IR 05000250/1989002
| ML18008A029 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/24/1989 |
| From: | Ernst M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347A989 | List: |
| References | |
| EA-89-047, EA-89-47, NUDOCS 8903090095 | |
| Download: ML18008A029 (6) | |
Text
AC CELE RATED DISIR1BUTlON DEMONSTRATION SYS7gg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)
Li ACCESSiON NBR:8903090095 DOC.DATE: 89/02/24 NOTARIZED:
NO DOCKET FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 05000250 5(~-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION RNST,M.L.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power a Light Co.
SUBJECT:
Forwards Insp Repts 50-250/88-02 S 50-251/89-02 on 890117-20
DISTRIBUTION CODE:
IEOlD COPIES RECEIVED:LTR i
ENCL (
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT ID CODE/NAME PD2-2 PD RGN2 ERNAL: LPDR NSIC INTERNAL: AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 FILE
COPIES LTTR ENCL
1
1
1
1
1
1
1
1
1
1 RECIPIENT ID CODE/NAME EDISONiG AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB
NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12 OE LIEBERMAN,J NRC PDR COPIES LTTR ENCL
1
1
1
1
1
2
1
1
1 NCtXE 'IO ALL 'RIBS" RECIPZENIS:
PIZASE HELP US LO REIXKZ %A8TE!
CXNIRCI'IHE IxjCUMERZ CXWZIKlLDESK, KXM-Pl-37 (EXT. 20079)
KO ELXKBQXS ACR NAMB PKK DIPHGSPZICN LIBTS FOR DOCUMERIS YOU DONiT NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET. N.W.
ATLANTA,GEORGIA 30323 Docket Nos. 50-250, 50-251 License Nos.
DPR-31, DPR-41 EA 89-47 FEB 24;:-.-::.-;
Florida Power and Light Company ATTN:
Mr. W. F.
Conway Senior Vice President - Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-250/89-02 AND 50-251/89-02)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by J.
L.
Kreh on January 17-20, 1989.
The inspection included a review of activities authorized for your Turkey Point facility.
At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
The inspection findings indicate that your response to an incident on January 7,
1989 appeared to violate NRC requirements.
The violation involved failure to declare an Alert and to appropriately implement the Radiological Emergency Plan following a Reactor Coolant System leak which clearly met the criteria for an emergency declaration.
Such a condition, no matter how briefly it existed, must be promptly declared at the appropriate emergency class and r'eported in a timely manner to local, State, and Federal authorities so that they are informed of unusual or significant events at the facility.
Although we considered classification of this violation at Severity Level III, it has been classified at Severity Level IV based on its low safety significance, in that the affected unit was at cold shutdown and effective mitigating actions were taken to quickly stop the leak.
However, we emphasize that any similar violation in the future may result in escalated enforcement action.
The violation is further described in the enclosed Notice of Violation; also delineated therein are references to pertinent requirements and elements to be addressed in your response.
In accordance with Section 2.790 of the NRC's
"Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
8903090095 990224 PDR ADOCK 05000250
PNU
Flori da Power and Light Company
'l%9 Should you have any questions concerning thi s 1 etter, please contact us
~
Sincerely, Encl osures:
1.
NRC Inspection Report cc w/encl s:
J
~
S ~
Odom, Vice Pres ident Turkey Point Nuclear Plant J.
E. Cross, Plant Nanager Turkey Point Nucl ear Plant L ~
W. Bladow, Plant gA Superintendent J
~ Arias, J r., Regulatory and Compliance Supervisor State of Fl or i da Mal colm L. Ernst Acting Regional Administrator bcc w/encl s:
G ~
E. Edison, Project Nanager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk W ~
D ~ Travers, NRR J.
C. Heard, Jr.,
FENA RIV tp~v-m ~
<<y~ ~ /S<
J reh WRank i n TDecker DCol 1 i ns e
k J tohr Jen ns 2/( ~ /89 2/le/89 2//P/89 2//f89 2//Q/89 2 Q/89 2/g$ /89