IR 05000277/1980015

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-277/80-15 & 50-278/80-13 on 800519-23 & 29. Noncompliance Noted:Lack of Lighting Access Control,Physical Barriers & Response.Details Withheld (Ref 10CFR2.790)
ML19332A657
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/27/1980
From: Devlin J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19332A652 List:
References
50-277-80-15, 50-278-80-13, NUDOCS 8009160625
Download: ML19332A657 (1)


Text

_

_

-

_ - - - -

_ _ _ _

,

,

Ue S. NUCLEAR REGULATORY COMMISSION

'

-

.

.

OFFICE OF INSPECTION AND CNFORCEMENT

$

REGION I

50-277/80-15 Report No.

50-278/80-13 50-277 DPR-44 Docket No.

Rn_;79 License No.

DPR-56 Safeguards Group Licensee:

Philadelphia Electric Company 2301 Market Street Philadelchia, Pennsylvania 19101 Facility Ncme:

Peach Bottom, Units 2 and 3 Inspection At:

Delta, Pennsylvania Inspection Conducted:

May 19-23 and May 29, 1980 Date of Last Physical Security Inspection Visit:

September 7, 1979 Type of Inspedti n:)

Phy,sical Security Inspectors:

5 do

-

G. C. 5mith, Pnysical decurity Inspector I datie date

'.

date h

Approved by:

Y

i (J/ Devlin, Chief, Physical Security

/. date Section, Safeguards Branch

'

Inspection Summary:

Areas Inspected:

Included review of the Security Plan;- Security Program Audit; Security Organization; Physical Barriers; (Protected Area) and (Vital Areas);

Lighting; Access Control; (Search) (Escorting) (Identif'ication, Authorization and Badging) and (Vital Areas) Alarm Stations; Detection Aids; Communicatio.1s; Testing and Maintenance; Compensatory Measures; Response; Locks, Keys and Combina-tions; Records and Reports; and Independent Inspection.

The inspection involved 47 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br /> onsite by one NRC inspector. The inspection was begin during a regular shift period; 8 inspection hours were accomplished during off shift periods.

Resul ts:

Seven items of noncompliance'were identified in the fifteen areas examined during.the inspection.

Independent Inspection (Para. 4), Physical Barrier (Protected Area) (Para. 8), Lighting (Para.10), Access Control (Identifi-

.

cation, Para. 11), (Search, Para. 12), Response (Para. 21), Locks and Keys (Para. 22).

tso0916ofpy Region I Form 167 (August 1979)

.,

-.

.