Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-18 & 50-251/89-18
ML17347B190
Person / Time
Site: Turkey Point  
Issue date: 07/14/1989
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8907240488
Download: ML17347B190 (2)


Text

AC CK1E RATED DISTRIBU'2 ON DE MONSTRATlON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)

ACCiESQION NBR 8907240488 DOC.DATE: 89/07/14 NOTARIZED: NO DOCKET

~

~

~

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION SINKULE,M.V.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION WOODY,C.O.

Florida Power

& Light Co.

SUBJECT:

Ack receipt of 890626 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-250/89-18.

DISTRIBUTION CODE:

ZE01D COPIES RECEIVED:LTR J ENCL 0 SIZE:

I TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD AEOD/TPAD NRR SHANKMANI S NRR/DLPQ/PEB NRR/DREP/EPB

NRR/PMAS/ILRB12 O~ZE RMAN,J e

EG FI

RGN2 FILE

EXTERNAL: LPDR NSIC COPIES LTTR ENCL

~ ]

1

1

1

RECIPIENT ID CODE/NAME EDISONiG AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB

NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUiD NRC PDR COPIES LTTR ENCL

1

1

2

1

1

=-D

MZE IO ALL RIDS" RECZPZERIS'ZZ'ASE HELP US K) REDUCE HASTE!

CMIRCZ 'IHE DOCXlMEÃV CCÃISOL DESK, RXN Pl-37 (EXT. 20079)

TO ELOKMGR ACR MME HKH DISTRIHUTICN LISTS PGR DOCUMENI'8 RXJ DC@'T NEED!

D D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

JUL 1 4 1989 G

Florida Power and Light Company ATTN:

Mr. C. 0.

Woody, Acting Senior Vice President

- Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-250/89-18 AND 50-251/89-18 Thank you for your response of June 26, 1989, to our Notice of Violation issued on May 25, 1989, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, Original signed by cc:

K. N. Harris, Vice President Turkey Point Nuclear Plant J.

E. Cross, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant gA Superintendent E. Lyons, Acting Regulatory and Compliance Supervisor State of Florida bcc:

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector Document Control Desk Marvin V. Sinkule, Chief Reactor Projects Branch

Division of Reactor Projects 8907a40488 8907i4 PDR ADOCK 05000250 Q

PNU R

en 0 / 8/89 RI I:DRP RCr enjak 07//4/89

~>-~ /