IR 05000255/1990037

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-255/90-37 on 901127-30 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Including Protected & Vital Area Barriers,Protected & Vital Area Access Controls,Mgt Effectiveness & Security
ML20024F885
Person / Time
Site: Palisades 
Issue date: 12/17/1990
From: Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20024F880 List:
References
50-255-90-37, NUDOCS 9012270094
Download: ML20024F885 (2)


Text

{{#Wiki_filter:- _ - _ - _ _ _ _ _ _ _ _. - - ___ _ . l U. S. NUCLEAR REGULATORY COMMISSION ' REGION 111 Report No. 50-255/90037(DPSS) Docket No. 50-255 License No. DPR-20 Licensee: Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 facility Name: Palisedes Nuclear Plant Inspection At: Palisades Site, Covert, Michigan Inspection Conducted: November 27-30, 1990 Inspector: Sh M 'd. R. Kniceley ) Inspector Date Signed Physical Se:urity Approved By: / . lames R. Creed, Chief Datei~ Signed ~ Safeguards Section Inspection Summary Inspection on November 27-30, 1990 (Report No. 50-255/90037(DRSS)) Areas Inspected: Routine, unannounced physical security inspection involving: Protected and Vital Area Barriers; Protected and Vital Area Access Controls; Management Effectiveness; Security Plan and Procedure Review; Security Program Audits; Compensatory Measures; Assessment Aids; and Personnel Training and Qualification - General Requirements.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below: Physical Security Program for Power Reactors - Access Control - Personnel, Packages, and Vehicles: Some access control search equipment failed to Tunction as required.

The licensee took initial action to correct the violation and a procedure change will be made to prevent recurrence.

We have concluded that the licensee's performance generally meets regulatory requirements and the security program is being well implemented and managed.

Security's involvement and support for the Steam Generator Replacement Project (SGRP) is evident as demonstrated through the use of dedicated supervision and redundant compensatory measures in support of plant protection.

Attachment Containe o&2270094go;93, SW MMW ADOCK 05000255 Upon Su; wn This PDR Page IS Deco. moll #' - _ _ _ _ - - _ _ - _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _

O e e a 0, ( W@ Qk /& D, 't.,

  • 9 V t

~P, *'-{ e Q.

o "I

  1. g "e, re

'dj .o 's %n o, =Q k

o < -

G

  1. G G^,.

$

  • +

'o "c.

  • c

& < i

Management's involvement and support for the security program continues to l be a program strength.

l l (DETAILS-SA){(RDSINFORMATION) l , Attachment Contains SL7:":' :.2DS TY.

1"'.13 3N Upon Sepc.rs.cion Thic

1 age It., Decentrolled

________-____ }}