~pg RfCII Wp geq A.
~v
< ~
+**>>>>
UNITED STATES NUCLEAR REGULATORY COMM ION
REGION I
'75 ALLENDALEROAD KING OF PRUSSIA, PENNSYLVANIA19406 March 24, 1989 Docket Nos.
50-220 Niagara Mohawk Power Corporation ATTN:
Hr. Lawrence Burkhardt,; III Executive Vice President Nuclear Operations 301 Plainfield Road Syracuse, Hew York 13212 Gentlemen:
SUBJECT:
HRC EVALUATION OF NINE NILE POINT UNIT
OPERATOR PROFICIENCY In a
telephone conversation on March 15, 1989, between Hr.
Robert Randa1 1, Unit-1'perations, Superintendent, and Mr.
Donald Flor ek, Senior Operations Engineer, arrangements were made for an NRC evaluation of operator proficiency.
Deficiencies in the operators performance using the emergency operating procedures were identified in NRC Inspection Report 50-220/88-22.
The NRC is planning to conduct the evaluation of all shift operating crews on the Nine Mile Point Unit-1 simulator, using NRC developed scenarios, during the week of Hay 22, 1989.
The scenarios will cover various types of broad evolution/transients and will not be limited to the use of the EOPs.
As your staff has agreed, the NRC will conduct the evaluations only after the facility senior management have indicated, in writing to us, that the Unit-1 operators have achieved the desired level'f proficiency in using the facility procedures.
In order for the NRC staff to "adequately develop scenarios for the evaluation, it will be necessary for you to furnish the reference material listed in Attachment 1 by Aprill 7, 1989.
Also we will need one simulator instructor and one operations person to assist in the validation of the simulator scenarios developed by the JIRC.
The two individuals will be required'o sign a security
'greement that they will not knowingly divulge the scenario contents to other facility personnel and not be involved in further training of the operators after validation of the scenario contents.
Future communications wi 11 confirm the schedule and finalize our needs.
Mr.
Randall has been advised of our reference material requirements.
Your cooperation with us in this matter is appreciated.
If you have any.
questions concerning this matter, please contact Mr.
Richard Conte, of my staff, at 215/337-5124.
Sincerely,
~>0403027'g0324 PDR ADOCK 05000220 PDC a
I M~~I/-
~ Thomas T.
Ma in, Director Division of Reactor Safety
. OFFICIAL RECORD COPY
~ ~
Niagara mohawk Power Corporation-2-CC:
C. Y. Hangan, Senior Vice President D. Palmer, Acting Manager, guality Assurance M. Hansen, tlanager, Corporate ()uality Assurance R.
G. Smith, Unit 2 Superintendent, Operations C.
Beckham, Hanager, Nuclear Ouality Assurance Operations P,.
B. Abbott, Unit 2 Station Superintendent J. Perry, Director, Nine Viile Point Unit 1 Restart Task Force K. Dahlberg, Unit 1 Station Superintendent R. Randall, Unit 1 Superintendent, Operations J. Willis, General Station Superintendert C. Terry, Vice President Nuclear Engineering and Licensing R. Randall, NMP-1 Operations Superintendent A. Rivers, HtlP Training Superintendent J.
F. Warden, Hew York Consumer Protection Branch Connor 8 Wetterhahn Troy B. Conner, Jr.,
Esquire Gary D. Wilson, Senior Attorney John W. Keib, Esquire Director, Power Division, Department of Public Service, State of Hew York State of New York, Department of Law Licensing Project Manager, NRR Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
HRC Resident Inspector State of Hew York
l/iagara Hohawk Power Corporation-3-bcc:
Region I Docket Room (with concur rences)
J.
Johnson, Chief Section 2C, DRP PAO Robert J. Bores, DRSS B. Clayton, EDO Letter to docket 50-220 Nine Nile Point 1 Restart Panel Nembers (.8.)
RI F
rek/djh 38 4/89 RI:DRS Conpt@g 3/~'/49 4v s. ~~+
RI:DRS RI:DRS Gallo
~,'1artin a"c.
3/ij'9 3/-'89 OFFICIAL RECORD COPY
Attachment
REFERENCE MATERIAL RE(UIREHENTS FOR NINE NILE POINT UNIT
OPERATOR ASSESSHENTS l.
Operator training material on NYiP-1 plant systems.
2.
All integrated plant procedures (normal or general operating procedures).
3.
All emergency procedures (emergency instructions, abnormal or special procedures)
including bases if available.
4.
Conduct of operations administrative procedures.
5.'ll annunciator/alarm procedures.
6.
Emergency plan implementing procedures.
7.
Technical specifications; 8.
System operating procedures.
9..
10.
Piping and instrumentation diagrams and electrical single-line diagrams.
S imu1 ator ma 1funct ion book.
I List of all preprogrammed initial conditions.
12.
Copy of simulator scenarios used by the facility to train on the EOP f