MONTHYEARIR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) IR 05000277/20220062023-03-0101 March 2023 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) ML23019A0752023-01-19019 January 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000277/2023011 and 05000278/2023011 IR 05000277/20220052022-08-31031 August 2022 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) IR 05000277/20210062022-03-0202 March 2022 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) IR 05000277/20210052021-09-0101 September 2021 Updated Inspection Plan for the Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2021005 and 05000278/2021005) IR 05000277/20200062021-03-0303 March 2021 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2020006 and 05000278/2020006) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information IR 05000277/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000277/2020005 and 05000278/2020005) ML20119A8852020-04-28028 April 2020 Stations, Unit 3, Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20190062020-03-0303 March 2020 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2019006 and 05000278/2019006) IR 05000277/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000277/2019005 and 05000278/2019005) ML19119A1202019-04-29029 April 2019 Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20180062019-03-0404 March 2019 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2018006 and 05000278/2018006) ML18330A0532018-11-21021 November 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000277/2019403 and 05000278/2019403 IR 05000277/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000277/2018005 and 05000278/2018005) IR 05000277/20170062018-02-28028 February 2018 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501) ML17340A4112017-12-0505 December 2017 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000277/20170052017-08-28028 August 2017 Updated Inspection Plan Letter 05000277/2017005 and 05000278/2017005 with Rpt. 22 IR 05000277/20160062017-03-0101 March 2017 Annual Assessment Letter Units 2 and 3 - Report Nos. 05000277/2016006 and 05000278/2016006 with Report 22 IR 05000277/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006) IR 05000277/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2015005 and 05000278/2015005) IR 05000277/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001) IR 05000277/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2014006 and 05000278/2014006 IR 05000277/20130012014-03-0404 March 2014 ROP-14 2013 Peach Bottom Atomic Power Station Annual Assessment Letter, Report 05000277/2013001 and 05000278/2013001, and Inspection Plan IR 05000277/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006 IR 05000277/20120012013-03-0404 March 2013 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 (Report 05000277/2012001 and 05000278/2012001) ML12318A0022012-11-0909 November 2012 Notification to Perform an Inspection of Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1 - 7 and Request for Information IR 05000277/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Peach Bottom Atomic Power Station (Report 05000277/2012006 and 05000278/2012006) IR 05000277/20110012012-03-0505 March 2012 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277-11-001 and 05000278-11-001) ML1124113452011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Peach Bottom Atomic Power Station IR 05000277/20100012011-03-0404 March 2011 Annual Assessment Letter for Peach Bottom Atomic Power Station, EOC-11 (05000277/2010001 and 05000278/2010001) ML1024404132010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Peach Bottom Atomic Power Station, Units 2 and 3 ML1006210092010-03-0303 March 2010 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277-10-001 and 05000278-10-001) and Report 22 ML0924402532009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Peach Bottom Atomic Power Station IR 05000277/20090012009-03-0404 March 2009 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277/2009001 and 05000278/2009001) ML0824704542008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Peach Bottom ML0734705752007-12-13013 December 2007 ROP - Peach Bottom - Change to Inspection Plan, 12/13/07 ML0724306242007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 ML0706106152007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Peach Bottom Station (05-277-07-001 and 05-278-07-001) ML0624305232006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station IR 05000277/20060012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 05000277/2006001 and 05000278/2006001) ML0524207012005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station ML0506107082005-03-0202 March 2005 Annual Assessment Letter 2005001-Peach Bottom ML0424404642004-08-30030 August 2004 2004 Peach Bottom Mid-Cycle Performance Review and Inspection Plan ML0406305452004-03-0303 March 2004 2003-04 Annual Assessment Letter - Peach Bottom IR 05000277/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 50-277/03-001, 50-278/03-001) IR 05000277/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 50-277/02-01, 50-278/02-01 2023-08-31
[Table view] Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |
Text
UNITED STATES N UCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION (05000277 12010001 and 0500027812010001 )
Dear Mr. Pacilio:
On February 8,2011, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3.
The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from January 1,2010 through December 31,2010.
This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
As discussed in 2009 and 2010 Assessment Letters (M11006210091 and ML102440413), the staff issued a Confirmatory Order (Order) to Exelon Generation Company, LLC (Exelon) on December 1, 2009, which formalized an agreement reached through the NRC's Alternative Dispute Resolution process regarding two acts of deliberate misconduct (ML093350150). The NRb conducted a follow-up inspection during the 4th quarter of 2010 using lP 92702, and the inspectors determined that PBAPS and Exelon have satisfied all of the terms of the Order (MLl 10341057). As documented in a February 18, 2011, letter to Exelon, the NRC has determined Exelon to be in compliance with the Order and no further action is planned (M11104e0436).
Designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly-available using the accession number in ADAMS. The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NiC proviOes the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspection program, we plan to conduct inspection Procedure 60855, "Operation of an lSFSl." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes'
ln accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). AD4Mq is accessible from the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).
please contact me at (610) 337-5120 with any questions you have regarding this letter.
fu-au
Sincerely, PaulG. Krohn, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. NPF44, NPF-56 cc dencl: Distribution via ListSdrv Peach Bottom I nspection/Activity Plan The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review' The NiC proviOes the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. ln addition to the baseline inspection program, we plan to conduct inspection Procedure 60855, "Operation of an lSFSl." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
ln accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). AD4MS is accessible fr6m the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).
please contact me at (610) 337-5120 with any questions you have regarding this letter.
Sincerely,
/RA/
Paul G. Krohn, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56 cc w/encl: Distribution via ListServ Peach Bottom Inspection/Activity Plan Distribution Wencl: (via E-mail) J. Trapp, Rl OEDO W. Dean, RA DRS Branch Chiefs (6)
D. Lew, DRA N. McNamara, Rl, SLO D. Roberts, DRP D. Tifff, Rl, slo J. Clifford, DRP D. Screnci, Rl, PAO P. Wilson, DRS N. Sheehan, Rl, PAO P. Krohn, DRP R. Barkley, Rl, ORA A. Rosebrook, DRP ROPassessment Resource E. Torres, DRP RidsNrrPMPeachBotlom Resource S.lbarrola, DRP RlDSNrrDorlLpll -2 Resource F. Bower, DRP, SRI RidsNrrDirslpab A. Ziedonis, DRP, Rl ROPreports Resource S. Schmift, DRP, OA SUNSI REVIEW COMPLETE: AAR (Reviewer's Initials) ML110620331 C ENF,DOCX DOC NAME:S:\ROP-11 EOC REVIE\^^BRANCH 4\PB\PEACH BOTTOM 2O1O AA LETTER REV After declaring this document ?n Official Agency Record" it gi!! be released to the Public.
To receive a copy of this indicale ln the bor: 'G" = 'l{'= No copy OFFICIAL RECORD COPY
Page 'l of 3 Peach Bottom 041612011 06:52:03 Inspection / Activity Plan Report 22 01101t2011 - 06130t2012 Planned Dates No. of Staff N.r-rnL'"t Start End on Site O1I31EXM .INITIAL OPERATOR LICENSING EXAMS z 01t10t2011 o1t14t2011 U01769 FY11 - PEACH BOTTOM UNITS 2&3 lNlTlAL OPERATOR LICENSING EXAM 2 01t311201'l 02t11t2011 U01769 FY1'I . PEACH BOTTOM UNITS 2&3 INITIAL OPERATOR LICENSING EXAM EP -EPANNUALREPORT 2,3 01t0'112011 1A31/2011 lP 7111406 Drill Evaluation 7111118 PB REQUAL INSP WP/F RESULTS
.
2,3 03t07t2011 o3t11t2011 lP 71111118 Licensed Operator Requalification Program EP PROGR . EP PROGRAM INSPECTION 2,3 0?,1412011 0a18nof lP 711'1402 Alert and Notification System Testing 2,3 0?,14t2011 0218t2011 lP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2,3 oa14PO11 0a18t2011 lP 7111404 Emergency Action Level and Emergency Plan Changes 2,3 02t14t2011 o2t18t2011 lP 7111405 Conection of Emergency Preparedness Weaknesses and Deficiencies 2,3 o?j14t2011 0u18t2011 lP 71151-EP01 Drill/ExercisePerformance 2,3 02t14t2011 o2t18t2011 lP 71151-EP02 ERO Drill Participation 2,3 ozt14t2011 oiJ18t2011 lP 71151-EW3 Alert & Notification System 7111121 -CDBI 2,3 o214t2011 ozt18t2011 lP 711'1121 Component Design Bases Inspection 2,3 o2t28t2011 03t0/.t2011 lP 7111121 Component Design Bases Inspection 2,3 o3t07t2011 o3t11t2011 lP 7111'121 Component Design Bases Inspection TI-179 . .
TI.179 NSTS TEMPORARY INSPECTION 2,3 04t04t2011 o4t08t2011 lP 25151179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS RADWASTE - RAD WASTE 2,3 Mto4t2011 o4t08t2011 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 60855 .ISFSI CATTIPAING LOADING INSPECTION 2,3 o/.tol12011 06/30/201 1 lP 60855 Operation Of An ISFSI HP-71124 . HP-/INSTRUMENTS/REMP/ISFSI 2,3 o6to6t2011 o6n0nofi lP 60855 Operation Of An ISFSI z,J 06/06/201 1 06/10/201 1 lP 71124.05 Radiation Monitoring Instrumentation z,J o6to612011 06t'1ot2011 lP 71124.A7 Radiological Environmental Monitoring Program 71124 - RADIOACTIVE GASEOUS AND LIAUID EFFLUENT 2,3 06/06/201 1 o6t10t2011 lP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 711528 - Pt&R z,J 07t2512011 07t29t2Afi lP 71 1528 ldentification and Resolution of Problems 2,3 08to8t2011 08112t2011 lP 71152A ldentificalion and Resolution of Problems This report does not include INPO and OUTAGE activities. I This report shows only on-site and announced inspection procedures. 3
Page 2 of 3 Peach Bottom o2t16t2011 06:52:03 Inspection / Activity Plan Report 22 01to112011 - 06130t2012 No. of Staff on Site MC 2561 . SAFSTOR INSPECTION 1 08t15t2011 o8t19t2011 lP 36801 Organization, Management, And Cost Conlrols At Permanently Shutdown Reactors 1 oBt15t2011 08t19t2011 lP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reaclors 1 ou15t2011 08/19/201 1 lP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors I 08t15t201',! o$t1912011 lP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors 1 0u15t2a11 o8,t19t2011 lP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 ou15t2011 08t19t2011 lP 83750 Occupational Radiation Exposure I 08/1 5/201 1 ou19t2011 lP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 o8,t15t2011 08/19i2011 lP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials HP.7 1 124 . HP.ALARA/AIR/DOSE/IN STRU M ENTS'ACCESS 2,3 08t2i,2011 o8t26t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 2,3 o8t22t2011 o8t2612011 lP 71'i,24.02 Occupational ALAM Planning and Controls 2,3 o8na20f 0a26agf lP 71124.03 In-PlantAirbome Radioactivity Control and Mitigation 2,3 o8t2212011 o8t2612011 lP 71124.04 Occupational Dose Assessment 2,3 o8122t2011 08t2612011 lP 71124.05 Radiation Monitrcring Instrumentation HP.7 1 124 . ACCESS'ALARA/AIR/DOSE/INSTRUIIENTS 2,3 09t19t2011 09t23t20't1 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 2,3 09/19/201 1 09t23t2011 lP 71124.02 Occupational AIARA Planning and Controls 2,3 ogt19t2011 o9t23t2011 lP 71 124.03 In-Plant Airbome Radioactivity Control and Mitigation 2,3 09t19t20't1 o9t2312011 lP 71124.04 Occupational Dose Assessment 2,3 09/19/201 1 o9t23t2011 lP 71124.05 Radiation Monitoring Instrumentation 7111108G . U3INSERVICE INSPECTION 3 09/'r9/2011 0912312011 lP 7111108G InservicelnspectionActivities-BWR HP-71124 -ACCESS/Al-ARA/DOSE/PI 2,3 11t14t2011 11t18t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 2,3 11t14t201',1 't1t18t2011 lP 71124.02 Occupational ALARA Planning and Conlrols 2,3 11t14t2011 11tlanul lP 71'124.04 Occupational Dose Assessment J 11t14t2011 11t1812011 lP 71 151-OR01 Occupational Exposure Control Effectiveness 2 11t14t2011 1111812011 lP 71151-PR01 RETS/ODCM Radiological Efiuent EP EX . EP EXERCISE EVALUATION 2,3 o3t26t2012 0313012012 tP 7111401 Exercise Evaluation 2,3 o3t2612012 o3t30t2012 lP 7111404 Emergency Action Level and Emergency Plan Changes 71124 . RADIOLOGICAL HAZARD AND EXPOSURE CONTROL z,J 04to9t2012 04t13t2012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls ilhis report does not include INPO and OUTAGE activities. I This report shows only on-site and announced inspection procedures. I r-ffir_rl
Page 3 of 3 Peach Bottom 02J1612011 06:52:03 Inspection / Activity Plan Report 22 01t01t2011 - 06t30t2012 INumber unit Planned Dates Start End 71124 . OCCUPATIONAL ALARA 2,3 o4t09t2012 04t13t2012 tP 71124.02 Occupational ALARA Planning and Controls 71124 . AIRBONE RADIOACTIVIW 2,3 04t09t2012 04t13t2012 tP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation 71124 . OCCUPATIONAL DOSE ASSESSMENT 2,3 04t09t2012 04t13t2012 lP 71124.04 Occupational Dose Assessment TRI FI . TRIENNIAL FIRE PROTECTION INSPECTION 2,3 0/.t30t2012 o5t04t2012 rP 711't1057 Fire Protection ffriennial]
2,3 osh4t2012 ost18nu2 tP 71111057 Fire Protection ffriennial]
71121 . RAD HAZ ASSESS EXPOSURE CONTROLS 2,3 06104t2012 06to8r2012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 71124 . OCCUPATIONAL ALARA 2,3 o6to4t20't2 o6t08t2012 lP 71124.02 Occupational ALARA Planning and Controls 71124 . OCCUPATIONAL DOSE ASSESSMENT 2,3 o6to4t2012 06t08t2012 tP 71124,U Occupational Dose Assessment 71124 . RADIATION MONITORING INSTRUMENTATION 2,3 o6to4t2012 o6t08t20't2 tP 71124.05 Radiation Monitoring Instrumentation ifhis report does not include INPO and OUTAGE activities. t This report shows only on-site and announced inspection procedures. I ffi-- tl