Forwards Insp Repts 50-275/97-16 & 50-323/97-16 on 970831- 1011.No Violations Noted.Activities at Facility Were Conducted in Conscientious & Professional Manner W/Focus on Safety & Procedural Compliance
ML16343A534
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/31/1997
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D855 List:
References
50-275-97-16, 50-323-97-16, NUDOCS 9711120044
Download: ML16343A534 (10)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION =NBR:9711120044 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET

~

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275

~

~

~

~

~

~

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION WONG,H.J.

Region 1 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION RUEGER,G.M.

Pacific Gas

&. Electric Co.

SUBJECT:

Forwards insp repts 50-275/97-16

& 50-323/97-16 on 970831-1011.No violations noted. Activities at facility were conducted in conscientious

& professional manner w/focus on safety

& procedural compliance.

DISTRIBUTION CODE:

IE01F COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS ILE CENT HHFB NRR/DRPM/PERB OE DIR RGN4 FILE

EXTERNAL: LITCO BRYCE, J H

. NRC PDR COPIES LTTR ENCL

1

2

1

1

'1

.1

1

1

1

1

RECIPIENT ID CODE/NAME BLOOM,S AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS3 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL

1

1

1

1

1

1

1

1

1

D E

N NOTE TO ALL "R..DS" REC BIEN:S:

PLEASE HE'

US.O RE:

E ~AS.E.

.O:-~YE.

UR NA.!E OR ORSANIZATI N RE.OVED PROM DISTRIBUTION LISTS OR REDUCE

.:"::- NL.!BER

." : P:E" RE E VED BY Y "

R Y ~R ORSA.':IZATION, CONTAC.. THE DOCUMENT CONTROL DESK (DC

)

ON EX.ENSI N 4'=-""."3 TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

C

~p,fE AEQII 'fp0 rr 4q

L)

I

+**t UNITED STATES NUCLEAR REGULATORY COMMlSSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

SUBJECT:

NRC-INSPECTION REPORT 50-275/97-016; 50-323/97-016

Dear Mr. Rueger:

An NRC inspection was conducted August 31 through October 11, 1997, at your Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the scope and results of that inspection.

During the six-week period of this inspection, activities at your facility were conducted in a conscientious and professional manner with focus on safety and procedural compliance.

Your personnel demonstrated sound conservative judgement in setting priorities for correcting equipment problems.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR).

Should you have. any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Howard J. Wong, Chief Reactor Projects Branch E

Docket Nos.:

50-275 50-323 License Nos.:

DPR-80 DPR-82 97iii20044 97i03i PDR ADOCK 05000275

PDR lllllllllllllllllIillllmlllllllillll

Pacific Gas and Electric CompanY-2-Enclosure:

NRC Inspection Report 50-275/97-01 6; 50-323/97-01 6 cc w/enclosure:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California '4102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120

Pacific Gas and Electric Company 1]

Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company

.4-E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

DOCUMENT NAME:R:i DCtiDC716RP.DBA To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures

"N" = No copy RlV:RI: DR P/E 5': DR P/E c

DBAllen ~~ ~~

HJWong OM 10/g297 10/9 /97 OFFICIAL RECORD COPY