IR 05000277/2013001

From kanterella
(Redirected from IR 05000278/2013001)
Jump to navigation Jump to search
ROP-14 2013 Peach Bottom Atomic Power Station Annual Assessment Letter, Report 05000277/2013001 and 05000278/2013001, and Inspection Plan
ML14058A409
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/2014
From: Fred Bower
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
BOWER, FL
References
IR-13-001 IR-13-001
Download: ML14058A409 (6)


Text

rch 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013001 AND 05000278/2013001)

Dear Mr. Pacilio:

On February 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station, Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Peach Bottom Atomic Power Station, Units 2 and 3, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Peach Bottom Atomic Power Station, Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised beginning in calendar year (CY) 2014. New cross-cutting aspects identified in CY 2014 will be coded under the latest revision to IMC 0310. Cross-cutting aspects identified in the last six months of 2013 using the previous terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310. The revised cross-cutting aspects will be evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305 starting with the CY 2014 mid-cycle assessment review.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 49001, EC/FAC Power Uprate - Inspection of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Program, IP 71003, Unit 3, Post-Approval Site Inspection for License Renewal, and IP 71004, Power Uprate. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-277, 50-278 License Nos.: DPR-44, DPR-56 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML14058A409 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt SHansell/ GSB for SBarber/ GSB FBower/ FLB DATE 02/26/14 02.26/14 02/26/14

Page 1 of 3 Peach Bottom 02/13/2014 08:59:47 Inspection / Activity Plan Report 22 01/10/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP ANNUAL REPORT 4 2, 3 01/01/2014 12/31/2014 IP 7111406 Drill Evaluation UPRATE - 71004 - POWER UPRATE 3 2, 3 01/01/2014 12/31/2014 IP 71004 Power Uprate 71124 - HP 1 2, 3 01/13/2014 01/17/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 01/13/2014 01/17/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 01/13/2014 01/17/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 01/13/2014 01/17/2014 IP 71124.04 Occupational Dose Assessment 71003 - U3 LR COMMITMENTS PHASE 2 2 3 01/21/2014 01/24/2014 IP 71003 Post-Approval Site Inspection for License Renewal CDBI - CDBI 7 2, 3 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 2, 3 03/17/2014 03/21/2014 IP 7111121 Component Design Bases Inspection 2, 3 03/31/2014 04/04/2014 IP 7111121 Component Design Bases Inspection EP EXER - EP EXERCISE INSPECTION 2 2, 3 04/07/2014 04/11/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 71124 - HP 1 2, 3 05/19/2014 05/23/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/19/2014 05/23/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 05/19/2014 05/23/2014 IP 71124.05 Radiation Monitoring Instrumentation TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 06/09/2014 06/13/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2561 - SAFSTOR 1 1 07/28/2014 07/30/2014 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1 07/28/2014 07/30/2014 IP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 1 07/28/2014 07/30/2014 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 07/28/2014 07/30/2014 IP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors 1 07/28/2014 07/30/2014 IP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 07/28/2014 07/30/2014 IP 83750 Occupational Radiation Exposure 1 07/28/2014 07/30/2014 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 07/28/2014 07/30/2014 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials 71124 - RETS 1 2, 3 09/08/2014 09/12/2014 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Peach Bottom 02/13/2014 08:59:47 Inspection / Activity Plan Report 22 01/10/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RETS 1 2, 3 09/08/2014 09/12/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - HP 1 2 10/27/2014 10/31/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 10/27/2014 10/31/2014 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - U2 INSERVICE INSPECTION 1 2 10/27/2014 10/31/2014 IP 7111108G Inservice Inspection Activities - BWR IP49001 - EC/FAC POWER UPRATE 1 2 11/03/2014 11/07/2014 IP 49001 Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 3/23EXAM - PEACH BOTTOM INITIAL EXAM 3 2 02/23/2015 02/27/2015 U01911 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM 2 03/23/2015 04/03/2015 U01911 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM EP - EP ANNUAL REPORT 4 2, 3 01/01/2015 12/31/2015 IP 7111406 Drill Evaluation 71124 - HP 1 2, 3 02/23/2015 02/27/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 02/23/2015 02/27/2015 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 02/23/2015 02/27/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation PI&R - PI&R - BIENNIAL 1 2, 3 03/02/2015 03/06/2015 IP 71152B Problem Identification and Resolution 2, 3 03/16/2015 03/20/2015 IP 71152B Problem Identification and Resolution TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 4 2, 3 03/16/2015 03/20/2015 IP 7111105T Fire Protection [Triennial]

2, 3 03/30/2015 04/03/2015 IP 7111105T Fire Protection [Triennial]

7111111B - PB REQUAL INSP W/ P/F RESULTS 2 2, 3 03/16/2015 03/20/2015 IP 7111111B Licensed Operator Requalification Program 71124.07 - REMP 1 2, 3 06/22/2015 06/26/2015 IP 71124.07 Radiological Environmental Monitoring Program 2561 - SAFSTOR 1 1 06/27/2015 06/30/2015 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1 06/27/2015 06/30/2015 IP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 1 06/27/2015 06/30/2015 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 06/27/2015 06/30/2015 IP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Peach Bottom 02/13/2014 08:59:47 Inspection / Activity Plan Report 22 01/10/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2561 - SAFSTOR 1 1 06/27/2015 06/30/2015 IP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 06/27/2015 06/30/2015 IP 83750 Occupational Radiation Exposure 1 06/27/2015 06/30/2015 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 06/27/2015 06/30/2015 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.