| Quarter | Site | Title |
---|
05000397/FIN-2017010-02 | 2017Q3 | Columbia | Failure to Control a High Radiation Area with Dose Rates Greater Than 1000 Millirem Per Hour at 30 Centimeters |
05000390/FIN-2017002-04 | 2017Q2 | Watts Bar | Failure to Report Multiple Examples of a Loss of Safety Function in accordance with 10 CFR 50.72 and 50.73 |
05000250/FIN-2017008-03 | 2017Q1 | Turkey Point | Potential Failure to Implement Adequate Foreign Material Exclusion Control |
05000282/FIN-2017001-01 | 2017Q1 | Prairie Island | Failure to Evaluate Changes to NRC Approved Methodology |
05000250/FIN-2017008-01 | 2017Q1 | Turkey Point | Potential Failure of Fire Detection Capability on Credited Train of Equipment Following High Energy Arc Flash Event |
05000250/FIN-2017008-04 | 2017Q1 | Turkey Point | Potential Inadequate Design Control of Current Limiting Reactor |
05000250/FIN-2017008-02 | 2017Q1 | Turkey Point | Potential Failure to Complete an Adequate Risk Assessmen |
05000395/FIN-2015407-01 | 2015Q4 | Summer | Security |
05000440/FIN-2015403-04 | 2015Q4 | Perry | Security |
05000440/FIN-2015403-05 | 2015Q4 | Perry | Licensee-Identified Violation |