IR 05000269/1989017
| ML15224A578 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/30/1989 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8909120090 | |
| Download: ML15224A578 (2) | |
Text
ALLt KA LiL)
JA~A.'l'IU-1 I 7'
AA (
I I UN
~1I t *
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
WS ESSION NBR:8909120090 DOC.DATE: 89/08/30 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power C Oconee Nuclear Station, Unit 2, Duke Power C Oconee Nuclear Station, Unit 3, Duke Power C AUTH.NAME AUTHOR AFFILIATION HERDT, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER, Duke Power C SUBJECT: Ack receipt of 890816 Itr informing NRC of steps taken to correct violations noted in IR 50-269,50-270 & 50-287/89-1 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL C'
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD
WIENS,L
INTERNAL: ACRS
AEOD/DEIIB
AEOD/TPAD
DEDRO
LOIS,ERASMIA
NRR SHANKMAN,S
NRR/DEST DIR
NRR/DLPQ/PEB
NRR/DOEA DIR 11
NRR/DREP/EPB 10
NRR/DREP/RPB 10
NRR/PMAS/ILRB12
1 NUDOCS-ABSTRACT
0.1-IIEBE4AN
1 OGC/HDS2
A
RES MORISSEAU,D
RGN2 FILE
1 EXTERNAL:
LPDR
NRC PDR
I I
N=I'E 'IO ALL "RIDS" RECIPIflS:
PLEASE P US 'Im RUCE ST!
CDNAC THE mDMNT CDI1ROL DESK, ROCM P1-37 (EXT. 20079) 'T0 ELIDM YOUR NAM FO DTRIBUTICE LISTS FOR DOCMENTS Y00 DON'T NEEDI TAL NUMBER OF COPIES REQUIRED: LTTR
ENCL
.2.6-
Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
REPORT NOS. 50-269/89-17, 50-270/89-17 AND 50-287/89-17 Thank you for your response of August 16, 1989, to our Notice of Violation issued on July 17, 1989, concerning activities conducted at your Oconee facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
Sincerely, Alan R. Herdt, Chief Reactor Projects Branch 3 Division of Reactor Projects cc:
M. S. Tuckman, Station Manager State of South Carolina bcc: NRC Resident Inspector L. Wiens, NRR Document Control Desk R IR I I BBMS BMymlock 8/F0/89 84- /89 R
P~CC}
PD:-: