. _..
.
-.
.-
--.-.-.
'
,
,
,
U.S. I'UCLEAR REGULATORY COMMISSION
.
'
0FFICE OF INSPECTION AND ENFORCEMENT i
_
Region I Report No. 50-245/78-16 Docket No. _50-245 License No. DPR-21 Priority
Category C
,
Licensee:
Northeast Nuclear Eneroy Company
,'
_P. O. Box 270
,
!
_Ha rtford, Connccticut 06101
,
j Facility Name:
Millstone Point Unit 1
'
Inspection att Northeast Utilities Service Corporation & Millstone Nuclear Power Station, Unit 1 Inspection conducted:
9-1 1978 g
Inspectors:
d.- /h f. u.7 r E.
b, Safeguards Technician date signed
.r S* 1.% 7 6
D. J. Holody, Mathematical Statistician date signed
~
,
j
'
'
T data signed
~~
Approved by:
kW 5/>(/7/
l UH. /o}nef, Chief Nuclear Material
- tedigned ContW1 Support Section, Safeguards Branch Inspection Summary:
Inspection on May 9-11. 1978 (Report No. 50-245/78-16)
i Areas Inspected:
Routine, unannounced inspection of nuclear material control i
and accounting including:
organization and operation; measurement and control; shipping and receiving; storage and internal e ntrol; inventory; records and reports; and, management of naterial control sustem.
The in-
.
i spection covered the period from January 1,1970, through brch 31, 1978, and involved 16 inspector-hours on site by two NRC inspectors
}
Results:
No items of noncompliance were identified'.'
s
.-
t
.
..
'..T'*
'
l
'
9708070284 970730 i
.
,
Region I Form 12
'
(Rev. April 77)
j,
'
q qot o lo My
,
+
_ _ _ - _ _
._ _ _
...
-.....
._.....
___
,.. _ _..
<
..
.
.
=D
DETAILS
1 1.
Persons Contacted
,
Northeast Utilities Service Corporation (NUSCO). Berlin Connecticut
- S. F. Zebzda, SNM Accountability Representative
,
Millstone point Unit 1
-
'
,
!
- E. J. Ferland, Millstone Point Plant Superintendent
'
- T. G. Piascik Reactor Engineer Unit 1 R. Herbert, Operations Supervisor
- denotes those present at the exit interview.
l 2.
Facility Organization and Operation
!
l The licensee has established an organizational structure that is responsive to nuclear naterial control and accounting requirements.
,
l-The overall custody of SNM and management of the nuclear material
'
control and accountability program is the responsibility of the
.
I Site Superintendent.
Sufficient item control areas (ICA) have been established for the
'
physical and adninistrative control of SNM, I
The possession and use of SNM has been confined to the locations
'
and purposes-authorized in the license.
All operations involving
<
Special Nuclear Material within an ICA are the responsibility of a single individual, the Reactor Engineer.
,
i The licensee is authorized to possess 4600 kilograms of contained i
Uranium U235 The activity for the period covered by this inspection
is shown on Exhibits I and II of this report.
.
-
No items of noncompliance were identified.
-
!
'
.
,
.,
,.
t
.
.
.
g
.,
.47
!
--
.
!
,
t l'
.
,
.
'~
_
J
_ _..
- __ _ _ - _ ____
--
... -
- -.
l
-
l
.
.
I
.
,
.
I 3.
Measurement _sy:d Controls T.% inspector reviewed tha licensee's method of detemining exposure j
data on th6 core, and the use of this data in the detemination of the urantu:s and uranium-235 depletion and the plutonium pro-
.
ductius The inspector also recalculated the depletion and pro-
duction. This review covered the four Fe,11 NRC-742 reporting periods from Januwf 1,1976, to March 31, 1978.
.
The licensee has a site process computer used to determine heat
'
rate from which GE detemines exposure.
This data is then used as input into another licensee computer program for the detemination
of the uranium and uranium-235 depletion and the plutonium production.
The inspector finds these methods acceptable ir t at the inspector's recalculated values were in excellent agreement with the values reported bl, the licensee on the Foms NRC-742 for each of the
- I four reporting periods that were reviewed.
No items of noncompliance were identified.
i 4.
Shipping and Receiving (
.
.
,
The licenste has established and maintains procedures to assure (
..
l that all special nuclear material received or shipped is accounted for.
,
I
'
The Reactor Engineer is responsible for fuel accountability, the j
final inspection of all new assemblies, and the review of associated i
documentation. The Unit Superintendent or his designee signs the i
Material Transfer Report (NRC-741) and provides the NUSCO Berlin.
Connecticut, office with a photo copy of the NRC-741 for the SNM
.'
accountant's records.
A review of all Foms NRC-741 generated for the period covered I
was conducted to determine proper signature, timely dispatch, and
'
accuracy of the data.
No items of noncompliance were identified, i
-
-
.
,
.
', '
o
-
-
.
.
,
.*
. e
-
..
}
,'
,
,
I
t8
.
t
.
.
. _.. _
,
_ _-
J
_.
- - _ _ _ _ _.
_-_
_.... _.. -
-.
.
.
.
.
.
.
'
.
,
.
l 5.
_ Storage and Internal control i
The licensee has established a system of storage and internal
'.
control of SNM which provides for current knowledge of the quantity, identity, and location of all SNM within the facility.
A card file is established for all fuel assemblies, stating the above infomation.
Computar pHnt-outs for each ICA are provided
,
l every six months and after fuel outages detailing fuel element location and isotopic composition.
Core, new fuel storage, and
,
g spent fuel pool schematics are maintained current.
I No items of noncompliance were identified.
6.
Inventory
,
The licansee has conducted inventories as required by 10 CFR 70.51(d)
and the licensee's SNM Accountability Procedure.
The inventor procedures are containau within this procedure. The licensee'y i
s last inventory was perfomed in March 1978.
l The inspector's inventory verification t.cr.sisted of a piece count i,
of the fuel in the spent fes) pool and a comparison with the core l
schematic for the locatica of each assembly.
!
Selected spent fuel bundle's serial numbers were compared to the
'
schematics and the card fi':a for position accuracy.
Core map serial numbers were comparea to the card file end Internal Material l
Transfer Foms for position accuracy.
l No items of none.ompliance were identified.
7.
Records and Reports
,.
The licensee's NUSCO, Berlin, Connecticut, office maintains a l
computerized program which provides the necessary infomation for material control.- The computerized control ledgers are maintained
,
by the SNM Accountability representative who alsn maintains copies
.
of material transfer documents (Form NRC-741) which are used for ration of the semiannual = material status iepor.ts (Form NRC-
'
.
.
.
'+
,
g
.
.
t
0 st.
.
- _ _ _ _
...-
- - - - - - - - - - - -
--
.
...
....
.. _ _
... _ _.
l
'
.
.
,
.
.
!
.
-
,
As noted in Paragraph 4, all material transfer documents covering this period were reviewed.
Material Status Repotts submitted I
during this period were also reviewed for proper' signature, time j
submission, and accuracy of data, t
i No items of noncompliance were identified.
8.
Management 'of Material Control System
'
The licensee has established a management system that provides' for
,
i development, implementation, and revision of the nuclear material
control procedures.
t As required by Reactor Procedure 1001/2001, the last annual audit of the SNM accountability system was perfonned by the SNM accountant-of the Berlin, Connecticut, office in June 1977.
t No items of noncompliance were identified.
9.
Exit Interview The inspectors met with the licensee representatives (denoted in i
paragraph 1) at the corclusion of the' inspection on May 11, 1978.
l The inspectors sumarized the purpose and the scope of the inspection and the findings and noted that no items of noncompliance were iden-
,
I tified.
i l
4
t l
l
-
.
e
%
o
'd
.
,
++
.: T'i
.
,
,
-
.
a g
ty '.
.
.
.,
'
.
.
....
..
- - -. -. -
.
.
..
,
'
..
.
-
EXHIBIT I Millstone Nuclear Power Station Unit 1
Peiiod: January 1,1976 - March 31,1978
l Material Balance Sumary
-
Enriched Uranium i
i RIS:
YLG Grams
,
Elemen,t, Isotope
.
Beginning Inventory 91/1/76 182078418 2495482
.
i Receipts 45395772
_1238841
,
Material to Account For 227474190 3734323
'
Removals:
!
Shipments 26775 603
'
!
,
. ',,
Burn-Up 166S261 844330
,
MUF
O
'
,
Total Removals:
1692036 844933
,
.
.,
Ending Inventory 9 3/31/78
,!
225782154
'2889390
.
Material Accounted For 227474190 3734323
,
.
.
~.
,
'O
+,.
.
l
,
'
,
,
.
'
eg.>
.
.
..
._
.. _
. _.____
, _ _ _
'
.....
.
..
,
~.
.
EXHIBIT II Millstone Nuclear Power Station Unit 1 Period:
January 1,1976 - March 31.1978
,
'
Material Balance Summary Plutonium RIS: YLG Grams Element Isotope Beginning Inventory 9 1/1/76 968350 753874 Receipts
0 Production 401923 275993 Material to Account For 1370273 1029867 Removals:
Shipments
66
.
Decay 5842 5842
!
Total Removals:
5917 5908
'
l'
.
Ending Inventory 9 3/31/78
_1364356 1023959
'
Material Accounted For
_1370273
_1029867
1