| Q | CCA | Title |
---|
05000261/FIN-2011004-01 | 2011Q3 | P.4 | Water Intrusion into Safety-Related Buildings due to Inadequate Design of Site Storm Water Runoff Drainage System |
05000261/FIN-2011004-02 | 2011Q3 | P.2 | Failure to Take Prompt Corrective Actions to Establish Guidance to Monitor and Operate Service Water Strainers Following LOOP |
05000261/FIN-2011005-01 | 2011Q4 | P.4 | Failure to Perform Adequate Design Reviews Related to Site Topography Changes Result in Water Intrusion into Safety-Related Buildings |
05000261/FIN-2012002-01 | 2012Q1 | H.14 | Failure to Implement Technical Specification Action Requirements Regarding B Battery Inoperability |
05000261/FIN-2012002-02 | 2012Q1 | | Inadequate Design Change Resulted in Interference and Inoperability of Containment Water Level Indication |
05000261/FIN-2012002-03 | 2012Q1 | | LOW Temperature Overpressure System Rendered Inoperable for Operational Convenience |