Discusses Safety Insp Rept 50-410/88-21 on 881203-21 & Forwards Notice of Violation.Civil Penalty Will Not Be Issued Since Util Corrective Actions for Violations Were Comprehensive
ML17055E574
Person / Time
Site: Nine Mile Point 
Issue date: 03/13/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055E575 List:
References
EA-89-004, EA-89-4, NUDOCS 8903230219
Download: ML17055E574 (10)


Text

'~~ 'CCKMRATED DISTMBt 'TI04 DEMO~ STRATI04 SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~

~

~

CCESSION NBR:8903230219 DOC.DATE: 89/03/13 NOTARIZED:

NO DOCKET FACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH.NAME AUTHOR AFFILIATION RUSSELL,W.T.

Region 1, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION BURKHARDT,L.

Niagara Mohawk Power Corp.

SUBJECT:

Discusses Safety Insp Rept 50-410/88-21 on 881203-21

&

forwards notice of violation.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PDl-1 PD BENEDICT,R INTERNAL: ACRS AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR ll NRR/DREP/RPB

NRR/PMAS/ILRB12 REG FI

EXTERNAL: LPDR NSIC COPIES LTTR ENCL

1

1

2

1

1

1

1

2

1

1

1

1

1 RECIPIENT ID CODE/NAME SLOSSON,M AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS1 RGN1 FILE

NRC PDR COPIES LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1 h

NCTE IO ALL "RIDS" RECIPIENIS'IZASE HELP US 'IO REXJCE WASTE!

OONI'ACI'IHE DOQ3NEVZ CDÃIROL DESK RCCM Pl-37 (EXT. 20079) Io EZZMZNATE YOUR NME FRY DIPHKBUTION LISTS POR DOCKIMEXZS YOU DON'T NEEDj TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL 26 March 13, 1989 Docket No.

50-410 License No.

NPF-69 EA 89-04 Niagara Mohawk Power Corporation ATTN:

Mr. Lawrence Burkhardt, III Executive Vice President Nuclear 301 Plainfield Road Syracuse, New York 13212 Gentlemen:

Subject:

NOTICE OF VIOLATION (NRC Inspection Report No. 50-410/88-21)

This refers to the special NRC safety inspection conducted on December 3-21, 1988, at Nine Mile Point, Unit 2, Scriba, New York to review the circumstances associated with violations of NRC requirements which were identified by your staff and promptly reported to the NRC.

The report of the inspection was sent to you on January 9,

1989.

On February 2,

1989, an enforcement conference was conducted with you and members of your staff to discuss the violations, their causes, and your corrective actions.

Of particular concern to the staff, as discussed in the enforcement conference, was that a construction error was made and it was not identified despite preoperational testing and several subsequent operational surveillance tests.

The violations, which are described in the enclosed Notice of Violation, involve:

(1) the inoperability of one of the,two Automatic Depressurization System (ADS) divisions since initial operation in 1986 (contrary to the technical specifications)

because of a wiring error in the logic circuitry which occurred during a construction modification in 1985; and (2) the failure to promptly identify and correct this condition adverse to quality until December 1988, even though opportunities existed to detect this error sooner.

Mith respect to the second violation, the procedure for performing the preoperational test of the system in May 1986, which should have identified this error, was inadequate and the error went undetected.

In addition, in July 1986 during the performance of the ADS logic surveillance test,'he speci,fic step of the test procedure which would have identified this wiring error was deferred without proper justification.

In May 1988, during perform-ance of this same ADS logic test, a testing anomaly associated with the wiring error was identified; however, inadequate technical review resulted in failure to obtain proper resolution of the problem.

Furthermore, this error was not identified by the guality Assurance Program during reviews of the "as built" condition of the facility prior to startup, nor during any subsequent reviews of testing.

0001.0.0 89032302 K 050004io i9 8903i3 PDR ADOCK

OFFICIAL RECORD COPY CP PKG NINE MILE EA 89-04"A 03/10/89-or

t~

Niagara Mohawk Power Corporation

- 2-The NRC recognizes that the safety significance of the inoperable ADS division was minimized because of the operability of other redundant Emergency Core Cooling System (ECCS) equipment, namely, the other automatic ADS trip system, the manual initiation capability of the ADS valves, the High Pressure Core Spray System and the Reactor Core Isolation Cooling System.

Nonetheless, the two violations are classified in the aggregate as a Severity Level III problem in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

CFR Part 2, Appendix C (1988) (Enforcement Policy)

because the regulatory concern in this case was the failure to identify and correct this technical deficiency despite several previous opportunities.

Although a civil penalty is normally considered for a Severity Level III violation or problem, I have considered the escalation and mitigation factors set forth in the enforcement policy and have decided, after consultation with the Director of Enforcement and the Deputy Executive Director for Nuclear Materials Safety, Safeguards, and Operations Support, not to issue a civil penalty in this case because:

(1) the violation was identified by a member of your staff who was persistent and inquisitive in pursuing a problem during a

monthly surveillance test that was not specifically designed to detect such errors; and (2) your corrective actions for these violations, when identified, were'comprehensive.

Although the Division I ADS trip system was inoperable for an extended duration because of failures to identify and correct the error during previous tests, the NRC has decided not to utilize this escalation factor nor prior notice since these are the fundamental bases for the NRC decision to classify the two violations in the aggregate as a Severity Level III.

Further-more, the enforcement history at Unit 2 is average, as evidenced by Category

ratings in the operations and surveillance areas during the last two SALP assessments, and therefore, neither escalation or mitigation of the civil penalty amount for this factor is warranted.

The NRC also recognizes that Niagara Mohawk Power Corporation (NMPC) has made extensive management and organizational changes within the Nuclear Division since Unit 1 went into an extended shutdown in December 1987.

These changes were instituted to correct generally poor performance which has occurred over an extended period.

The problems that led to this extended shutdown of Unit 1 included the failures, at multiple levels within the NMPC organization, to promptly identify and correct existing problems.

The NRC is encouraged that the program developed in response to the Unit 1 shutdown for aggressively improving your organization'

ability to resolve existing problems at both units may have contributed to the persistent and inquisitive attitude exhibited by the technician who identified this error in December 1988.

You are required to respond to this letter and the enclosed Notice and should follow the instructions specified in the enclosed Notice when preparing your response.

In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence.

After reviewing you response to this Notice, including your proposed corrective actions and 0002.0.0 OFFICIAL RECORD COPY CP PKG NINE MILE EA 89-04"A-03/10/89

(<i l~

Niagara Mohawk Power Corporation

- 3-the results of future inspections, the NRC will determine whether further NRC, enforcement action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be place in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction'Act of 1980, Pub.

L. No. 96-S11.

Sincerely, Enclosure:

Notice of Violation 8 ~ PiloQ 3J~'

'JJJJ William T. Russell Regional Administrator cc w/encl:

C.

Mangan, Senior Vice President, Nuclear J. Willis, General Station Superintendent C. Terry, Vice President, Nuclear Engineering and Licensing W. Drews, Maintenance Superintendent J.

A. Perry, Director, Unit 1 Restart Task Force DE Palmer, Acting Manager, QA W. Hansen, Manager, Corporate Quality Assurance R.

G. Smith, Unit 2 Superintendent, Operations R. Randall, Unit 1 Superintendent, Operations C.

Beckham, Manager, Nuclear Quality Assurance Operations R.

B. Abbott, Station Superintendent, Unit 2 K. Dahlberg, Station Superintendent, Unit 1'.

F. Warden, New York Consumer Protection Branch Connor 5 Wetterhahn John W. Keib, Esquire Department of Public Service, State of New York State of New York, Department of Law Director of Power Division Licensing Project Manager, NRR 0003.0 '

OFFICIAL RECORD COPY CP PKG NINE MILE EA 89-04-A-03/10/89

Niagara Mohawk Power Corporation DISTRIBUTION:

Region I Docket Room. (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief Robert J.

Bores, DRSS PDR LPDR SECY CA HThompson, DEDS JMTaylor, DEDR JLieberman, OE WTRussell, RI LChandler, OGC TMurley, NRR SVarga, NRR Enforcement Coordinators RI, RII, RI II, RIV, RV WCook, Resident Inspector FIngram, GPA/PA BHayes, OI SConnel ly, OIA EJordan, AEOD WTroskoski, OE (Enforcement Specialist)

OE:Chron OE:EA DCS State of New York RI:EO 0g Ho 1 ody/mjh/pmb 2/)1 /89

~an 2/g/89 RI:DRP ohnson 2/iv/89 I:DRP Wenzinger

~2/ i't9'89 OE Lieberman 2/

/89 2/l</89 DEDRO Thompson 2/

/89 I:RC rez 0004.0.0 OFFICIAL CORD COPY CP Pgi NINE MILE EA 89-04-A-03/10/89