ML20217G510
| ML20217G510 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/24/1978 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Switzer D NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20217F592 | List:
|
| References | |
| FOIA-97-256 50-245-78-16, NUDOCS 9708070282 | |
| Download: ML20217G510 (2) | |
See also: IR 05000245/1978016
Text
___ _ ___
__--
- - -
._
__.
_.
-
. - -
- . . .
. .
GucLcf uRE ! ,
'
- ~MP"%j*g
-
umno suns
- [q ~~ "
NUCLEAn nEGULATORY COMMisslON
W 6ti a
,
noson i
s g>/ : j
-
r,
sei ,aan avenus
o
f
ninaorenvisia,ensuivtvauia i
.
dAYt4 1978
.....
4
Docket No. 50-245
.
Northeast Nuclear Energy Company
ATTN: Mr. D. C. Switzer
president
P. O. Box 270
Hartford, Connecticut 06101
.
Gentlemen:
.
.
Subject:
Inspection 50-245/78-16
!
This refers to the inspection conducted by Mr. E. Shaub of this office
'
on May 9-11,1978, at Northeast Utilities Service Corporation, Berlin,
'
Connecticut, and Millstone Nuclear Power Station, Unit 1, Waterford,
Connecticut, of activities authorized by NRC License No. DPR-21 and to
'
the discussions of our findi_ngs held by Mr. Shaub with Mr. E. Ferland of
your staff at the conclusion of the inspection.
,
g
Areas examined during this inspection are described in the Office of *
Inspection and Enforcement Ins?ection Report which is enclosed with this
letter.
Within these areas, t1e inspection consisted of selective
exa:ainaticns of procedures and representative records, interviews with
'
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice " Part
2. Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any infomation that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
,
from public disclosute. Any such application must be accompanied by an
'
affidavit executed by the owner of the infomation, which identifies the
document or part sought to be withheld, and which,contains a statement
,
of reasons w11ch addresses with specificity the ite'ms which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790.
The information sought to be withheld shall be incorporated as
,
'
,ll:
,
,.
9708070282 970730
4
'
McMURRY97-256
9~)40"7olbk
(
,
,
n
.
. _
_ _ _ . _ . _ _ _ _ _ .
.._
._
_ _ _ .
_____.__-_-_m
,
.
. . .
_.
- __
_ -
.-
- -.
.
.
-
.
.
Northeast Nuclear Energy Company
2
,
.
MAY 2 41974
far as possible into a separate part of the affidavit.
If we do not
j
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
i
-
1
-
No reply to this letter is requiredt however, should you have any ques-
tions concerning this inspection, we will be pleased to discuss them
.
j
with you.
Sincerely,
C
b.5
,
i
Walter G. Martin, Chief
Safeguards Branch
Enclosure: Office of Inspection and Enforcement Inspection Report
Number 50-245/78-16
l
ec w/ enc 1:
i
E. J. Ferland Plant Superintendent
i
D. G. Diedrick, Manager of Quality Assurance
!
A. Z. Roisman, Natural Resources Defense Council (Without Report)
.l.
Mr. S. F. Zebzda, NUSCO SNM Accountant, Northeast Utilities
ServiceCorporation(w/rptonly)
.
l
.
.
-
-.
.
,
a
l
.
%
-
,
!
. .
. . -
'
..
'
!
..
g,
!
t
-
,
.
f
t*
.
m
.
.
--
. - - -
- - _- .
---
--