IR 05000269/1989022
ML16223A691 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 07/24/1989 |
From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Tucker H DUKE POWER CO. |
Shared Package | |
ML15224A562 | List: |
References | |
NUDOCS 8908010010 | |
Download: ML16223A691 (1) | |
Similar Documents at Oconee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML15113A7511999-09-23023 September 1999
[Table view]Concludes That All Info Requested by GL 98-01 & Suppl 1 Re Y2K Readiness of Computers at NPPs Provided by Util & GL 98-01 Considered Closed for Ons,Units 1,2 & 3 ML15261A2411999-09-17017 September 1999 Confirms 990916 Telcon Between L Nicholson of Licensee Staff & R Carroll of NRC Re Mgt Meeting to Be Conducted on 991006 in Atlanta,Ga to Discuss Licensee Status of Ongoing Improvement Initiatives at Oconee Nuclear Station ML15261A4181999-09-10010 September 1999 Forwards Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Ten Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15112A7611999-09-0909 September 1999 Forwards Safety Evaluation of Unresolved Safety Issue A-46 Program Implementation,Including Plant Hydro Station & Switchyard ML15261A2711999-08-11011 August 1999 Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML16134A5591999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML15113A7311999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Responses to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Movs, Issued on 960918 ML15261A4151999-07-30030 July 1999 Forwards Insp Repts 50-269/99-04,05-270/99-04 & 50-287/99-04 on 990523-0703.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML15261A2701999-07-14014 July 1999 Confirms Telcon Between Je Burchfield & Re Carroll on 990708 Re Mgt Meeting Scheduled 990730 in Atlanta Ga.Purpose of Meeting to Discuss Status of Open EFW Insp Items & Engineering Initiatives IR 05000269/19990031999-06-17017 June 1999 Forwards Insp Repts 50-269/99-03,50-270/99-03 & 50-287/99-03.Violations Being Treated as Noncited Violations ML15112A5001999-06-16016 June 1999 Forwards SER Re Licensee 980706 Application to NRC for Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating License for Addl 20 Years.Open Items Must Be Resolved Before NRC Can Make Final Determination on Application ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML15261A2631999-06-0202 June 1999 Provides NRC Decision on Licensee 980604 Request for Reconsideration of Violation B of NOV Issued on 980504 Re Timeliness in Reporting Design Basis Events or Conditions at Plant Facility ML15261A2641999-06-0202 June 1999 Informs That Meeting Re Performance of Oconee Nuclear Station Will Be Held on 990621 ML15261A4061999-05-24024 May 1999 Forwards Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Scoping & Screening Portion of License Renewal Activities Were Conducted as Described in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML15113A6811999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Div of Licensing Project Mgt Created.Rl Emch Section Chief for Oconee.Reorganization Chart Encl ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates ML15261A2481999-04-0202 April 1999 Provides Summary of 990324 Meeting with DPC at Oconee Nuclear Station Re Activities of NRC Management Oversight Group & Licensee Update to Oconee Recovery Plan.List of Meeting Attendees,Dpc Presentation Handout & Checklist Encl ML15261A3991999-03-26026 March 1999 Forwards Insp Repts 50-269/99-01,50-270/99-01 & 50-287/99-01 on 990117-0227.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML15113A6061999-03-17017 March 1999 Discusses GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Hrps, for Plant,Units 1, 2 & 3.Determined That Duke Has Provided Info Requested by GL 97-04.Staff Considers GL Closed for Units ML15261A2261999-03-0101 March 1999 Confirms Telephone Conversation on 990201 Re Two Mgt Meetings to Be Conducted on 990324 at Oconee Nuclear Station.Purpose of Meetings Will Be to Discuss NRC Mgt Oversight Group Issues & Oconee Performance Improvement ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML15112A3991999-02-16016 February 1999 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves ML15261A3951999-02-12012 February 1999 Forwards Insp Repts 50-269/98-11,50-270/98-11 & 50-287/98-11 on 981129-990116 & Notice of Violation ML20206S5951999-02-0303 February 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Their Entirety ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML15112A3861999-01-15015 January 1999 Requests Clarification for 981119 RAI Re Review of License Renewal Application ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail ML15112A3701999-01-0505 January 1999 Forwards Staff Assessment of Hpis Mu Line Weld Crack & Related B&Wog Response ML15112A3671998-12-29029 December 1998 Forwards RAI for Review of Plant Environ Rept Associated with Util Application for License Renewal Submitted by .Areas Related to Severe Accident Mitigation Alternatives Where Addl Info Needed IR 05000269/19983011998-12-24024 December 1998 Forwards Exam Repts 50-269/98-301,50-270/98-301 & 50-287/98-301 Administered on 981130-1203.All Candidates Passed Examination,Representing 100% Pass Rate.Simulation Facility Rept Included ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 ML15217A1961998-12-0707 December 1998 Ack Receipt of Related to Scoping Process for Relicensing of Oconee Nuclear Station,Units 1,2 & 3 & Clarifies Issue of Concern Re Extent of Relicensing Process ML15112A3451998-12-0404 December 1998 Forwards RAI Re Plant,Units 1,2 & 3 License Renewal Application.Addl Info Requested in Encl Sections of OLRP-1001 ML15112A3441998-12-0303 December 1998 Forwards Request for Addl Info for Review of License Renewal Application for Oconee Nuclear Station Units 1,2 & 3.Request Re OLRP-1001,Section 4.11.Response Requested within 30 Days of Receipt of Ltr 05000269/LER-1998-012-01, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date ML15112A3411998-12-0303 December 1998 Forwards Request for Addl Info for Review of License Renewal Application for Oconee Nuclear Station,Units 1,2 & 3.Encl Questions from Matls & Chemical Engineering Branch Re OLRP- 1001 Sections 3.4.7,3.4.8,3.4.9,3.5.2,3.5.3,3.5.5 & 3.5.8 ML15112A7031998-11-25025 November 1998 Forwards Request for Addl Info Re Review of Oconee Nuclear Station,Units 1,2 & 3 License Renewal Application,Dtd 980706,specifically,OLRP Sections 1.5.3,2.6,3.2,3.6 & 5.6. Response Requested within 30 Days of Ltr Receipt ML15112A6991998-11-24024 November 1998 Forwards RAI Re Review of Plant Units 1,2 & 3 License Renewal Application.Schedule for Submittal of Responses Requested to Be Provided within 30 Days of Receipt of Ltr ML15112A6931998-11-20020 November 1998 Forwards RAI Re License Renewal Application.Encl Questions from Reactor Sys Branch Re Section 1.5.2 of OLRP-1001 ML15112A6891998-11-20020 November 1998 Forwards RAI for Review of Oconee Nuclear Station,Units 1 & 2 Re License Renewal Application.Encl Questions from Plant Sys Branch Re Section 2.5.13 of OLRP-1001 ML15112A6861998-11-20020 November 1998 Forwards RAI for Review of Oconee Nuclear Station,Units 1 & 2 Re License Renewal Application.Encl Questions from Mechanical Enginering Branch Re Sections 3.4.4 & 3.5.5 of OLRP-1001 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20058H0631990-11-0606 November 1990
[Table view]Forwards Partially Withheld Insp Repts 50-269/90-32, 50-270/90-32 & 50-287/90-32 on 901015-19 ML15260A1601990-10-16016 October 1990 Ack Receipt of 901002 Supplemental Response to NRC Re Insp Repts 50-269/89-05,50-270/89-05 & 287/89-05 ML20058B2271990-10-12012 October 1990 Confirms 901010 Telcon W/T Curtiss Re Request for Regional Waiver of Compliance.Waiver Granted on One Time Basis & for Max of 4 H to Allow Testing of Reactor Coolant Makeup Pump Prior to 901102 ML20058A6491990-10-0202 October 1990 Forwards SALP Repts 50-269/90-24,50-270/90-24,50-287/90-24 & 72-0004/90-24 for Feb 1989 - Jul 1990 ML15260A1531990-09-21021 September 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $25,000 Proposed in NRC ML16259A2411990-09-18018 September 1990 Advises That Rev 35 to Crisis Mgt Plan Meets Planning Stds of 10CFR50.47(b) & 10CFR50,App E & Acceptable ML15260A1471990-09-12012 September 1990 Ack Receipt of Forwarding Payment of Civil Penalty in Amount of $50,000,per NRC .Corrective Actions Expected to Be Applied Across All Three Facilities ML15224A7121990-08-16016 August 1990 Discusses Insp Repts 50-269/90-17,50-270/90-17 & 50-287/90-17 on 900520-0616 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 IR 05000269/19900121990-08-0606 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-269/90-12, 50-270/90-12 & 50-287/90-12 IR 05000269/19900161990-08-0606 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-269/90-16, 50-270/90-16 & 50-287/90-16 ML15224A7091990-08-0303 August 1990 Forwards Insp Repts 50-269/90-21,50-270/90-21 & 50-287/90-21 on 900617-0714.No Violations or Deviations Noted ML20055J1301990-07-24024 July 1990 Forwards Partially Withheld Safeguards Insp Repts 50-269/90-22,50-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviations Noted IR 05000269/19900171990-07-18018 July 1990 Forwards Summary of Enforcement Conference on 900712 Re Insp Repts 50-269/90-17,50-270/90-17 & 50-287/90-17 ML15239A0331990-07-0505 July 1990 Forwards Exam Rept 50-269/OL-90-01 Administered on 900606 ML20055C9631990-06-25025 June 1990 Forwards Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08.No Violations or Deviations Noted ML20059M9241990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML15224A6751990-06-12012 June 1990 Forwards Insp Repts 50-269/90-15,50-270/90-15 & 50-287/90-15 on 900521-25.No Violations or Deviations Noted ML16152A9651990-06-0707 June 1990 Expresses Appreciation for Volunteering to Participate in Emergency Response Data Sys.Survey Designed to Provide Hardware,Communications,Data Point & Administrative Info Necessary for Design of Sys Interface Encl.W/O Encl ML15260A1241990-06-0606 June 1990 Confirms Mgt Meeting on 900717 to Discuss Plant Performance & Plant self-assessment of Plant Performance IR 05000269/19900081990-05-24024 May 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-269/90-08, 50-270/90-08 & 50-287/90-08 IR 05000269/19900061990-05-16016 May 1990 Ack Receipt of Util Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-269/90-06, 50-270/90-06 & 50-287/90-06 ML15261A2971990-05-0909 May 1990 Forwards Summary of Mgt Meeting on 900403 Re Security Issues & Status of Corrective Measures on fitness-for-duty & Access Authorization Programs.List of Attendees & Handouts Encl IR 05000269/19890371990-05-0404 May 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations in Insp Repts 50-269/89-37,50-270/89-37 & 50-287/89-37.Metallurgical Rept Should Be Available During Closeout Insp to Clarify Surface Discontinuities ML20034C2111990-04-24024 April 1990 Provides Info Re Interpretation of Bioassay Measurements to Assess Intakes of Radioactive Matl ML15113A8121990-04-18018 April 1990 Advises of Operating & Written Exams Scheduled for Wk of 900625 During Requalification Evaluation Visit.Ref Matl Listed in Encl 1 Requested by 900606 ML15224A6601990-04-16016 April 1990 Forwards Insp Repts 50-269/90-10,50-270/90-10 & 50-287/90-10 on 900312-16.No Violations or Deviations Noted ML20033G7141990-04-0202 April 1990 Forwards Insp Repts 50-269/90-06,50-270/90-06 & 50-287/90-06 on 900212-16 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21) ML16152A9461990-03-19019 March 1990 Forwards NRC Understanding of Current Status of Unimplemented USIs at Plant,Per 891019 Generic Ltr 89-21 ML15224A6431990-03-0202 March 1990 Forwards Insp Repts 50-269/90-03,50-270/90-03 & 50-287/90-03 on 900122-26.No Violations or Deviations Noted IR 05000269/19890291990-02-28028 February 1990 Advises That NRC Has Reviewed Containing Explanation of 900215 Emergency Preparedness Drill, Discussed in Insp Repts 50-269/89-29,50-270/89-29 & 50-287/89-29.Items Will Be Addressed in Future Insp IR 05000269/19890391990-02-23023 February 1990 Forwards Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted ML15260A1071990-02-23023 February 1990 Forwards Transcript of 900131 Meeting at Catawba Plant Re Proposed Civil Penalty for Violations Involving Inoperable Auxiliary Feedwater Pump & Civil Penalty Proposed for Security Violations ML15224A6121990-01-0808 January 1990 Forwards Insp Repts 50-269/89-36,50-270/89-36 & 50-287/89-36 on 891112-1216 & Notice of Violation IR 05000269/19890311989-12-29029 December 1989 Forwards Notice of Violation & Enforcement Conference Summary Re Insp Repts 50-269/89-31,50-270/89-31 & 50-287/89-31.Certain Activities Appeared to Violate NRC Requirements IR 05000369/19890231989-12-21021 December 1989 Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,0000,per Listed Insp Repts, Including 50-413/89-23,50-414/89-23,50-369/89-23 & 50-369/89-23.Encl Withheld (Ref 10CFR2.790(d) & 73.21) ML15224A6051989-12-11011 December 1989 Forwards Insp Repts 50-269/89-34,50-270/89-34 & 50-287/89-34 on 891011-1111.No Violations or Deviations Noted ML15224A6041989-12-0707 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-269/89-31, 50-270/89-31 & 50-287/89-31 ML16152A8801989-12-0606 December 1989 Expresses Appreciation for Util Participation in Regulatory Impact Survey on 891201 ML16131A2761989-11-29029 November 1989 Forwards Safety Evaluation Accepting Proposed Mods to ATWS Mitigation Sys Actuation Circuitry & Requirements for Diverse Scram Sys,Per .Nrc Evaluating Need for Tech Spec Operability & Surveillance Requirements ML19332E9141989-11-28028 November 1989 Advises That 890901 & 1101 Revs 31 & 32,respectively,to Crisis Mgt Plan Consistent W/Planning Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50 ML19332D7811989-11-22022 November 1989 Forwards Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04.No Violations or Deviations Noted ML19332E3751989-11-16016 November 1989 Forwards Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted ML19332C1631989-11-0808 November 1989 Forwards Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22.Violations Identified ML15260A0871989-10-30030 October 1989 Confirms 891108 Enforcement Conference in Region II Ofc to Discuss Recent Problems Re Program to Control Containment Penetration Testing Following Maint &/Or Mod.Specific Areas That NRC Would Like Util to Address Identified in Encl ML19325E4941989-10-26026 October 1989 Forwards Summary of 890829 Enforcement Conference,Per Listed Insp Repts,Re Repetitive & Recurring Security Violations in Areas of Access Control to Protected & Vital Areas & Failure to Implement Measures for Degraded Security Equipment ML19325E1281989-10-24024 October 1989 Forwards Summary of 890829 Mgt Meeting in Region II Ofc Re Util Apparent Failure to Meet Requirement to Perform Licensed Operator Medical Exams Every 2 Yrs.List of Attendees & Handouts Also Encl ML19325C7401989-10-10010 October 1989 Confirms 891005 Telcon Re Participation in NRC Regulatory Impact Survey on 891201.Licensee Feedback Will Be Evaluated to Determine What Changes Should Be Made to NRC Regulatory Approach to Enhancing Safe Operation of Plants ML15264A6311989-09-29029 September 1989 Confirms Verbal Granting of Temporary Waiver of Compliance from Requirements of Tech Spec 3.6.3c to Allow Intermittent Use of Containment Penetration 53 to Charge Core Flood Tank a ML15254A1201989-09-20020 September 1989 Forwards Amend 15 to Indemnity Agreement B-44,reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements, for Signature ML15264A6291989-09-0707 September 1989 Forwards Request for Addl Info Re ISFSI 1990-09-21 Category:OUTGOING CORRESPONDENCE MONTHYEARML15113A7511999-09-23023 September 1999
[Table view]Concludes That All Info Requested by GL 98-01 & Suppl 1 Re Y2K Readiness of Computers at NPPs Provided by Util & GL 98-01 Considered Closed for Ons,Units 1,2 & 3 ML15261A2411999-09-17017 September 1999 Confirms 990916 Telcon Between L Nicholson of Licensee Staff & R Carroll of NRC Re Mgt Meeting to Be Conducted on 991006 in Atlanta,Ga to Discuss Licensee Status of Ongoing Improvement Initiatives at Oconee Nuclear Station ML15261A4181999-09-10010 September 1999 Forwards Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Ten Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15112A7611999-09-0909 September 1999 Forwards Safety Evaluation of Unresolved Safety Issue A-46 Program Implementation,Including Plant Hydro Station & Switchyard ML15261A2711999-08-11011 August 1999 Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML16134A5591999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML15113A7311999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Responses to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Movs, Issued on 960918 ML15261A4151999-07-30030 July 1999 Forwards Insp Repts 50-269/99-04,05-270/99-04 & 50-287/99-04 on 990523-0703.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML15261A2701999-07-14014 July 1999 Confirms Telcon Between Je Burchfield & Re Carroll on 990708 Re Mgt Meeting Scheduled 990730 in Atlanta Ga.Purpose of Meeting to Discuss Status of Open EFW Insp Items & Engineering Initiatives IR 05000269/19990031999-06-17017 June 1999 Forwards Insp Repts 50-269/99-03,50-270/99-03 & 50-287/99-03.Violations Being Treated as Noncited Violations ML15112A5001999-06-16016 June 1999 Forwards SER Re Licensee 980706 Application to NRC for Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating License for Addl 20 Years.Open Items Must Be Resolved Before NRC Can Make Final Determination on Application ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML15261A2631999-06-0202 June 1999 Provides NRC Decision on Licensee 980604 Request for Reconsideration of Violation B of NOV Issued on 980504 Re Timeliness in Reporting Design Basis Events or Conditions at Plant Facility ML15261A2641999-06-0202 June 1999 Informs That Meeting Re Performance of Oconee Nuclear Station Will Be Held on 990621 ML15261A4061999-05-24024 May 1999 Forwards Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Scoping & Screening Portion of License Renewal Activities Were Conducted as Described in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML15113A6811999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Div of Licensing Project Mgt Created.Rl Emch Section Chief for Oconee.Reorganization Chart Encl ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates ML15261A2481999-04-0202 April 1999 Provides Summary of 990324 Meeting with DPC at Oconee Nuclear Station Re Activities of NRC Management Oversight Group & Licensee Update to Oconee Recovery Plan.List of Meeting Attendees,Dpc Presentation Handout & Checklist Encl ML15261A3991999-03-26026 March 1999 Forwards Insp Repts 50-269/99-01,50-270/99-01 & 50-287/99-01 on 990117-0227.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML15113A6061999-03-17017 March 1999 Discusses GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Hrps, for Plant,Units 1, 2 & 3.Determined That Duke Has Provided Info Requested by GL 97-04.Staff Considers GL Closed for Units ML15261A2261999-03-0101 March 1999 Confirms Telephone Conversation on 990201 Re Two Mgt Meetings to Be Conducted on 990324 at Oconee Nuclear Station.Purpose of Meetings Will Be to Discuss NRC Mgt Oversight Group Issues & Oconee Performance Improvement ML15112A3991999-02-16016 February 1999 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves ML15261A3951999-02-12012 February 1999 Forwards Insp Repts 50-269/98-11,50-270/98-11 & 50-287/98-11 on 981129-990116 & Notice of Violation ML20206S5951999-02-0303 February 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Their Entirety ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML15112A3861999-01-15015 January 1999 Requests Clarification for 981119 RAI Re Review of License Renewal Application ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail ML15112A3701999-01-0505 January 1999 Forwards Staff Assessment of Hpis Mu Line Weld Crack & Related B&Wog Response ML15112A3671998-12-29029 December 1998 Forwards RAI for Review of Plant Environ Rept Associated with Util Application for License Renewal Submitted by .Areas Related to Severe Accident Mitigation Alternatives Where Addl Info Needed IR 05000269/19983011998-12-24024 December 1998 Forwards Exam Repts 50-269/98-301,50-270/98-301 & 50-287/98-301 Administered on 981130-1203.All Candidates Passed Examination,Representing 100% Pass Rate.Simulation Facility Rept Included ML15217A1961998-12-0707 December 1998 Ack Receipt of Related to Scoping Process for Relicensing of Oconee Nuclear Station,Units 1,2 & 3 & Clarifies Issue of Concern Re Extent of Relicensing Process ML15112A3451998-12-0404 December 1998 Forwards RAI Re Plant,Units 1,2 & 3 License Renewal Application.Addl Info Requested in Encl Sections of OLRP-1001 ML15112A3411998-12-0303 December 1998 Forwards Request for Addl Info for Review of License Renewal Application for Oconee Nuclear Station,Units 1,2 & 3.Encl Questions from Matls & Chemical Engineering Branch Re OLRP- 1001 Sections 3.4.7,3.4.8,3.4.9,3.5.2,3.5.3,3.5.5 & 3.5.8 ML15112A3441998-12-0303 December 1998 Forwards Request for Addl Info for Review of License Renewal Application for Oconee Nuclear Station Units 1,2 & 3.Request Re OLRP-1001,Section 4.11.Response Requested within 30 Days of Receipt of Ltr ML15112A7031998-11-25025 November 1998 Forwards Request for Addl Info Re Review of Oconee Nuclear Station,Units 1,2 & 3 License Renewal Application,Dtd 980706,specifically,OLRP Sections 1.5.3,2.6,3.2,3.6 & 5.6. Response Requested within 30 Days of Ltr Receipt ML15112A6991998-11-24024 November 1998 Forwards RAI Re Review of Plant Units 1,2 & 3 License Renewal Application.Schedule for Submittal of Responses Requested to Be Provided within 30 Days of Receipt of Ltr ML15112A6931998-11-20020 November 1998 Forwards RAI Re License Renewal Application.Encl Questions from Reactor Sys Branch Re Section 1.5.2 of OLRP-1001 ML15112A6861998-11-20020 November 1998 Forwards RAI for Review of Oconee Nuclear Station,Units 1 & 2 Re License Renewal Application.Encl Questions from Mechanical Enginering Branch Re Sections 3.4.4 & 3.5.5 of OLRP-1001 ML15112A6891998-11-20020 November 1998 Forwards RAI for Review of Oconee Nuclear Station,Units 1 & 2 Re License Renewal Application.Encl Questions from Plant Sys Branch Re Section 2.5.13 of OLRP-1001 ML15112A3141998-11-19019 November 1998 Forwards RAI Re Amend That Would Revise Pressure Temp Limits & Low Temp Overpressure Protection Setpoints in TSs for Plant,Units 1 & 2 ML15112A3111998-11-18018 November 1998 Refers to DPC 980706 Submittal of Application to Renew OLs for Oconee.Forwards Request for Addl Info Re OLRP-1001 Sections 3.7.2,3.7.2-1,4.21 & 4.21-6 & General Questions G-1,G-2 & G-3 ML16134A5541998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bwr/Pwr GFE Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML15112A2981998-11-0909 November 1998 Informs That Version of Submitted Response to RAI Re App D to TR DPC-NE-2005-P,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML15261A2081998-10-27027 October 1998 Confirms 981020 Telcon Re Two Mgt Meetings to Be Conducted on 981208 in Atlanta,Ga.Purpose of Meeting to Discuss NRC Mgt Oversight Group Issues & to Provide Update to Plant Recovery Plan 1999-09-09 |
Inspection Report - Oconee - 1989022 | |
---|---|
Text
~JUL 2 ~18 Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-269/89-22, 50-270/89-22 AND 50-287/89-22 This refers to the NRC inspection conducted by the resident inspectors on June 22 - July 14, 19'8 The inspection included a review of activities authorized for your Oconee facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the repor Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u
Sincerely, ORIGINAL SIGNED BY ALAN R. HERDT Alan R. Herdt, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure:
NRC Inspection Report cc w/encl:
M. S. Tuckman, Station Manager State of South Carolina bcc w/encl:
NRC Resident Inspector H. Pastis, NRR Document Control Desk RII:DRP RjJ;DRP Brrser ck 07//89