ML20217G558
| ML20217G558 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/15/1978 |
| From: | Ratta A, Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20217F592 | List:
|
| References | |
| FOIA-97-256 50-213-78-01, 50-213-78-1, NUDOCS 9708070301 | |
| Download: ML20217G558 (7) | |
See also: IR 05000213/1978001
Text
_ - - - _ - _ _ _ _
__-__
_ _ _ _ _
1
.
_
_
. _ _ .
__
.
. .
U.S. NUCLEAR REGULATORY COMMISSION
'
i
0FFICE OF INSPECTION AND ENFORCEMENT
'.
1
j
Region I
.
1 --
Report No. 50-213/7R-n1
.
.
Docket No.
50 '>13
4
-
Safeguards
-License No.
Group
4
Category
c
Licensee:
_ Connecticut Yankee Atomic Power Comnany
_P. O. Box 270
i
_ Hartford. Connecticut 06101
$, - Facility Name:
Haddam Neck Plant
I
!.
Inspection at:
'iaddam Neck and Berlin, Connecticut
I
Inspection conducted: January 9-12, 1978
^
Inspectors:
.b-
'. I 7 /
.
}
A. Della Ratta, Auditor
date si.gned
k.
4
--
.
J '/f-75
.-
G. C. Smith) Auditor
/.
date signed
.
n
date signed
.
.
'
Approved by:
'Y
i
S - / I' 7 f
~
S
-
Acting ' Chief Nuclear Material Control
date signed
Support Section, Safeguards Branch
Inspection Summary:
Inspection on January 9-12, 1978 (Report No. 50-213/78-01)
Areas Inspected:
Routine, unannounced inspection of nuclear material control
and accounting including:
shipping and receiving; inv.entory; storage and internal control; records andorga
.
'
reports; management of material control syst'em; and, previously identified
noncompliance item.
'
NRC inspectors.
The inspection involved 42 inspector-hours on site by two
j
Results:
Oftheeightareasinspected,noapparentiteUs'o.fnoncompliancewere
identified in six areas; two apparent items of noncompliance [were identified in
-1
two areas (infraction - failure te maintain current procedures - Para. 3; defi-
.
ciency - failure to account for all special nuclear material
Para. 7).
,
..
?
9700070301 970730
'
.
,
MCMURRY97-256
e
Region I Form 12
(Rev. April 77)
,
-
p4
,
fja807CSol
-
_
_-
_ _ - _ _
'
'
'
o..
-
.
.
.
.
l
.
.
.
i
'
DETAILS
>
3
i
.'
l.
Persons Contacted
,
Principal Licensee Employees
a'
- V. E. Poeppelmeir, System Superintendent - Production
- R. Eppinger, Reactor Engineer .
- S. F. Zebzda, SNM Accountability Representative
T. Campbell, Instrumentation and Control Supervisor
.
- denotes those present at the exit interview.
!
l
2.
Licensee Action on Previous Inspection Findings
l
(0 pen) Noncompliance (50-213/78-01):
Failure to establish, main-
tain, and follow written material control and accounting procedures
t
which'are sufficient to enable the licensee to account for the
special nuclear material in his possession as defined by 10 CFR,70.
Sl(c).
The inspector determined that although a revised procedure
'
manual had been written, it had not been approved and implemented
- as of the time of this inspection.
(See comments in paragraph 3)
3.
Facility Organization and Operation
On January 10, 1978, the inspector reviewed the licensee's Special
Nuclear Material Control and Safeguard Procedure Manual, dated
i
October 1977, and determined that it had not been approved and
implemented in accordance with Section 6.8.2 of the licensee's
Administrative Controls which states:
"Each procedure and admini-
strative policy of 6.8.1, and changes thereto, shall be reviewed by
t
the Plant Operations Review Committee (PORC) and approved by the
Plant Superintendent prior to implementation and period.ically as
set forth in each document." This is in contrary to their letter
dated March 1,1976, which stated:
" Full compliance will be achieved
on or before the end of March,1976." This is an item of non-
compliance, at the infraction level, under 10 CFR 70.51(c).
(78-
,
01-01)
The licensee is authorized to possess 6550 kijograms of enriched
I
uranium U-235, and possession and use of sp cial nuqlear material
!
has been confined to'th6' locations and purposes authorized in the
license as required by 10 CFR 70.41.
The activity for the period
!
covered by this inspection is shown.on Exhibits A and B of this
report,
,
,
,, :iy
.
,
.
,
,
l
.
e
'
fri
,
_ _ - _ _ _ _ _
_
,
. . . . . . . _ .
_ .. .
..
. . . - . _ .
..
_ _ - - _ -
-
-
.
,
_
...
. _ _ _
i
. . .
.
.
.
4
-
[I
3
.
l
'I
'
!
4.
Measur ment and Control
.
!
!
The inspetor reviewed procedures, icdgers and computer printouts
to ascertain if~the licensee has established, maintained, and is
i
i
!
utilizing a method of computation for the determination of the
total element and isotopic composition of nuclear material in each
t
fuel bundle.
The licensee uses their own in-house computer program to detennine
.
i
isotopic composition, production and exposures for each fuel bundle
in the Reactor Core.
~
.
l
The inspector determined that the licensee's reported figures of
.}
'
the uranium-235 depletion and plutonium production as shown on the
l
Forms NRC-742 submitted for the periods July 1, 1975 to September
30, 1977 agrees with the amounts shown in their computer ledgers,
No items of, noncompliance were noted.
i
I
l
S.
Shipping and Receiving
i
The inspector's review for receipts of SNM confirmed receipt of one
i
hundred nine (109) fuel assemblies that were properly accounted for
during the period of March 1,1976 through September 30, 1977.
The
Nuclear Material Transaction Reports, Form NRC-741, were completed
j
in a timely and acceptable manner.
{
The licensee did not have any off-site shipments during the period
~
covered by this inspection.
,
No items of noncompliance were identified.
6.
Storage and internal Controls
-
A review of the licensehs records determined that a system of
i-
internal control'is being maintained with the computer program
'
providing data on the quantity, identity and current location of
i
all fuel assemblies within the fa'cility.
-
i
.
I
.
The fuel assemblies at the time of inspection, were located in the
'
t
core and spent fuel pool.
'
'
-
'
-
,
,
No items of noncompliance were identified.
'
,
. . .
.7
.
.
,
l
'
.
-
q
l
_ _ _ _ _ _ .
. . _
.
.
i._
..-
_.
__
'
.
..
.
.
.
,
i
.
4
?
.I
'
'
i
7.
Inventory
-
I
The inspector perfo.rmed an inventory verification on January 11,
{
1978 which consisted of a piece count of the assemblies in the
-
spent fuel pcol and cross checking the core loading schematic to
-
4
the tagboards, computer printout and the SNM card files.
Fuel
~
bundles were as follows:
I.
Location
Bundles
l
Reactor Core
157
Spent Fuel Pool
289
-
During this physical inventory verification, the inspector's noted
j
that two fission chambers (Serial Nos. R4372 and S1818), each con-
taining 3 Milligrams of 90% enriched U-235, located in a warehouse,
and two fission chambers (Serial Nos. 142 and 869), each containing
3 Milligrams of 90% enriched U-235, located in the reactor core,
--
.
had not been included in inventory records.
This is an item of
,
1
noncompliance, at the deficiency level, under 10 CFR 70.51(b)(1).
(78-01-02)
j
j
-- -.
,
'
!
8.
Records and Reports
- . . . .
.
All Forms NRC-741 documents for the period July 1,1975 through
September 30, 1977 were reviewed for completeness, accuracy, signa-
.
. . ture and timely dispatch.
Material Status Reports NRC-742 submitted
i
during this period were also reviewed for proper signature, time
submission and accuracy of data.
-
i
No items of noncompliance were identified.
-
,
9.
Management of Material Control Systems
,
.
The licensee has established a management system which provides for
the development, revision, implementation and enforcement of nuclear
material control and accounting., There is an organizational struc-
ture responsive to the nuclear material control and accounting
-
requirements pursuant to their license and applicable NRC regul'a-
l
tions.
"
-.
,
,
j
.
No items of noncompliance were identified. ' '
4
.
- b
'
2
'
.
.
,
.
.
.
t
,
i
/I
.
,
ey.
.
, . . .
4
..
.
... .._ _ __
.
.__
. . .
.
->
'.
-
.
,
,
5-
'
.
,
-
,
10.
Facil'ity Tour
,
The: inspectors walked through various areas of the facility to
observe operations and activities of the site personnel.
'
No-items of noncompliance were identified..
11.
Exit-Interview
'
..
The inspector met with. licensee. representatives (denoted-in para-'
graph 1) at the conclusion of the inspection on January 12. 1978.
The inspector-sumarized the scope and findings of the inspection.
.
$'
)
..-
e
k
.
O
e
e
G
%
-
-
.-
- i
,
, . ,
.
.
,
.,
%'
.
- e
,
h .*
- .
'?
i
.
.'
d
t
4*
.
.
m.
.
. . . . . . . . . . .. .
'
~
'
~
^ ~ ~ ~ ~ ^ ^ ~ ~ ~ ~ ~ ' ~
__ . . . .
_ _.
-.
-_.-. _
.
,
.__
-:,: *.
1*-
_
,
,
.
~
Exhibit A-
s
C-_onnecuticut-Yankee Atomic Power Company-
50-213 - DPR-61
Material Balance Summary
7/l/75 - 9/30/77
L
'
. Enriched Unranium
'
RIS:YEX
'
Grams
,
Element.
Isotope
.
,
Beginning-Inventory 9 7/1/75
134,849,212
2,790.856
Receipts-
44,878,398
1,797,050
-
Material to Account for-
179.727,610
4,587,906
'
Removals:
s
.
-Shipments:
-0-
0-
-
Fission and Transmutation
1,813.072
1,082,957
Total-
1.813,072
-1.082,957:
'
Ending Inventory 9 9/30/77
177,914,538
3,5041949
b
-
'
.
,
Total Material Accounted For
179,727,610
4.587,906
I
.
.
,
?
- - -
t
_
4
,*
s
0
a
,
'
C
4
9
D
9
e
t
i
e
g
!
.
.?
p'.
,,
.
-
.
4
9
i
/ 5
.
,,.
.
._ e
. _ .
_ .
-.
._.
- _ _ _ _ . . _ _ .
.
_ - _ _ - _ _ _ - - - _
_..__ _.
_ -
,
.
__ -
.
. .___
_ _ .
q.,
-o.
.
.
.. . . .
.
.
.: - -
-
-
Exhibit F,
.
Connecticut Yankee Atomic Power Company-
'
-
50-213 - DPR-61
Material Balance Sumary
7/1/75 - 9/30/77
4
.
<
^
Produced. Plutonium-
.
.
'
RIS:YEX
Grams
.
Element
Isotope
'
.
'-- ,
Beginning Inventory 7/1/75
988,309
775,073
.
,
-Production'
399.037
302,687
.
.
Material to Account For
-1,387,346
1,077,760
.
Removals
-
Shipments-
-0--
-0-
-
'
,
, Decay
10,158
10,158
Total
10,158
10,158-
u
Ending1 Inventory 0 9/30/77
1,377,188-
1,067,602
Total Material ~ Accounted For
1,387,346
- 1,077,760
'
,
,
.
.
'
3:
%