Forwards IE Insp Rept 50-278/80-25 on 801029.No Noncompliance Noted
ML20002C579
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/25/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20002C580 List:
References
NUDOCS 8101100512
Download: ML20002C579 (2)


See also: IR 05000278/1980025

Text

I

15-

'

"

c,0

(4

UNITED STATES

NUCLEAR REGULATORY COMMisslON

'

f

D'I

j

REGION I

,

w

g

g

631 PARK AVENUE

.-

cf

KING OF PRU$$1 A, PENNSYLVANI A 19406

~

,

.....

Docket No. 50-278

~

b,

j

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection No. 50-278/80-25

This refers to the routine inspection conducted by Mr. R. J. Paolino of this

office on October 29, 1980, at Peach Bottom Atomic Power Station-Unit 3,

located at Delta, Pennsylvania of activities authorized by NRC License Number

DPR-56 and to the discussions of our findings held by Mr. R. J. Paolino with

Mr. R. Fleishman and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

f

D101100m%

-

,,,,_+

L:

_.

---,, -

-

> -- -

.

.

Philadelphia Electric Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcenent Inspection

Report Number 50-278/80-25

cc w/ encl:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raynond L. Hovis, Esquire (Without Report)

Michael J. Scibinico, II, Assistant Attorney General (Without Report)

..

.

- - . . -

w.

,y.

.-

~

,

y

.-

-e---,

-r