ML18024B091
| ML18024B091 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/04/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18024B092 | List: |
| References | |
| NUDOCS 7911150125 | |
| Download: ML18024B091 (2) | |
See also: IR 05000259/1979029
Text
~$ REOIj
~C
In Reply Refer To:
RII PKV
50"259/79-29
50-260/79"29
50-296/79-29
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
10'I MARIETTAST., N.WSUITE 3100
ATLANTA,GEORGIA 30303
OCT 04 t979
Valley Authority
Attn:
H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
37401
Gentlemen:
This refers to the inspection
conducted
by P. K. Van Doom of this office on
September
11-14,
1979 of activities authorized by NRC License Nos.
DPR-52 and DPR-68 for the Browns Ferry facilities, and to the discussion of our
findings held with J. L. Harness at the conclusion of the inspection.
Areas examined during the inspection
and our findings are discussed in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in .a
separate
part of the document. If we do noE, hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
Valley Authority
"2-
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. murphy, Chi
Reactor Construction
and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50"259/79-29,
50-260/79-29
and 50-296/79-29
cc w/enclosures:
H. L. Abercrombie
Plant Superintendent
Post Office Box 2000
Decatur,
35602
r
.
D. E. McCloud, Project Engineer
400 Chestnut Street
Tower II
Chattanooga,
37401