ML20040F090

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Repts 50-269/82-02,50-270/82-02 & 50-287/82-02 on 820111-14.No Noncompliance Noted
ML20040F090
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/01/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20040F091 List:
References
NUDOCS 8202080304
Download: ML20040F090 (2)


See also: IR 05000269/1982002

Text

brnt

SAFEGUARDS INFORMATION

'

'

'

.

FEB

1 1982

, , , ,

e

e'

/

Duke Power Company

[6

5503 E50

g

ATTN:

W. O. Parker, Jr.

--

a

Vice President, Steam Production

_!

nB

51982a- r

-

' ] "5Q M g nu 10

P. O. Box 2178

Charlotte, NC 28242

rce

'

,

'b

s/f

Gentlemen:

g

,

Subject: Report Nos. 50-269/82-02, 50-270/82-02 and 50-287/82-02

This refers to the routine :afeguards inspection conducted by Mr. W. J. Tobin

of this office on January 11-14, 1982, authorized by NRC License Nos. DPR-38,

DPR-47 and DPR-55 at the Oconee Nuclear Station and to the discussions of our

findings held with Mr. J. E. Smith, Station Manager, at the conclusion of the

inspection.

Areas examined during this inspection included your physical security program

as implemented under the provisions of Title 10, Code of Federal Regulations,

Part 73, " Physical Protection of Plants and Materials" and the specific

requirements of your approved Security Plan.

Within these areas, the

inspection

consisted

of

selective

examinations

of

proceoures

and

representative records, interviews with personnel, performance tests, and

observations by the inspector.

Within the scope of this inspection, no violations er deviations were

disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by

Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not. be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

8202080304 820201

PDR ADOCK 05000269

G

PDR

paul J. Kellogg, Chief

n;%05URE CONTAINSN

Reactor Project Branch 2,

5lJEOUARDS INFOR!ATION.

Din sion of Resident and

pk

U?cN EF?ACATION THIS

Reactor Project Inspection

' NE~1DE00VTROLLED.

$I l

I @

8

Enclosure: See Page 2

,

W E ING: SAFECUATOS Igporg.ATION

SECT 10N 147 ATt'iIC ENIRGY ACT 1954.

V10LAn0NS OF IHE Paa ECf10N

__

'%2#d!E* cec 75!$Smrto S- SAFEGUARDS INFORMATIdN

s

SAFEGUARDS INFORMATION

-

.

-

Duke Power Company

2

.

,

FEB

11982

Enclosure:

Inspection Report Nos. 50-269/82-02,

50-270/82-02 and 50-287/82-02

(Safeguards Information)

cc w/ encl:

J. E. Smith, Station Manager

bcc w/ enc 1:

Document Management Branch

bec w/ Inspection Summary:

NRC Resident Inspector

State of South Carolina

G m co p y g yy73

SAFLGuj.ggg INE0%!ATION

UPO*i SEFARATION THIS

-sa 15 DECONTROLic,

i

g\\ '

o

RII h

RII

R

RII

RII

fr c(?

RGoode:my

WTobin

D! -

re

AGibson

AIgnato is

01/ 3/82

01/g/82

01/J)/82

01p/82

01/4 782

3

"li,\\h

01/

82

7f

SAFEGUARDS INFORMATION