CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9708190249 DOC.DATE: 97/08/08 NOTARIZED:
NO DOCKET I FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuc'ear Power Plant, Unit 2, Pacific Ga 05000323 UTH.NAME AUTHOR AFFILIATION YNN,T.P.
Region 4 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION RUEGER,G.M.
Pacific Gas 6 Electric Co.
SUB'ECT: Forwards insp repts 50-275/97-10
& 50-323/97-10 on 970608-0719
& NOV.Violation re failure to follow applicable procedures for realigning vital power source to instrument panel.
DISTRIBUTION CODE:
IE01F COPIES RECEIVED:LTR g ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
G RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS FILE CEN NRR/DRCH/HHFB NRR/DRPM/PERB OE DIR RGN4 FILE
EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL
1
2
1
1
1
1
1
1
1
'
RECIPIENT ID CODE/NAME BLOOMERS, AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS3 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL
1
1
1
1
1
1
1
1
1
R D
E NOTE TO ALL "RIDS" RECIPIENTS:
LEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL ESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF CO>IES REQUIRED:
LTTR
ENCL
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA OR!YE, SUITE ~00
SUBJECT:
NRC INSPECTION REPORT 50-275/97-10; 50-323/97-10 AND NOTICE OF VIOLATION
Dear Mr. Rueger:
This refers to the inspection conducted on June 8 through July 19, 1997, at your Diablo Canyon Nuclear Power Plant, Units 1 and 2, reactor facility. The enclosed report presents the scope and results of that inspection.
During the inspection period, two violations were identified.
The first violation involved the failure to follow applicable procedures for realigning a vital power source to an instrument panel.
The second violation involved a missed surveillance requirement to demonstrate containment integrity by periodically verifying a manual valve was secured in the closed position.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
9708i90249 970808 PDR ADQCK 05000275
Sincerely, Thomas P. Gwynn, Director Division of Reactor Projects Dockets:
50-275 50-323 Licenses:
DPR-80 DPR-82 Enclosures:
Notice of Violation NRC Inspection Report 50-275/97-10; 50-323/97-10 IIIIIIIIIIIIIIIIlgglIIIlllllIlllllll
Pacific Gas and Electric Company-2-cc w/enclosures:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 1 64 Pismo Beach, California 93448 Chairmar San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns)Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120
Pacific Gas and Electric Company Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
Pacific Gas and Electric Company-4-E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)
DOCUMENT NAMEt DcttDC710RP.MDT To receive copy of document, indicate In box: "C" = Copy without en ures
"E" = Copy th enctosures
"N" = No copy RIV:SRI/DR P/E MDTschiltz 8/g/97 C:DRP/E HJWong / ~
8/
/97 D:WCFO KEP rkins 8/
D:DRP TP ynn
/97 OFFICIAL RECORD COPY
/g uf
0