IR 05000250/1989024
| ML17347B314 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/31/1989 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8909120053 | |
| Download: ML17347B314 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
.ESSION NBR:8909120053 DOC.DATE: 89/08/31 NOTARIZED:
NO DOCKET jz rACIL:50-250 Turkey Point Plant, Unit. 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION SINKULE,M.V.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION WOODY,C.O.
Florida Power
& Light Co.
SUBJECT:
Ack receipt of 890814 ltr informing NRC of steps taken to correct vz.olations noted in IRs 50-250/89-24 6 50-251/89-24.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD AEOD/TPAD LOIS, ERASMIA NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB
NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D EXTERNAL: LPDR NSIC COPIES LTTR ENCL
RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB
NRR/PMAS/ILRB1 2 OE LIE BERMAN,J RGN2 FILE
NRC PDR COPIES LTTR ENCL NOXK 'ZO ALL 'RIES" RECIPIERIS:
PIZASE HELP US IO REDUX %58TH!
CCÃ5KT 'IHE DOCGMEÃZ CXWQQL DESKi RXH Pl-37 (EXT. 20079) m ELDNZMGR ACR MNB PRK DZPI%GSUPZCN LZBTB HXR IXCQKNXS KU DCN'T NEZDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
r(
AUG
I
'i9S"'lorida Power and Light Company ATTN:
Mr. C. 0.
Woody, Acting Senior Vice President
- Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-250/89-24 AND 50-251/89-24 Thank you for your response of August 14, 1989, to our Notice of Violation on June 28, 1989, concerning activities conducted at your Turkey Point facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective'actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Original signed by Marvin V. Sinkule, Chief Reactor Projects Branch
Division of Reactor Projects (7( )
~
(l)
oj>.
~l~
%to (Qs~,
cc:
K. N. Harris, Vice President Turkey Point Nuclear Plant J.
E. Cross, Plant Manager Turkey Point Nuclear Plant L.
W. Bladow, Plant gA Superintendent E. Lyons, Acting Regulatory and Compliance Supervisor State of Florida bcc:
G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector NRC Section Chief NRC Project Engineer Document Control Room RI I:DRP 5Q>] rh SVias 08/+89 RII:
P, kCrlenjak 08/~89