Text
~<CO>
~s
'Ip0~c O
Vr+
/p ~**+~
UNITED STATES CLEAR REGULATORY COMMISSIOI
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report Nos.
50-250/81-12 and 50-351/81-12 Licensee:
Florida Power and Light Company 9250 West Flagler Street Miami, FL 33101 Facility Name:
Turkey Point 3 and
0 Docket Nos.
50-250 and 50-251 License Nos.
DPR-31 and DPR-41 Inspection at Turkey Point site near Homestead, Florida Inspectors:
.
R.
Wray
.c=.-'-
T.
R. Colli s Approved by:
C.
M.
H e
cting S ction Chief, TI Division of Engineeri g and Technical Inspection
</zz w Date Date Branch Date SUMMARY Inspection on May 18-22, 1981 Areas Inspected This routine, unannouced inspection involved 64 inspector-hours onsite in the areas of Health Physics Appraisal follow-up, radwaste shipping and steam generator replacement project preparations.
Results Of the three areas inspected, no violations were identified.
One apparent deviation was found regarding the replacement of containment purge exhaust filters.
f gf090gag>>
05000280, PDR gD0Cg~ 81081', ji F'DR,'
~ 4
DETAILS Persons Contacted Licensee Employees J.
K. Hayes, Acting Site Manager
- D. W. Haase, Acting Plant Manager - Nuclear
- J. A. Labarrague,,Acting Technical Department Superintendent
- J.
E. Moore, Operations Superintendent
- J.
P.
Lowman, Acting Maintenance Superintendent
- J. L. Danek, Corporate Health Physicist
- P.
W. Hughes, Health Physics Supervisor
- T. Essinger, Assistant Manager guality Assurance
- D. W. Jones, equality Control Supervisor
- S.
M. Feith, guality Assurance Operations Supervisor
- T. S.
Peck, Health Physics Administrative Supervisor J.
R. Bates, Health Physics 'Operations Supervisor NRC Resident Inspector A. Ignatonis, Senior Resident Inspector W.
C. Marsh, Resident Inspector
- Attended exit interview Exit Interview The inspection scope and findings were summarized on May 22, 1981 with those persons indicated in paragraph 1 above.
The inspectors discussed the status of the 'Inspector Follow-up Items, Significant Weaknesses and Vi'olations from the Health Physics Appraisal conducted May 5-16, 1980 and other open items and enforcement matters from previous inspections.
Two open items concerning replacement of the containment purge exhaust filters and the facility ventilation system balance evaluation were discussed at length.
The inspectors stated that although the response to the Health Physics Appraisal indicated that action had been completed or at least initiated on these matters, it appeared sufficient measures to correct these weaknesses had not been promptly taken.
The Acting Plant Manager-Nuclear stated that the containment purge exhaust filters will be replaced immediately, priority will be re'established for the ventilation balance evaluation and the necessary effort will be expended to adequately closed out the remaining open items.
On May 28, 1981, the licensee was informed that failure to replace the containment purge exhaust filters as agreed to in response to the Health Physics Appraisal would be considered a deviation from a commitment to the NR ~ 0
Licensee Action on Previous Inspection Findings I
(Closed) Infraction (77-05-01)
Overexposure of a worker on January 14, 1977.
The licensee has modified his personnel dosimetry program during steam generator work to require the use of two self-reading pocket dosimeters on the jumper's head and the higher indicated exposure for records.
This has effectively eliminated the instances of defective pocket dosimeter readings controlling stay times in the channel heads.
(Closed) Infraction (78-21-02) Preparation of shipments of radio-active materials not in accordance with container requirements.
An inspector reviewed the modifications to the radwaste shipping procedure taken to prevent recurrence of failing to meet container Certificate of Compliance requirements when shipping radioactive materials.
The procedure requires inspection of.these required-items by the guality Control section prior to shipment.
(Closed)'nfraction (79-27-01) Failure to follow operating procedures.
The licensee retrained auxiliary operators to ensure that proper procedures for valve or system alignments are'ollowed.
In addition, a member of the operations department now supervises the auxiliary operators on a full-time basis to ensure that valve and system alignments are proper.
(Closed) Infraction (79-27-03) Burial of licensed quantities of radioactive material.
The licensee has removed the contaminated soil from the ground and placed it drums for shipment to a radio-active material burial site.
In addition, the licensee surveyed, identified and rerouted the affected yard drains.
A sampling pro-gram was established to ensure effluent accountability.
(Closed) Infraction (79-40-01). Exceeded quarterly whole body radia-tion.exposure limit.
The licensee modified its procedure controlling steam generator work to require two health physics technicians at the steam generator while work is conducted on the platform.
This action was taken to ensure that constant visual health physics coverage will be maintained to control worker entries into steam generator channel heads.
An inspector reviewed and verified the operability of the revised program during the health physics appraisal (report no. 50-250/80-17; 50-251/80-15).
(Closed) Infraction (79-40-02) Failure to have a procedure.
The licensee established and is maintaining a written procedure for marking defective steam generator tubes for subsequent plugging.
An inspector reviewed the administrative procedur ~ f
(Closed) Infraction (79-40-03) Failure to follow procedure.
The licensee has modified its steam generator procedure to require two health physics technicians at each steam generator to ensure Radia-tion Work Permit (RWP) compliance by plant workers and to take appropriate air samples as necessary.
This action was taken to ensure that workers do not enter the steam generator channel head without health physics knowledge.
An inspector observed health physics coverage of steam generator work during the health physics appraisal (report no. 50-250/80-17; 50-251/80-15).
(Open) Unresolved Item (80-17-10)
Records of Grade D quality air for supplied air systems.
The inspector reviewed results of corporate breathing air quality tests indicating that the respirable air used at the facility meets the requirements for Grade D air.
However,
. the site gA department or health physics department has not reviewed the corporate procedure to ensure that the method employed is consistent with the recommendations of Regulatory Guide 8. 15 and NUREG 0041.
This item remains unresolved pending further licensee action.
(Open)
Unresolved Item (80-17-12) Air certification for SCBA's.
The inspector reviewed documentation from breathing air suppliers that the quality of breathing air supplied for licensee Self Con-tained Breathing Apparatus (SCBA) meet the requirements for Grade D
air.
However, the breathing air suppliers were not included in the site gC Approved Vendor List, nor had the licensee audited the vendor's procedures to'ensure that the methods employed for testing the quality of respirable air are consistent with the recommenda-tions of Regulatory Guide 8.15 and NUREG 0041.
This item remains unresolved pending further licensee action.
(Closed) Infraction (80-17-18) Failure to post a radioactive materials area.
An inspector examined the drawer in the chemistry laboratory containing reactor coolant sludge samples and observed that it was posted as required.
(Closed) Infraction (80-17-22} Failure to survey to insure compliance with 10 CFR 20.201(b).
The licensee has removed the contaminated soil from the ground outside the radiation controlled area (but within the protected area).
Its ultimate disposal is being determined by burial site allotments.
Also the licensee has established procedures to survey these areas to insure compliance with uncontrolled release of radioactive materials.
An inspector reviewed this program and stated that it appeared to be adequat ~ W
-
(Closed) Infraction (80-17-23) Failure t'o control radiation levels in an unrestricted area in accordance with 10 CFR 20. 105.b.l.
As stated in RII Report Nos.
50-250/80-17 and 50-251/80-15, immediate action to correct the problem had been taken.
During this inspection the inspectors observed that the liquid radwaste discharge line was properly posted as a radiation area.
Unresol,ved Items Unresolved items were not identified during this inspection.
Licensee Action on Previous Inspector Follow-up Items (Closed)
(77-05-05) Maintenance and control of survey instruments.
The licensee has developed their own program for calibration and repair of survey instruments.
An inspector reviewed the'alibra-tion program and toured the calibration facility which appeared to be adequate.
I (Closed)
(78-15-01)
Phantom whole body count.
The licensee has developed a routine whole body counter efficiency check and docu-mentation program.
An inspector reviewed the licensee's daily efficiency checks and had no further questions.
(Closed)
(78-26-06) Control and accountability of temporary lead shielding.
The licensee has developed a quality assurance program that all lead shielding is removed from the containment prior to reactor start up and health physics personnel maintains the account-ability program.
An inspector reviewed this program and had no further questions.
(Closed)
(78-29-02)
Clean up contamination in the RHR pit, gas decay tank room and D valve room.
The licensee has decontaminated these areas.
An inspector reviewed the area survey results after decontamination and had no further questions.
(Closed)
(79-27-04) Radioactivity in storm drains.
The storm drains have been modified to empty into the intake canal and a
sampling program has been developed to sample the storm drains on a
periodic basis.
An inspector reviewed this program and had no further questions.
(Closed)
(80-17-01)
Reporting recommendations for the Health Physics Supervisor.
The plant 'organization structure has been modified to include a direct line of communication from the Health Physics Supervisor to the Plant Manager-Nuclear when necessary.
An inspector reviewed this organization change and had-no further question. ~
(Closed)
(80-17-02) Establishing a formal group with the sole re-sponsibility of ALARA.
The licensee has established a formal group with the sole responsibility of ALARA.
An inspector reviewed the plant organization change which included the formal ALARA group.
(Closed)
(80-17-03)
Independent measurements by quality assurance auditors.
On-site guality Assurance inspectors have included in their auditing the use of portable survey instruments while per-forming health physics audits.
An inspector reviewed a quality assurance inspection report of a health physics activity and it revealed the use of portable survey instruments during the audit.
The inspector found this to be adequate.,
(Closed)
(80-17-05)
Formal listing of qualifications for each Health Physics Supervisor.
The licensee has developed a formal listing of qualifications for each Health Physics Supervisor.
An inspector reviewed these qualifications and had no further questions.
(Closed)
(80-17-06) Preparation of job description for health physics personnel.
The licensee has prepared specific job descrip-tions for health physics personnel.
An inspector reviewed these job descriptions and had no further questions.
(Closed)
(80-17-07)
Closer liaison between the Corporate Health Physicist and the plant.
The Corporate Health Physicist visits the plant on a regular basis and the plant health physics personnel are attending appropriate health physics meetings to increase their technical knowledge.
An inspector discussed this item with the Corporate Health Physicist and Plant Health Physics Supervisor and had no further questions.
(Closed)
(80-17-13)
Inspection of emergency supplies.
The licensee uses new face masks sealed in cle'ar plastic bags with their emergency SCBA.
If'the SCBAs are used the face masks are replaced with new ones.
The SCBAs are used at least annually during emergency drills.
An inspector discussed the inspection program of the face masks with licensee personnel and had no further questions.
(Closed)
(80-17-14)
Increasing the computer capabilities for dose control.
The licensee has acquired a computerized dosimetry control system to maintain radiation exposure control of plant personnel.
An inspector looked at the operation and capabilities of this computerized dosimetry control system and had no further questions.
(Closed)
(80-17-15)
Proper wearing of dosimetry.
The licensee has altered its policy of requiring dosimetry and security badges to be worn together at chest level.
An inspector discussed this with licensee personnel and reviewed signs posted at the entrance to the radiation control area (RCA) instructing personnel on the proper manner in which to wear their dosimetry.
The inspector had no further question ~ 'I
-6-(Closed)
(80-17-16)
Performance audits to validate the calibration and performance of-TLD systems.
The licensee has established a
program with the University of Michigan to validate the calibration and performance" of their TLD system.
An inspector discussed this item with licensee personnel and had no further questions,.
(Closed)
(80-17-17) Acquisition of a GeLi System for the Health Physics Department.
The licensee has acquired a GeLi System for their health physics department.
(Closed)
(80-17-19)
General retraining of plant staff for radiation levels.
The licensee has revised its general employee training and retraining examinations to incorporate test questions concerning the levels of radiation in a radiation area.
An inspector reviewed these test questions and had no further questions.
(Closed)
(80-17-20)
More sensitive instruments for surveys.
The licensee has acquired SPA-3 scintillation detectors, Ludlum and Eberline RASCAL's to perform more sensitive surveys on equipment and materials outside the radiation controlled area.
An inspector reviewed pertinent procedures requiring these surveys and had no further questions.
(Closed)
(80-17-21)
Laundry survey procedures.
The licensee has revised its laundry survey procedure to incorporate the requirement that the health physics department perform radiation surveys of the laundered protective clothing.
An inspector reviewed the pertinent procedure and discussed this item with licensee representatives.
(Closed)
(80-17-24)
Development of procedures for surveys of'reas outside the radiation controlled area.
The licensee has developed a program for surveying areas outside the radiation controlled area.
An inspector reviewed pertinent procedures and had no further questions.
(Closed)
(80-17-30) Evaluation of the need for air sampling by the waste compactor.
The licensee has installed a portable continuous air monitor (CAM) at the waste compactor for use only when operating the waste compactor.
An inspector observed the location of this CAN and discussed with licensee representatives their program for air sampling near the low specific activity (LSA} box computer.
(Closed)
(80-17-33) Evaluation of present supply of portable survey instrumentation.
The 1'icensee has acquired numerous portable survey instruments for use during normal operation and refueling outages.
An inspector reviewed the inventory of instruments and types of instruments on hand and had no further question (Closed)
(80-17-35)
Records for air sampler flow calibration.
The licensee has acquired an air sample flow calibrator and developed a
program for documenting the air flow calibrations.
An inspector reviewed this program and had no further questions.
(Closed)
(80-17-36) Setting of friskeralarm setpoints.
The licensee has developed a program to set frisker alarm set points to 100 counts per minute (cpm)
above" background.
An inspector reviewed the pertinent procedure requiring this function and selectively
'xamined friskers for correct alarm set points.
(Open)
(80-17-04) Organizing and documenting the Health 'Physics retraining program.
The licensee is upgrading its training and retraining programs including organization and documentation.
(Open)
(80-17-08)
Review of the contents of the training programs.
At the exit meeting, licensee management stated that the possibility of using corporate specialists in education to assess the facility's training methods and techniques to ensure a quality training program will be explored.
(Open)
(80-17-09) Critiques of nonroutine tasks.
Licensee manage-ment assured the inspectors that such critiques are performed.
The inspector was unable to witness a critique during this inspection but will attend a number of critiques during a future inspection.
(Closed)
(80-17-25)
Development of procedures for change out of the containment exhaust filters.
In a letter dated September 23, 1980, the licensee responded to Significant Weaknesses and Violations identified during the Health Physics Appraisal.
A specific response
= to Finding C of Appendix A indicated that a preventative maintenance program had been established to inspect and change as appropriate the containment pur'ge exhaust filters. It further stated that a
portion of the filters-had been replaced and the remaining filters, would be changed shortly.
During this inspection, it was determined that a preventative maintenance program f'r the containment purge exhaust filters had not been established and that the filters had not been replaced.
The significance of operating the containment purge exhaust with filters in a deteriorated condition was emphasized in the Health Physics Appraisal report.
The inspector informed sitelicensee management by telephone on May 28, 1981, that failure to fulfill the commitment to establish a preventative maintenance program and replace degraded containment purge exhaust filters would be considered a deviation (250-251/81-12-01)
from a commitment to the NRC.
(Open)
(80-17-26) Methyl iodine testing for charcoal samples from emergency ventilation systems.
The inspector reviewed information presented by the licensee and stated that this item will remain open pending further revie (Open)
(80-17-27) Evaluation of ventilation flow in the auxiliary building.
The licensee stated that the evaluation had been initiated but definitive conclusions have not been enthusiastically pursued.
The inspector stated that in view of the forthcoming steam generator replacement project, the priority level for action on this item should be reevaluated (see paragraph 9 for similar open item}.
At the exit meeting, licensee management stated that measures will be taken to ensure a more speedy resolution to this matter.
(Open)
(80-17-28)
Hard piping of portable demin system.
The inspector reviewed and discussed with licensee representatives plans for conversion from the existing liquid radwaste system incorporating portable demineralizers to a system utilizing orginially installed demineralizers.
This will eliminate'he need for the portable demineralizer process system and its associated temporary piping.
(Open)
(80-17-29)
Procedure for dewatering portable demins.
The inspector reviewed extensive data collected by the licensee on different techniques for ensuring that spent portable demineralizers are properly dewatered.
A licensee representative stated that upon completion of experiments, an adequate procedure will be written.
I (Open)
(80-17-31) Activity estimation for, new compactor.
The inspector reviewed data collected from experiments and analytical methods developed by the licensee in attempts to establish an adequate procedure for activity esitmations for the LSA box com-pactor.
A licensee representative stated that empirical data appears to agree with their analytical approach.
However, a final decision as to which approach will be use has not as yet been made.
(Open)
(80-17-32) Determination of Groups I and II.
The inspector discussed with licensee representatives their approach to deter-mination of Transport Groups I and II r'adionuclides in radwaste shipments.
The licensee presently relates Ce-144 activity levels to the quantity of Plutonium present in shipments.
A method for other Transport Group I isotopes will be established following completion of a primary coolant analysis for transuramics being conducted at a national laboratory.
A method for identification of Transport Group II isotopes will be established thereafter.
(Open)
(80-17-34) Reverification of high calibration point on
,instrumentation calibrator.
The licensee has ordered a Yictoreen Condenser R Meter which is required to verify the source calibration.
The inspector was informed that the calibration source will not be
.
used until its calibration can be verified.
This remains open pending receipt of the condenser R meter or adequate controls to ensure that the source is not used for instrument calibration P
~
~
I
(Open)
(80-17-37) Functional check of instrumentation.
At the exit meeting the Acting Plant Manager-Nuclear stated that functional checks prior to each use of portable survey instruments will be conducted.
(Open)
(80-17-38)
Changes to procedures.
The inspector verified that health physics procedures HP-62 and HP-63 have been deleted.
The inspector recommended that reference to the corporate's procedure for determining Grade D breathing air be incorporated into procedure HP-60 and/or HP-65.
It was also recommended that a requirement to functional clieck a portable survey instrument prior to each use be included in HP-13.
Radwaste Shipping The inspectors selectively reviewed radwaste shipping records and discussed the program with licensee representatives.
The number of radioactive shipments has markedly decreased over the past year.
A l.icensee representative stated that this is attributable to better management of processing operations for radioactive liquids.
The licensee has purchased the portable demineralizer system leased and operated last year through a contractor and has increased the amount of water processed by the demineralizer. train by a factor of 3 to 4 prior to the resin bed requiring disposal.
The inspector reviewed data collected by the licensee which appears to indicate that adequate decontamination factors are maintained even though process time. is extended.
The inspector stated that such radwaste volume reduction methods should be continued.
During the inspection, two shipments. of radwaste were shipped to Barnwell.
Both loads involved CNSI 195-H casks with 2.7 Ci and
Ci respectively in each liner.
Principle isotope were Co-58 and Co-60.
The inspector reviewed the shipping records and had no comments or questions.
The LSA box compaction operation was examined.
A licensee representa-tive stated that the system had been purchased where until recently, the system had been owned and operated by the manufacturer.
The inspector was informed that to the licensee's knowledge, the HEPA filter unit on the compactor exhaust had never been replaced.
No instrumentation is provided to assess the operating status of these filters.
The inspector stated that instrumentation should be provided and a procedure developed for the compactor HEPA filter repl acements (250-251/81-12-02).,
, 4.
~
t
~
-10--
Steam Generator Replacement Project The inspector examined the licensee's preparations for the steam generator replacement outage.
Although unable to devote sufficient time for a thorough'evaluation of the project, the inspector con-cluded that it appeared that adequate supplies of protective clothing and portable survey instruments were available, that the change area appeared to be adequate and that the personnel contamination surveillance and exposure control programs appeared to be satisfactory.
During a tour of the Unit 3 Containment Building, the inspector noted that, air was flowing out of the opened equipment hatch.
The inspector stated that the flow of air should not be from contaminated or potentially contaminated areas to clean or less contaminated
'ocations.
A licensee repesentative stated that in response to IE Bulletin 79-02, the containment purge valves had been throttled back to approximately 15% of rated exhaust and that it appeared no restrictions had been placed on the supply fans.
If two supply fans and two exhaust fans were simultaneously in operation and both the personnel and equipment hatchs were open, air flows'ut of the equipment hatch.
Licensee management agreed to evaluate this matter.
The inspector stated that this item will be reviewed during future inspection (250-251/81-12-03}.
Potential Overexposure A routine monthly TLD readout on June 2, 1980, indicated that a
worker had received 5.8 Rem for the month of May.
Combined with previous exposure received during the second calendar quarter of 1980, it appeared that the worker had received 7.4 Rem since April 1, 1980.
The NRC was informed of this event by telephone on June 2, 1980.
During this inspection, the inspector reviewed the exposure evaluation report prepared by the licensee.
This report included descriptions of work activities, interviews with accompanying personnel, and comparisons with pocket dosimeter readings and other personnel exposures working with the individual allegedly overex-posure.
Based on the information provided in the report and discussions with licensee representatives, the inspector concluded that an exposure of 2. 14 Rem for the second calendar quarter of 1980 assessed by the licensee appeared to be appropriat e