IR 05000245/1978038
| ML19282B186 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/16/1979 |
| From: | Devlin J, Evan Jones, Marquette Rogers NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19282B182 | List: |
| References | |
| 50-245-78-38, 50-336-78-35, NUDOCS 7903090340 | |
| Download: ML19282B186 (1) | |
Text
<
.
-
,-
~
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I 50-245/78-38 Report No. 50-336/78-35 50-245 Docket No. 50-336 Safeguards Group IV DPR-21 License No. DPR-65 Priority
--
Category C
Licensee:
Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut Facility Name:
Millstone Power Station Inspection at:
Waterford, Connecticut Inspection conducted:
December 11-14, 1978 Inspectors:
,
A,4#
9%q /1/f79
'
'
E. W. Jone., Physical Security Inspector date signed 9/ _ $n on
///x- /2 9
'
M. Roge'rs, Physfcal Security inspector date signed date signed Approved b> O u
/ // 4
w
[/Section,SafeguardsBranchJ)'W. Devlin, Chief, Security and Investigati Inspection Summary:
Inspection on December 11-14,1978 (Report Nos. 50-245/78-38 and 50-336/78-35)
Areas Inspected:
Routine, unannounced inspection by regional based inspectors of licensee"s security program to include the implementation of 10 CFR 73.55, which included Licensee's Internal Audits, Security Plan, Security Organization, Physical Barriers, Access Controls, Communications Controls, Detection Aids, Testing and Maintenance and Response Procedures.
The inspection involved 58 inspector-hours on site by two NRC regional based inspectors, and was initiated off shift.
Results:
Of the nine areas inspected, no apparent items of noncompliance were identified.
7903090340 Region I Form 12 (Rev. April 77)