Forwards IE Insp Repts 50-245/78-37 & 50-336/78-34 on 781204-08.No Noncompliance Noted
ML19274D621
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/28/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19274D622 List:
References
NUDOCS 7902140367
Download: ML19274D621 (2)


Text

TPRh

- #a..%g, UNITED STATES k

NUCLEAR REGULATORY COMMisslON y

j j

REGION I

f

$31 PARK AVENUE of KING OF PRUS$1 A, PENNSYLVANI A 19406 DEC 2 81973 Docket Nos. 50-245 50-336 Northeast Nuclear Energy Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Subject:

Combined Inspections 50-245/78-37; 50-336/78-34 This refers to the inspection conducted by Mr. A. N. Fasano and Mr. R.

A. Feil of this office on December 4-8, 1978 at Millstone Nuclear Power Station, Waterford, Connecticut of activities authorized by NRC License Nos. DPR-21; DPR-65 and to the discussions of our findings held by Mr. Fasano and Mr. Feil with Messrs Herbert and Farrell at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews ith personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement 79021403d

.

-

Northeast Nuclear Energy Company

of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b) (4) of Secticn 2.790. The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

~

No reply to this letter is required; however, should you have any ques-tions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, si n

Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch Enclosure: Office of Inspection and Enforcement Inspection Combined Report Numbers 50-245/78-37; 50-336/78-34 cc w/ encl: