Forwards IE Insp Repts 50-250/81-12 & 50-251/81-12 on 810518-22 & Notice of Deviation
ML17341A475
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/25/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A472 List:
References
NUDOCS 8109010263
Download: ML17341A475 (4)


See also: IR 05000250/1981012

Text

Nt'C"

AR REGULATOR', CCV

a:-GtOI~t ti

101 4IARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN 2 5 ]981

OI'FICIA<C

Florida Power

and Light Company

ATTN:

Mr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos. 50-250/81-12

and 50-251/81-12.

This refers to the routine safety inspection

conducted

by Mr. J .

R. Wray of this

office on

May 18-22,

1981, of activities authorized

by NRC Operating License Nos.

DPR-31

and

DPR-41 for the Turkey Point facility.

Our preliminary findings were

discussed

with Mr.

D.

W.

Haase,

Acting Plant Manager-Nuclear

at the conclusion

of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

During the inspection it was

found that certain activities

under your license

appear to deviate

from commitments to the

Commission

and

have

saf'ety signific-

ance.

This item is identified in the Notice of Deviation and enclosed

herewith

as Appendix A.

Please

provide

us in writing your comments

including

a descrip-

tion of corrective

actions that have

been or will be taken, corrective actions

which will be taken

to avoid further deviations,

and

the date your corrective

actions will be

completed'e

have

examined

actions

you

have

taken with regard

to previously identified

enforcement matters.

These are discussed

in the enclosed

inspection report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter

and the enclosed

report will be placed

in the NRC's Public Document

Room.

If the report

contains

any

information that

you believe

to

be

exempt

from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this

office

by telephone

within ten

days

from the

date

of this letter of your

intention to file a request

for withholding; and (b) submit within twenty-five

days

from the date

of this letter

a written application

to this office to

withhold such information. If your receipt of this letter

has

been

delayed

such

that

less

than

seven

days

are available for your review,

please

notify this

office promptly

so that

a

new due

date

may

be established.

Consistent

with

section

2.790(b)(1),

such

application

must

be

accompanied

by

an affidavit

executed

by the owner of the information which identifies the document or part

8l09010263

8108ii7"'DR

ADOCK 05000250'

Q

PDR.i

g ~

I >g1

as

~ Florida Power and Light Company

JUN 2 6 igSl

f

I'hereof

sought to be withheld,

and

a full statement

of the reasons

on the basis

of which it is claimed that the

information

should

be withheld

from public

disclosure.

This

section

further

requires

the

statement

to

address

with

specificity the considerations

listed

in

10 CFR 2.790(b)(4).

The information

sought to

be withheld shall

be incorporated

as far as possible into

a separate

part of the affidavit. If we

do not hear

from you in this regard within the

specified periods

noted above,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

.C,

R. C. L, Acting Director

Division of Resident

and

Reactor Project Inspection

Encl osur es:

1.

Appendix A, Notice of Deviation

2.

Inspection Report Nos. 50-250/81-12

and 50-251/81-12

cc w/encls:

J.

K. Hays, Plant Manager

~ %