Insp Rept 50-245/78-16 on 780509-11.No Violations Noted. Major Areas Inspected:Organization & Operation,Measurement & Control,Shipping & Receiving,Storage & Internal Control, Inventory Records & Repts & Mgt of Matl Control Sys
ML20217G523
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/23/1978
From: Holody D, Joyner J, Shaub E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20217F592 List:
References
FOIA-97-256 50-245-78-16, NUDOCS 9708070284
Download: ML20217G523 (6)


Text

.

. _..

.

-.

.-

--.-.-.

'

,

,

,

U.S. I'UCLEAR REGULATORY COMMISSION

.

'

0FFICE OF INSPECTION AND ENFORCEMENT i

_

Region I Report No. 50-245/78-16 Docket No. _50-245 License No. DPR-21 Priority

Category C

,

Licensee:

Northeast Nuclear Eneroy Company

,'

_P. O. Box 270

,

!

_Ha rtford, Connccticut 06101

,

j Facility Name:

Millstone Point Unit 1

'

Inspection att Northeast Utilities Service Corporation & Millstone Nuclear Power Station, Unit 1 Inspection conducted:

9-1 1978 g

Inspectors:

d.- /h f. u.7 r E.

b, Safeguards Technician date signed

.r S* 1.% 7 6

D. J. Holody, Mathematical Statistician date signed

~

,

j

'

'

T data signed

~~

Approved by:

kW 5/>(/7/

l UH. /o}nef, Chief Nuclear Material

  1. tedigned ContW1 Support Section, Safeguards Branch Inspection Summary:

Inspection on May 9-11. 1978 (Report No. 50-245/78-16)

i Areas Inspected:

Routine, unannounced inspection of nuclear material control i

and accounting including:

organization and operation; measurement and control; shipping and receiving; storage and internal e ntrol; inventory; records and reports; and, management of naterial control sustem.

The in-

.

i spection covered the period from January 1,1970, through brch 31, 1978, and involved 16 inspector-hours on site by two NRC inspectors

}

Results:

No items of noncompliance were identified'.'

s

.-

t

.

..

'..T'*

'

l

'

9708070284 970730 i

.

PDR FOIA MCMURRY97-256 PDR

,

Region I Form 12

'

(Rev. April 77)

j,

'

q qot o lo My

,

+

_ _ _ - _ _

._ _ _

...

-.....

._.....

___

,.. _ _..

<

..

.

.

=D

DETAILS

1 1.

Persons Contacted

,

Northeast Utilities Service Corporation (NUSCO). Berlin Connecticut

  • S. F. Zebzda, SNM Accountability Representative

,

Millstone point Unit 1

-

'

,

!

  • E. J. Ferland, Millstone Point Plant Superintendent

'

  • T. G. Piascik Reactor Engineer Unit 1 R. Herbert, Operations Supervisor
  • denotes those present at the exit interview.

l 2.

Facility Organization and Operation

!

l The licensee has established an organizational structure that is responsive to nuclear naterial control and accounting requirements.

,

l-The overall custody of SNM and management of the nuclear material

'

control and accountability program is the responsibility of the

.

I Site Superintendent.

Sufficient item control areas (ICA) have been established for the

'

physical and adninistrative control of SNM, I

The possession and use of SNM has been confined to the locations

'

and purposes-authorized in the license.

All operations involving

<

Special Nuclear Material within an ICA are the responsibility of a single individual, the Reactor Engineer.

,

i The licensee is authorized to possess 4600 kilograms of contained i

Uranium U235 The activity for the period covered by this inspection

is shown on Exhibits I and II of this report.

.

-

No items of noncompliance were identified.

-

!

'

.

,

.,

,.

t

.

.

.

g

.,

.47

!

--

.

!

,

t l'

.

,

.

'~

_

J

_ _..

- __ _ _ - _ ____

--

... -

- -.

l

-

l

.

.

I

.

,

.

I 3.

Measurement _sy:d Controls T.% inspector reviewed tha licensee's method of detemining exposure j

data on th6 core, and the use of this data in the detemination of the urantu:s and uranium-235 depletion and the plutonium pro-

.

ductius The inspector also recalculated the depletion and pro-

duction. This review covered the four Fe,11 NRC-742 reporting periods from Januwf 1,1976, to March 31, 1978.

.

The licensee has a site process computer used to determine heat

'

rate from which GE detemines exposure.

This data is then used as input into another licensee computer program for the detemination

of the uranium and uranium-235 depletion and the plutonium production.

The inspector finds these methods acceptable ir t at the inspector's recalculated values were in excellent agreement with the values reported bl, the licensee on the Foms NRC-742 for each of the

- I four reporting periods that were reviewed.

No items of noncompliance were identified.

i 4.

Shipping and Receiving (

.

.

,

The licenste has established and maintains procedures to assure (

..

l that all special nuclear material received or shipped is accounted for.

,

I

'

The Reactor Engineer is responsible for fuel accountability, the j

final inspection of all new assemblies, and the review of associated i

documentation. The Unit Superintendent or his designee signs the i

Material Transfer Report (NRC-741) and provides the NUSCO Berlin.

Connecticut, office with a photo copy of the NRC-741 for the SNM

.'

accountant's records.

A review of all Foms NRC-741 generated for the period covered I

was conducted to determine proper signature, timely dispatch, and

'

accuracy of the data.

No items of noncompliance were identified, i

-

-

.

,

.

', '

o

-

-

.

.

,

.*

. e

-

..

}

,'

,

,

I

t8

.

t

.

.

. _.. _

,

_ _-

J

_.

- - _ _ _ _ _.

_-_

_.... _.. -

-.

.

.

.

.

.

.

'

.

,

.

l 5.

_ Storage and Internal control i

The licensee has established a system of storage and internal

'.

control of SNM which provides for current knowledge of the quantity, identity, and location of all SNM within the facility.

A card file is established for all fuel assemblies, stating the above infomation.

Computar pHnt-outs for each ICA are provided

,

l every six months and after fuel outages detailing fuel element location and isotopic composition.

Core, new fuel storage, and

,

g spent fuel pool schematics are maintained current.

I No items of noncompliance were identified.

6.

Inventory

,

The licansee has conducted inventories as required by 10 CFR 70.51(d)

and the licensee's SNM Accountability Procedure.

The inventor procedures are containau within this procedure. The licensee'y i

s last inventory was perfomed in March 1978.

l The inspector's inventory verification t.cr.sisted of a piece count i,

of the fuel in the spent fes) pool and a comparison with the core l

schematic for the locatica of each assembly.

!

Selected spent fuel bundle's serial numbers were compared to the

'

schematics and the card fi':a for position accuracy.

Core map serial numbers were comparea to the card file end Internal Material l

Transfer Foms for position accuracy.

l No items of none.ompliance were identified.

7.

Records and Reports

,.

The licensee's NUSCO, Berlin, Connecticut, office maintains a l

computerized program which provides the necessary infomation for material control.- The computerized control ledgers are maintained

,

by the SNM Accountability representative who alsn maintains copies

.

of material transfer documents (Form NRC-741) which are used for ration of the semiannual = material status iepor.ts (Form NRC-

'

.

.

.

'+

,

g

.

.

t

0 st.

.

- _ _ _ _

...-

- - - - - - - - - - - -

--

.

...

....

.. _ _

... _ _.

l

'

.

.

,

.

.

!

.

-

,

As noted in Paragraph 4, all material transfer documents covering this period were reviewed.

Material Status Repotts submitted I

during this period were also reviewed for proper' signature, time j

submission, and accuracy of data, t

i No items of noncompliance were identified.

8.

Management 'of Material Control System

'

The licensee has established a management system that provides' for

,

i development, implementation, and revision of the nuclear material

control procedures.

t As required by Reactor Procedure 1001/2001, the last annual audit of the SNM accountability system was perfonned by the SNM accountant-of the Berlin, Connecticut, office in June 1977.

t No items of noncompliance were identified.

9.

Exit Interview The inspectors met with the licensee representatives (denoted in i

paragraph 1) at the corclusion of the' inspection on May 11, 1978.

l The inspectors sumarized the purpose and the scope of the inspection and the findings and noted that no items of noncompliance were iden-

,

I tified.

i l

4

t l

l

-

.

e

%

o

'd

.

,

++

.: T'i

.

,

,

-

.

a g

ty '.

.

.

.,

'

.

.

....

..

- - -. -. -

.

.

..

,

'

..

.

-

EXHIBIT I Millstone Nuclear Power Station Unit 1

Peiiod: January 1,1976 - March 31,1978

l Material Balance Sumary

-

Enriched Uranium i

i RIS:

YLG Grams

,

Elemen,t, Isotope

.

Beginning Inventory 91/1/76 182078418 2495482

.

i Receipts 45395772

_1238841

,

Material to Account For 227474190 3734323

'

Removals:

!

Shipments 26775 603

'

!

,

. ',,

Burn-Up 166S261 844330

,

MUF

O

'

,

Total Removals:

1692036 844933

,

.

.,

Ending Inventory 9 3/31/78

,!

225782154

'2889390

.

Material Accounted For 227474190 3734323

,

.

.

~.

,

'O

+,.

.

l

,

'

,

,

.

'

eg.>

.

.

..

._

.. _

. _.____

, _ _ _

'

.....

.

..

,

~.

.

EXHIBIT II Millstone Nuclear Power Station Unit 1 Period:

January 1,1976 - March 31.1978

,

'

Material Balance Summary Plutonium RIS: YLG Grams Element Isotope Beginning Inventory 9 1/1/76 968350 753874 Receipts

0 Production 401923 275993 Material to Account For 1370273 1029867 Removals:

Shipments

66

.

Decay 5842 5842

!

Total Removals:

5917 5908

'

l'

.

Ending Inventory 9 3/31/78

_1364356 1023959

'

Material Accounted For

_1370273

_1029867