Partially Deleted Insp Repts 50-245/89-01,50-336/89-02 & 50-423/89-01 on 890130-0203 (Ref 10CFR73.21).No Noncompliances Noted.Major Areas Inspected:Security Program Plans & Audits & Detection & Assessment Aids
ML20235Y892
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/28/1989
From: Cameron D, Keimig R, Lancaster W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20235Y890 List:
References
50-245-89-01, 50-245-89-1, 50-336-89-02, 50-336-89-2, 50-423-89-01, 50-423-89-1, NUDOCS 8903140670
Download: ML20235Y892 (9)


Text

{{#Wiki_filter:. ._ ._ _ _-___ _ _ _ _

,  b:;r , : ' ::     .
       .

L p2gg,,,,& *'.--- (

.y  g   .;  p t: 2 -
              [
 .,nrc; x"ow<w .t ... -     A.2:D.-- - -.- -

p .. . : n > > .

       ; %

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

r Report Nos. 50-245/89-01; 50-336/89-02; and 50-423/89-01 Docket Nos. 50-245; 50-336; and 50-423

   !

License Nos. DPR-21; OPR-65; and NPF-49 Licensee: Northeast Nuclear Energy Corporation ~ P. O. Box 270 Hartford, Connecticut 06141-0270 Facility Name: Millstone Nuclear Power Station, Units 1, 2, and 3 a Inspection At: Waterford, Connecticut Inspection Conducted: January 30 - February 3, 1989 Date of Last Physical Security Inspection: May 16-37, 1988 Type of Inspection: Routine Unannounced Physical Security Inspection Inspectors: /M/P 2/2.P[PY W. K. Lancaster,- Physical Security Inspector- date w _ .

         .. . . .

uams 2. bcPffY 0. F. Cameron, Reactor Engineer - Physical date ' Security Approved by: . Meguards Section # *er - # 9 R. R. Keimt @ ief date Division of Radiat Safety and Safeguards Inspection Summary: Routine unannounced Physical Security Inspection on January 30 - February 3,1989 (Report Nos. 50-245/89-01, 50-336/89-02, and 50-423/89-01) Areas Inspected: Licensee Action on Previously Identified Items; Management Support; Security Program Plans and Audits: Protected and Vital Area Physical Barriers; Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages and Vehicles; Alarm stations and Communica-tions; Power Supply; Testing, Maintenance and Compensatory Measures; Security

.     . Training and Qualifications; and the Safeguards Information Progra Results: The licensee was in compliance with NRC requirements in the areas inspecte g9031[[$

PDR O _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ ____________.___________-_______________________________1

_ _ _ ___ __ _ _ _ _ _ _ _ - __ __. .__ _ _ _ _ _ - _ - _ _ _

        '
.-  .
   . .

DETAILS ! Key Personnel Contacted Licensee and Contractor Personnel

    *H. Haynes - Station services Superintendent
    * Hallberg - Manager,. Nuclear Security, Northeast Utilities
    *P. Weekley -Station Security Supervisor
    *J. Provencal - Station Services Senior Engineer
    *P. Anhalt - Station Assistant Security Supervisor - Operations
    = *M. Gelinas - Station Assistant Security Supervisor - Administrative M. Klien - Station Security Coordinator J. Townsend - Station Assistant Security Supervisor - I&C E. Burke - Station Security Shift Supervisor D. Atwood - Station Security Shift Supervisor S. Foster - Station Security Shift Superviso *T.' Bowler - Station Computer Support Services Assistant Supervisor
    *E. Strom - Station Engineering Support Services
    *B. Duffy Station Engineer - Unit 2
    *I. Fidurski , District Manager, Burns International   l R. Bajorin - Captain of Operations, Burns International   j U. S. Nuclear Regulatory Commission (NRC)
    * Raymond - Senior Resident Inspector
    *P. Habighorst; 2 Resident. Inspector, Unit 2- -

_- L. Koloneuski 1 Resident ' Inspector, Unit 1

    * Indicates those present at the exit interview. --' Licensee Action on-Previously Identified Items (Closed) Violation (50-245/87-02-01); 50-336/87-02-01);
    (50-423/87-03-01); Several Safeguards Information Repositories were inspected during this inspection and all met the protection requirements of 10 CFR 73.2 (Closed) Violation (50-245/87-22-06); (50-336/87-20-06);
    (50-423/87-18-06): The openings in the vital area barrier have been properly secured with locking bars and security padlock (Closed) UI (50-245/87-22-09); (50-336/87-20-09);
    (50-423/87-18-09): The vital area door hinge pins have been secured. The hatchway has been secured with a security padloc The vital area barrier has been reconfigure and is now a substantial barrie _ - _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- _- _  --

i

* '
-
.  ;c
 . .

3 Management Support, Security Program Plans, and Audits Management Support - Management support for the licensee's physical security program was determined to be adequate by the inspector This determination was based upon the inspectors' reviews of various aspects of the licensee's progra Security Program Plans - The inspectors verified that changes to the - licensee's Security, Contingency, and Guard Training and Qualification Plans, as implemented, did not decrease the effectiveness of the respective plans, and had been submitted in accordance with NRC requirement j Audits - The inspectors reviewed the 1987 and 1988 annual security' program audit reports and verified that the audits had been conducted in accordance with the Security Plan (the Plan). The audits were very comprehensive in scope with the ~ results reported to the appropriate levels of management. The inspectors' review included the security organization's responses to the 1987 audit findings and the corrective actions-taken to remedy adverse findings. The documented corrective actions appeared appropriate - for the 1987 findings. The responses to.the 1988 audit findings and the corrective actions taken to remedy any adverse findings had not been completed at the time of the inspection. They will be reviewed during subsequent inspection . Protected and Vital ' Area . Physical Barriers, Detection - ---

      .
      - ;--

and Assessment Aids :2 Protected Area Barriers f The inspectors conducted:a physical inspection of the PA barrier on January 30 and 31,1989. The l ' inspectors determined, by observation, that the barriers were installed and maintained as described in the Pla Protected Area Detection Aids - The inspectors observed the PA perimeter detection aids on February 1,1989 and determined that they were installed, maintained and operated as committed to in the Plan, Isolation Zones - The inspectors verified that isolation zones were adequately maintained to permit observation of activities on both sides of the PA barrie Protected Area and Isolation Zone Lighting - The inspectors conducted a lighting survey of the PA and isolation zones on January 31, 1989. The inspectors determined, by observation, that lighting in the isolation zones was adequat Assessment Aids - The inspectors observed the PA perimeter assessment aids and determined that they were installed, maintained, and 4 l .

.       i

{ t U __ _ _ _----__- -_-_-_ ____ -_ .-.

_ __ , -- _ _ _- _ _ _ _ _ - _ - _ _ - _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ - _ _

.
.
  .v*
  . .

operated.as committed to in the Plan. . The inspectors identified several areas where the assessment aids were marginal. Licensee security management had previously identified assessment aids deficiencies and plans.are being made to improve assessment. The licensee-estimates that the design phase of.the improvement project will be accomplished during 1989 and that implementation will be during'1990. Areas of marginal assessment'were being compensated in accordance with' commitments in the Pla a THl3 FW.GAPH CONTAlfiS St.FEMARDS NFEMiiEi MD is fEI f02 PM.lC DEUS!2!, II IS IUTAI;MAlly LEFT BLAK . The progress on th'e assessment improvement project will be reviewed during subsequent inspection f. Vital Area Barriers - The inspectors conducted a physical inspection of several Vital Area (VA) barriers during the period of January 30 through February 2,1989. The inspectors determined, by observation, that the VA barriers were installed and maintained as described in the Plan. However, the inspectors identified several areas where the barriers were constructed of materials with marginal integrit Tp.!s Fm2AFil C0mjlis SAFEGl!ARDS iM0Glict M3 IS ET E02 P! t;st0SEE,1113 liiiSiiiEAllY LEFTELAH.

i l l l

- - - _ _ _ _ - _ _ _ _ _ _ _ _  _ _ _ _         i

_ _ _ _

-
.

The licensee plans to upgrade the above mentioned barriers with either more substantial material or by adding intrusion detection devices to the existing barriers. The licensee stated that a schedule for the installation of these upgrades will be available by April 1, 198 TE pet 3?!i R5TAills SMEMA! IDS IWif!E H f! M AMS IS EDI f0R PUSll0 DISCLOSUilE, IT IS 1.UEhT10HALLY - LEFTDLAI a In the above mentioned areas, the licensee had implemented compensa-tory measures in accordance with the Pla Tits PEAENH CONTAili! SAFEGUAUS laiCGATiB A0 IS K0T FOR PUBLIC DISCLOSLEE, IT IS INTENTIONALLY - LEFTBLAK , The progress on the VA barrier upgrades will be reviewed during subsequent inspections, Vital Area Detection Aids - The inspectors observed the VA detection aids and determined that they were installed, maintained and operated.as committed to in the Pla . Protected and Vital Area Access Control of Personnel, Packages and Vehicles The inspectors determined that the licensee was exercising positive control over personnel access to the PA and VAs. This determination was based on the following: 1) The inspectors verified that personnel are properly identified and authorization is checked prior to issuance of badges and key-card ) The inspectors verified that the licensee has a program to l confirm the trustworthiness and reliability of employees and , contractor personnel.

l l

       ;

_ _ _ _ _ - - _ - _ .

  *~      [

l * l . l 6 l 3) The inspectors verified that the licensee has a fitness for duty program in place. A drug screening program has been implemented and all new hires are screened prior to being ! authorized for unescorted access. The current program also calls for testing individuals for. caus ) The inspectors reviewed the security lock and key procedures and determined that they were consistent with commitments in the Plan. The inspectors also reviewed the PA and VA key inventory logs, and discussed leck and key procedures with members of the security force and the licensee's security staf S) The inspectors verified that the licensee takes precautions to i ensure that only authorized individuals can be added to the access list by having a member of management review the list

  - every 31 day ) The inspectors verified that the licensee has a search program, as committed to in the Plan, for firearms, explosives, incendiary devices and other unauthorized materials. The inspectors observed personnel access processing during shift changes and visitor access processing, and interviewed members of the security force and licensee's security staff about personnel access procedure ) The inspectors determined, by observation, that individuals in the PA and.VAs display-their access badges as require .
       - >

8) The inspectors verified that the licensee har escort procedures for visitors to'the PA and VA ) The inspectors verified that the licensee has provisions for expediting prompt access to vital equipment during emergencies and that the provisions are adequate for the purpos ) The inspectors verified that unescorted access to VAs is limited to authorized individuals. The VA access list is revalidated at least once every 31 days as committed to in the Pla b. The inspectors determined that the licensee was exercising positive control over packages and material that are brought into the P The inspectors reviewed the package and material control procedures and found that they were consistent with commitments in the Pla The inspectors also observed package and material processing and interviewed members of the security force and the licensee's security staff about package and material control procedure c. The inspectors determined that the licensee properly controls vehicle access to and within the PA. The inspectors verified that

   '

l l

   -     1 l

l _ _ - - - - - - _ - - _ - - - - - - l

_ _ _ _ _ _ _ _ _ , _ _ _ _

         !
 *
,  .
 . .

vehicles are properly processed prior to entering the PA. The  ! process was consistent with commitments in the Plan. The inspectors  ! also reviewed the vehicle search procedures and determined that they { were consistent with commitments in the Plan. This determination  ! was made by observing vehicle processing and search, inspection of vehicle logs, and by interviewing members of the security force and { j licensee's security staff about vehicle processing and search procedure jJ

         !

6. Alarm Station and Communications The inspectors observed the operation of the CAS and SAS and determined that they were maintained and operated as committed to in the Plan. CAS and SAS operators were interviewed by the inspectors and found to be knowledgeable of their duties and responsibilitie The inspectors verified that the CAS and SAS do not contain any operational activities that would interfere with the assessment and response function The inspectors observed tests of all communications capabilities in both the CAS and the SAS and reviewed the testing records for the communications channels. All were found to be as committed to in the Pla . Emergency Power Supply The inspectors verified <that there are several systems (batteries e dedicated diesel generator, and plant on-site AC power) that provide ~ backup power to the security systems and reviewed the accompanying test and maintenance procedures for these systems. The systems and procedures were consistent with the Pla The batteries, battery chargers and the diesel generators are located in VA The inspectors verified that the door access control system for Unit 3 VAs will permit emergency ingress and egress when normal power is lost. The licensee is currently in the process of modifying the Units 1 and 2 VA door access control system to permit similar emergency ingress and egres . Testing, Maintenance and Compensatory Measures The inspectors reviewed testing and maintenance records and confirmed that the records committed to in the Plan were on file and readily available for NRC review. The station Nuclear Security Organization has dedicated instrumentation and controls technicians as a part of the security organization to repair / replace and test , any security equipment which requires preventative or corrective l maintenance. A check of repair records indicated that ) repairs / replacements and testing has been accomplished in a timely manner.

L.m__ _.-_.__ ----___ --

_ . _ . . _ __ _____ _

..',. *
 .
   '8 I The inspectors reviewed the licensee's use of ~ compensatory measures and determined them to be as committed to in the Pla q 9.0, Security Training and Qualification    t The inspectors randomly selected and reviewed the' training and  j qualifications' records for 3 security officers (S0s). Physical  1 qualifications and. firearms. qualifications records were' inspecte These ' records were for armed guards, watchmen and supervisory personnel. The inspectors determined that the required training had been conducted in accordance with the security program plans and that it was properly documente Several S0s were interviewed to determine if they possessed th requisite knowledge-and ability to carry out their assigned dutie The interview results indicated that the S0s were very professional and. knowledgeable of their job requirement NOTE: The inspectors determined that the turnover rate in the security force for 1988 was very high, about forty-seven percen The inspectors expressed concern to the licensee that the overall experience level of the guard-force is being reduced by this turnover rate. - This potential problem will be reviewed during subsequent inspection The licensee's contract security force consists of approximately 203 S0s and supervisory personnel. The inspectors verified that the armed response force meets the commitments in the Plan and that there is always one full-time member of the security organization on-site who has the authority to direct security activitie The inspectors reviewed the Licensee Event Reports (LERs) for reporting of Safeguards events as required in 10 CFR 73.71. The inspectors determined that the incidents of guards found inattentive while on duty (four in 1988 and one in 1989) appears to be hig The licensee stated that more frequent post rotations and supervisory inspections of posts, as well as disciplinary measures, have been instituted to reduce such incidents and that the matter is being closely monitored. The inspectors determined that the five incidents of inattentive guards were not violations of NRC requirements since the guards were not posted to compensate for out-of-service equipment but, rather, as enhanced PA intrusion detection. This potential problem will be reviewed further during subsequent inspection .0 Safeguards Information Program The SGI program was reviewed in conjunction with the inspectors review of a previously identified violation in this area (reference paragraph 2.a.).

The licensee's actions in response to this violation appeared to be adequate and appropriate to the inspector . _ - _-____

. . . . ' ' , ..,'
 , ,.
   ,

9'

*  : 11.0 Exit' Interview Theinspectorsmetwiththelicenseereprese$tativesindicatedin paragraph 1 at the conclusion of the inspection on February 3, 1989. At
 'the time, the purpose and scope of the inspection were reviewed and the findings were presente . . ,-

At no time during this inspection was written material provided to .the

 , licensee..by the. inspector ~   ~
     ' .
  ,_ ,

7:; ' _ . - c: '

      ,
    -
    ,

l-I

       .i

, ,  !

E~-

   -

1  ;

   ._ L________.______

}}