IR 05000261/1993019

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/93-19
ML14178A415
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/17/1993
From: Verrelli D
NRC/IE, NRC/RGN-II
To: Dietz C
Carolina Power & Light Co
References
NUDOCS 9312140186
Download: ML14178A415 (4)


Text

FORD I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9312140186 DOC.DATE: 93/11/17 NOTARIZED: NO DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION VERRELLI Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION DIETZ, Carolina Power & Light C SUBJECT: Ack receipt of 931103 ltr informing NRC of steps taken to R

correct violations noted in insp rept 50-261/93-1 DISTRIBUTION CODE: IEO1D COPIES RECEIVED:LTR / ENCL 0 SIZE:&.

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response D

NOTES:

S RECIPIENT COPIES RECIPIENT COPIES F

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD

MOZAFARI,B

0 INTERNAL: AEOD/DEIB

AEOD/DSP/ROAB

AEOD/DSP/TPAB

AEOD/TTC

1R DEDRO

NRR/DORS/OEAB

NRR/DRCH/HHFB

NRR/DRIL/RPEB

.

NRR/DRSS/PEPB

NRR/PMAS/ILPB1

NRR/PMAS/ILPB2

NUDOCS-ABSTRACT

OE D:I:R::z1 OGC/HDS2

~-RE~~iLE

1RES/HFB1 T

N RGN2 FILE

1 XTERNAL:

EG&G/BRYCE, J. NRC PDR

NSIC

0 C

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DES ROOM PI-37 (EXT. 504-2065) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

ENCL

Docket No.:

50-261 License No.:

DPR-23 Carolina Power and Light Company ATTN: Mr. C. R. Dietz Vice President H. B. Robinson Steam Electric Plant Unit 2 P. 0. Box 790 Hartsville, SC 29550-0790 Gentlemen:

SUBJECT:

REPORT NO. 50-261/93-19 Thank you for your response of November 3, 1993, to our Notice of Violation issued on October 5, 1993, concerning activities conducted at your H. Robinson facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, DAVI) M V,.LLI David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:

M. P. Pearson Plant Manager H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550-0790 H. W. Habermeyer, J Vice President Nuclear Services Department Carolina Power & Light Company P. 0. Box 1551

-

Mail OHS7 Raleigh, NC 27602 (cc cont'd - See page 2)

9312140186 931117 PDR ADOCK 05000261

PDR

Carolina Power and Light Company

\\ \\

19\\0 (cc cont'd)

D. B. Waters, Manager Regulatory Compliance H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment, Commerce & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 McCuen Morrell, Chairman Darlington County Board of Supervisor County Courthouse Darlington, SC 29535 H. Ray Starling Vice President -

Legal Department Carolina Power and Light C P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff -

NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Public Service Commission State of South Carolina P. 0. Box 11649 Columbia, SC 29211 bcc:

(See page 3

Carolina Power and Light Company

1O 1 1993 bcc: H. Christensen, RH B. Mozafari, NRR Document Control Desk NRC Resident Inspector U. S. Nuclear Regulatory Commission Route 5, Box 413 Hartsville, SC 29550 RII:DRP RII:DRP JStarefs:tj HCh stensen 11/17/93 11/(1/93