IR 05000269/1989008
| ML16127A337 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/10/1989 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8905250139 | |
| Download: ML16127A337 (2) | |
Text
ACCELERATED DISIBUTION DEMONSTRATION SYSTE REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8905250139 DOC.DATE: 89/05/10 NOTARIZED: NO DOCKET #
CIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power C Oconee Nuclear Station, Unit 2, Duke Power C Oconee Nuclear Station, Unit 3, Duke Power C AUTH.NAME AUTHOR AFFILIATION HERDT, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER, Duke Power C SUBJECT: Ack receipt of util 890504 ltr informing NRC of steps taken to correct violations noted in IRs 50-269,270,287/89-0 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR _
ENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response S
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD2-3 PD
HOOD,D
D INTERNAL: ACRS
AEOD/DEIIB
AEOD/TPAD
DEDRO
NRR SHANKMAN,S
NRR/DEST DIR
NRR/DLPQ/PQEB
S NRR/DOEA DIR 11
NRR/DREP/EPB 10
NRR/DREP/RPB 10
NRR/PMAS/ILRB12
NUDOCS-ABSTRACT
L OE L
,ERMANJ 1 OGC/HDS2
FILE RGN2 FILE
1 EXTERNAL: LPDR
NRC PDR
R I
D S
A D
D NOTE TO ALL "RIDS" RECIPIENIS:
S PLEASE HELP US TO REUC
!
ODNTACT THE DOUMENT ODNTL DESK, ROM Pl-37 (EX ) TO ELICDME YOUR NWME Fa DISTUTIO LISTS FOR DOCUMENIS YOU DO'T NEE!
0 N-0 TOTAL NUMBER OF COPIES REQUIRED: LTTR
ENCL --2+
Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
REPORT NOS. 50-269/89-08, 50-270/89-08 AND 50-287/89-08 Thank you for your response of May 4, 1989, to our Notice of Violation issued on April 4, 1989, concerning activities conducted at your Oconee facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
Sincerely, ORIGINAL SIGNED By ALAN R. HERDT Alan R. Herdt, Chief Reactor Projects Branch 3 Division of Reactor Projects cc:
M. S. Tuckman, Station Manager State of South Carolina bcc: NRC Resident Inspector L. Wi.ens, NRR Document Control Desk RII RII B Boner 5/9/89 5/9/89 8905250139 890510 DDR ADOCK 0500 29