Maine Yankee 321 OLD FERRY FERRY RD ** WISCASSET, ME 04578-4922 SAFEGUARDS SAFEGUARDS INFORMATION INFORMATION 29, 2009 September 29,2009 September MN-09-014 MN-09-014 RA-09-033 UNITED STATES NUCLEAR REGULARTORY COMMISSION NUCLEAR REGULARTORY COMMISSION Attention: Document Document Control Desk Washington, DC 20555 20555

Reference:

Reference:

' (a) License No: DPR-36 (Docket Nos. 50 50-309,

.. 309,72-030)

(b) Maine Yankee Letter to USNRC~93 USNRC, N"- -003 - Submittal of Revised Revised Maine Yankee ISFSI Security Security Plan-under Plari'under IlOCFR30:90d(ited 0CFR5.90 -dated February 3, 2009-*,~.,-,

2009 '

(c) Maine Yankee Yankee Letter to tJSNRC,MN-09-006 USNRC, MN-09-006 - Maine Maine Yankee Yankee MOUs with Local Law Enforcement Enforcement Agencies dated February 27, 2009 27,2009 (d)

(d) USNRC Letter Letter to Maine Yankee -' - Maine Maine Yankee Yankee Independent Independent Fuel Storage Plan Changes Storage Installation Security Plail Changes (TAC L24322) dated April 30, 2009 2009 (e)

(e) Maine Maine Yankee Yankee Letter to USNRC, MN-09-0 MN-09-013 13 - Physical Physical Security Plan PIan for Maine Maine Yankee Yankee Independent Independent Fuel Storage Installation, Installation, dated September September 3, 2009 3,2009

Subject:

Physical Physical Security Security Plan for Maine Yankee Yankee Independent Independent Fuel Storage Installation Installation Gentlemen:

This letter informs the USNRC that in accordance accotdanc,e with Reference which was Reference (d), 'which received received in response References (b) and (c), a complete response to References complete reformatting reformatting and issuance of issuance of the Physical Security Physical Security Plan for the Maine Yankee Independent Independent Fuel Storage Installation Installation has been implemented.

implemented. The changes changes were approved and became effective on August 3, 2009. Since the entire Plan was reformatted and re-titled, it was issued as Revision O. 0.

This revision was originally submitted on September J, 3, 2009 in reference reference (e); however, that submittal did not reflect reflect the addition on one critical task which was added to the Training Training and Qualification of the Plan. Accordingly, Qualification Chapter ofthe Accordingly, the updated plan and the updated 50.54(p)(2) updated 50.S4(p )(2) are included.

DOCUMENT DOCUMENT TRANSMITTED TRANSMITTED HEREWITH HEREWITH CONTAINS CONTAINS SAFEGUARDS SAFEGUARDS ,

INFORMATION.

INFORMATION. WHEN WHEN SEPERATED FROM ATTACHMENTS, THIS PAGE FROM ATTACHMENTS, PAGE IS "DECONTROLLED" "DECONTROLLED" SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION Based on the overall overall evaluation of the changes made to the the Physical Security Plan Plan for the the Maine Yankee Independent Spent Fuel Storage Installation, it has been determined that no physical security changes were made, and therefore the the changes do not decrease the Plan. Therefore the changes are being submitted under the provisions effectiveness of the Plan.

50..54(p)(2). Also, as required by 10 CFR SO.S4(p)(2),

of 10 CFR SO.S4(p)(2). 50.54(p)(2), a description of the changes is included as Attachment Attachment 11 to this letter.

If you have any questions, please contact me at (207)-882-1303 (207)-882-1303 or at jconnell@3yankees.com.

jconnell@3yankees.com.

dtrU1Y Very truly yours, yours, James Connell Vice President Attachments:

Attachments: 1 - Summary (Safeguards Information).

Summary of Changes (Safeguards Information) 2 - Physical Security Plan for Maine Yankee Independent Independent Fuel Storage Storage (Safeguards Information)

Facility (Safeguards w/o Attachments:

cc wlo Mr. John Goshen, P.E., Project Manager, USNRC Mr. Samuel Collins, Administrator, USNRC Region I Mr. Mark Roberts, Roberts, USNRC Region I Mr. Jay Hyland, P. E., State of Maine Mr. Pat Dostie, State of Maine Mr. Wayne Norton, VP, CNO, Maine Maine Yankee Yankee Mr. Joe Fay, Esq, Maine Yankee Yankee DOCUMENT DOCUMENT TRANSMITTED TRANSMITTED HEREWITHHEREWITH CONTAINS CONTAINS SAFEGUARDS SAFEGUARDS INFORMATION.

INFORMATION. WHEN WHEN SEPERATED SEPERATED FROM FROM ATTACHMENTS, ATTACHMENTS, THIS PAGE PAGE IS "DECONTROLLED" SAFEGUARDS SAFEGUARDS INFORMATION INFORMATION