IR 05000261/1993014

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-261/93-14 on 930614-16 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: LER Followup & Testing & Maint
ML20045H666
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/12/1993
From: Masnyk O, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20045H659 List:
References
50-261-93-14, NUDOCS 9307210105
Download: ML20045H666 (1)


Text

_

SAFEGU ARQ.lTpD STATESINFORMATION ot *nec % +

g NUCLEAR REGULATORY COMMISSION p

c

'y e

REGION 11

$

101 MARIETTA STREET, N.W., SUITE 2900

%

j ATLANTA, GEORGIA 30323 0199

\\...../

Report No.:

50-261/93-14 Licensee:

Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602 Docket No.:

50-261 License No.: DPR-23 Facility Name:

H. B. Robinson Inspection Conducted: June 1 -16, 1993 b '78 Inspector:

[Mle N m L

Orysia

.Fpsnyk, Safe 40ardsSpecialist Date Signed Approved by: h h J 7 2/U David R. McGuire, Chief Date Signed Safeguards Section Nuclear Materials Safety and Safeguards Branch

'

Division of Reactor Safety and Safeguards SUMMARY Scope:

This routine, unannounced inspection was conducted in the areas of Licensee Event Report Follow-up and Testing and Maintenance.

Results:

In the areas inspected, one violation was confirmed. An accessed vital area door was left unattended by a security force member.

i i

9307210105 930714 PDR ADOCK 05000261 G

PDR

-. n.-,-,

'

70~_% 3=1. e ne'mwet, t* oxpw4 la 6tLWWDC4 i

  • %.e # s 3