IR 05000410/1988008
| ML17055E265 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/19/1988 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mangan C NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 8810250394 | |
| Download: ML17055E265 (6) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION @BR: 8810250394 DOC. DATE'8/10/19 NOTARIZED:
NO DOCKET ¹
<-'jFACIL:50-410 Nine Mile Point Nuclear Stations Unit 2i Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION MARTINe T. T.
Region 1>
Ofc of the Director-RECIP. NAME RECIPIENT AFFILIATION MANGANs C. V.
Niagara Mohawk Poeer Corp.
SUBJECT:
- ck receipt of 880805 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-410/88-08.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR ENCL SIZE'ITLE:
General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES REC IP IENT ID CODE/NAME PD1-1 PD BENEDICT'
COPIES LTTR ENCL
1
1 REC IP IENT ID CODE/NAME HAUGHEYi M COPIES LTTR ENCL
1 INTERNAL:
ACRS DEDRO NRR/DLPG/PEB
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ILRB12 OE.M53ER. ANi J EG L
RGN1 FILE
TERNAL.
LPDR NSIC
2
1
1
2
1
1
1
1
1
1 AEOD NRR MORISSEAUi D NRR/DLPG/GAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9*
NUDOCS-ABSTRACT OGC/HDS1 RES/DSR DEPY NRC PDR RESL MARTINiD TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
OCT 19 1s88 Docket No. 50-410 Niagara Mohawk Power Corporation ATTN:
Mr. C.
V. Mangan Senior Vice President 301 Plainfield Road Syracuse, New York 13212 Gentlemen:
Subject:
Inspection No. 50-410/88-08
'I This refers to your letter dated August 5, 1988, in response to our letter dated July 6, 1988.
Thank you for informing us of the corrective and preventive actions documented in your letter.
These actions will be examined during a. future inspection of your licensed. program.
We acknowledge that two parts of the inspection report (50-410/88-08)
documen-ted your commitments incorrectly:
With regard to Niagara Mohawk walkdowns for your equipment reverification, we now understand that you completed 80% of this effort.
Since no significant equipment deficiencies existed, you plan to complete this reverification effort as equipment becomes available.
With regard to your effort to inspect Raychem cable splices, we now understand that your inspection was on a sampling basis.
Your cooperation with us is appreciated.
Sincerely, Originat Signed By:
Thomas T. Martin Thomas T. Martin, Director
. Division of Reactor Safety 88i0250394 8810l9 PDR ADDCK 05000410
PDC OFFICIAL RECORD COPY RL NMP2 88-08 0001.0.0 10/13/88
OCT 19 1988 Niagara Mohawk Power Corporation cc w/encl:
J.
A. Perry, Vice President, Quality Assurance W. Hansen, Manager, Corporate Quality Assurance R.
G. Smith, Unit 2 Superintendent, Operations C.
Beckham, Manager, Nuclear Quality Assurance Operations T. J. Perkins, Vice President, Nuclear Generation R.
B. Abbott, Unit 2 Station Superintendent J. Willis, General Station Superintendent C. Terry, Vice President Nuclear Engineering and Licensing W. Orews, Technical Superintendent Connor 5 Wetterhahn John W. Keib, Esquire Department of Public Service, State of New York State of New York, Department of Law Licensing Project Manager, NRR Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York bcc:
Region I Docket Room (with concurrences)
)
ORP~ction Chief Region I SLO PAO (2)
SALP Reports and All Inspection Reports Robert J. Bores, DRSS B. Clayton, EOO
~~nb(
RI:DRS RI:IMS Cheung/gcb/rw Anderson 10//'3/88 10/l~/88 w<<-
RI:
S Ma i'
10//7/88 OFFICIAL RECORD COPY RL NMP2 88-08 0002.0.0 10/13/88