commission C. Cowgill, Senior Resident Inspector
'
- A. Blough, Resident Inspector
- Denotes personnel present at the exit interview.
2.
NRC Bulletin 79-01B Installation Verification The inspector reviewed Piping and Instrumentation Diagrams (P&ID) and Diagrams (WD) pertaining to the High Pressure Coolant Elementary Wiring (HPCI) in order to identify select components outside Injection System the containment to determine by visual observation whether the active components and the associated circuits of this system are as identified in the licensee's79-01B submittal of August 21, 1980.
A.
Documents and components selected for this determination include the following:
Final as-built drawing no. 6280-M-1-536(7)38
--
P&ID No. 6280-M-365 revision 20
--
P&ID No. 6280-M-362 revision 19
--
WD No. 6280-E-1181 revision 29
--
WD No. 6280-E-1182 revision 28
--
WD No. 6280-E-1232 revision 14
--
Item No. 53, Motor Operator No. M0-23-57 Limitorque Type
--
SMB-0, S/N 107928 and associate circuit in conduit no. ZB3L318 Item no. 54, Motor Operator No. M0-23-58 Limitorque type SMB-0,
--
S/N 107929 and associate circuit in conduit no. ZB3L315
.
Item No. 97, Motor Operator No. M0-3-14-005D Limitorque type
--
SMB-000, S/N 110689 and associate circuit in conduit no. ZD3LO95 Item No. 98, Motor Operator No. M0-3-14-007B Limitorque type
--
SMB-0, S/N 94660A and associate circuit in conduit no. ZD3LO77 Motor Control Console No's MCC-30837 and MCC-30839 Reactor Bldg,
--
elevation 135 area 15 Control Cabinet No. 30C04B (Indicating Lights)
--
No items of noncompliance were identified,
.