+**y0 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION
101 MARIETTAST., N.W.
ATLANTA,GEORGIA 30323 Report Nos.:
50-250/89-05'nd 50-251/89-05 Licensee:
Florida Power and Light Company 9250 West Flagler Street Miami, FL 33102 Docket Nos.:
50-250 and 50-251 License Nos.:
DPR-31 and DPR-41 Facility Name:
Turkey Point 3 and
Inspection Co c:
Ja ary 30 - February 3, 1989
/
Inspector
.
W Newsome Approved by:" ','~X!~
J. J.
Blake, Chief te ials and Processes Section ngineering Branch Division of Reactor Safety Date igned
/~ s9 Date Signed SUMMARY Scope This routine, announced inspection, was conducted on site in the areas of replacement and repair of the Reactor Vessel Bottom Mounted Instrumentation conduits at the Seal Tables and review of the Nondestructive Examination (NDE)
records for the Ultrasonic indications revealed during the inservice inspection examinations conducted on the Unit 4, Steam Generator 8, circumferential weld.
Results In the areas inspected, violations or deviations were not identified.
The licensee was very receptive to any suggestions made by the NRC during this inspection.
There appeared to be good management involvement during the repair and replacement activities of the conduits at the seal table and also during the activities for resolution of indications in the steam generator weld in Unit 4.
All other areas appeared to be adequately addressed.