ACCEIZRATED DESI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

-ESSION NBR:8712280025 DOC.DATE: 87/12/16 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HERDT,A.R.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION WOODY,C.O.

Florida Power

& Light Co.

SUBJECT: Ack receipt of 871112

13 ltrs informing NRC of steps taken to correct violations noted in Insp Repts 50-250/87-41.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR

)

ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of VioIation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD NRR MORISSEAU,D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OGC/HDS2 RES DEPY GI AL: LPDR NSIC COPIES LTTR ENCL

-

1

1

1

2

1

1

1

1

1

RECIPIENT ID CODE/NAME McDONALD,D DEDRO NRR/DLPQ/PEB NRR/DREP/EPB NRR/DRIS DIR BERMAN,J RGN2 FILE

NRC PDR COPIES LTTR ENCL

2

1

1

1

1

1

1

1

1 A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL ~g

oaG Florida Power and Light Company ATTN:

Mr. C. 0.

Woody Group Vice President Nuclear Energy Department P. 0.

Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

REPORT NOS. 50-250/87-41 AND 50-251/87-41 Thank you for your responses of November

and 13, 1987, to our Notice of Violation issued on October 13, 1987, concerning activities conducted at your Turkey Point facility.

We have evaluated your responses and found that they meet the requirements of 10 CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, RIGl>AL IGgcg, Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety cc:

J.

S.

Odom, Vice President Turkey Point Nuclear Plant C. J. Baker, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant gA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor bcc:

NRC Resident Inspector DRS Technical Assistant Document Control Desk State Florida RI Ir urnett:tm 12//4 /87 RII g. CP FJape 12//I//87 RII BWilson 12/tg /87 87i2280025 87i2ib PDR ADOCK 05000250 DCD