Forwards IE Insp Repts 50-259/79-08,50-260/79-08 & 50-296/79-08 on 790205-0302.No Noncompliance Noted
ML18024A851
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/27/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18024A852 List:
References
NUDOCS 7906180710
Download: ML18024A851 (4)


Text

~f1 IIE0II~

~4 UNITEDSTATES NUCLEAR REGULATORY COMMISSION

REGION II

10'I MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303 MoK ~

'< 1879

>o-A~

~ho In Reply Refer To:

RII:RFS 50-259/79-8 50-260/79-8 50-296/79-8 Tennessee Valley Authority ATTN:

H.

G. Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

This refers to the inspection conducted by R. F. Sullivan of this office on February 5 - March 2, 1979, of activities authorized by NRC License Nos.

DPR-33, DPR-52, and DPR-68 for the Browns Ferry, Units 1, 2, and 3 facility, and to the discussion of our findings held with J.

G. Dewease at the con-clusion of the inspection.

P

I:,

S Areas examined during the inspection and our findings are discussed in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

'F9061 8 p 7/y

'

Tennessee Valley Authority

"2-MAR r. 7 ]97g Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, g.C; Richa

. lewis, Acting Chief Reactor Operations and Nuclear Support Branch Enclosure:

Inspection Report 'Nos. 50-259/79-8, 50-260/79-8, and 50-296/79-8 cc w/encl:

J.

G. Dewease Plant Superintendent (

P. 0.

Box 2000 Decatur, AL 35602 D. E. McCloud, Project Engineer 400 Chestnut Street Tower II Chattanooga, TN '37401 I ~