Similar Documents at Byron |
---|
Category:Letter type:BYRON
MONTHYEARBYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements BYRON 2023-0022, 2022 Annual Radiological Environmental Operating Report (AREOR)2023-05-0404 May 2023 2022 Annual Radiological Environmental Operating Report (AREOR) BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-04-0606 April 2023 Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements BYRON 2023-0012, Cycle 26 Core Operating Limits Report2023-03-16016 March 2023 Cycle 26 Core Operating Limits Report BYRON 2022-0081, CFR72.48 Evaluation Summary Report2022-12-0909 December 2022 CFR72.48 Evaluation Summary Report BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2022-0069, 2021 Regulatory Commitment Change Summary Report2022-10-13013 October 2022 2021 Regulatory Commitment Change Summary Report BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment BYRON 2022-0065, Registration of Use of Cask to Store Spent Fuel2022-10-13013 October 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0063, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 20222022-09-29029 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 2022 BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) BYRON 2022-0059, Registration of Use of Cask to Store Spent Fuel2022-09-15015 September 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) BYRON 2022-0026, Annual Radiological Environmental Operating Report2022-05-0505 May 2022 Annual Radiological Environmental Operating Report BYRON 2022-0030, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report2022-05-0303 May 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report BYRON 2022-0028, Cycle 24 Core Operating Limits Report2022-04-28028 April 2022 Cycle 24 Core Operating Limits Report BYRON 2022-0016, Annual Dose Report for 20212022-04-0707 April 2022 Annual Dose Report for 2021 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline BYRON 2021-0063, Reactor Coolant System Pressure and Temperature Limits Report2021-09-28028 September 2021 Reactor Coolant System Pressure and Temperature Limits Report BYRON 2021-0064, Cycle 25 Core Operating Limits Report2021-09-28028 September 2021 Cycle 25 Core Operating Limits Report BYRON 2021-0032, 2020 Annual Radiological Environmental Operating Report (AREOR)2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report (AREOR) BYRON 2021-0031, 2020 Annual Radioactive Effluent Release Report2021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report BYRON 2021-0027, Annual Dose Report for 20202021-03-30030 March 2021 Annual Dose Report for 2020 BYRON 2021-0023, Registration of Use of Cask to Store Spent Fuel2021-03-25025 March 2021 Registration of Use of Cask to Store Spent Fuel BYRON 2021-0024, 2020 Regulatory Commitment Change Summary Report2021-03-19019 March 2021 2020 Regulatory Commitment Change Summary Report BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)2021-01-13013 January 2021 Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) BYRON 2020-0087, National Pollutant Discharge Elimination System (NPDES) Permit No. IL00483132020-12-16016 December 2020 National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0067, Cycle 22 Core Operating Limits Report2020-10-20020 October 2020 Cycle 22 Core Operating Limits Report BYRON 2020-0063, Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo2020-10-0101 October 2020 Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 232020-09-10010 September 2020 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2020-0025, Annual Dose Report 20192020-03-24024 March 2020 Annual Dose Report 2019 BYRON 2020-0015, Cycle 24 Core Operating Limits Report2020-03-17017 March 2020 Cycle 24 Core Operating Limits Report BYRON 2020-0010, Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 172020-02-13013 February 2020 Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 17 BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report2020-02-0707 February 2020 2019 Regulatory Commitment Change Summary Report BYRON 2019-0105, Post Examination Submittal Letter2019-11-26026 November 2019 Post Examination Submittal Letter BYRON 2019-0095, Registration of Use of Cask to Store Spent Fuel2019-10-10010 October 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0090, Registration of Use of Cask to Store Spent Fuel2019-09-18018 September 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0078, Registration of Use of Cask to Store Spent Fuel2019-08-22022 August 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0041, Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 162019-04-25025 April 2019 Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16 BYRON 2019-0035, Submittal of 2018 Annual Radioactive Effluent Release Report2019-04-18018 April 2019 Submittal of 2018 Annual Radioactive Effluent Release Report BYRON 2019-0040, Cycle 22 Core Operating Limits Report2019-04-15015 April 2019 Cycle 22 Core Operating Limits Report BYRON 2019-0039, Annual Dose Report for 20182019-04-11011 April 2019 Annual Dose Report for 2018 BYRON 2019-0022, 2018 Regulatory Commitment Change Summary Report2019-03-13013 March 2019 2018 Regulatory Commitment Change Summary Report BYRON 2019-0015, Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report2019-03-0707 March 2019 Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)2018-12-20020 December 2018 Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) 2023-06-01
[Table view] |
Text
- __
Byron Generating Station A_E:
ExelonGeneration 445ONorthGerrnanChurchRd www.exeloncorp.com March 13, 2019 LTR: BYRON 2019-0022 File: 1 .100101 (1 D.101 5A.106)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and SIN 50-455
Subject:
2018 Regulatory Commitment Change Summary Report The purpose of this report is to provide the Exelon Generation Company, LLC (EGC)
Regulatory Commitment Change Summary Report for Byron Station for commitment changes processed during the period from January 1 201 8 through December 31 201 8. Commitment changes are processed in accordance with Nuclear Energy Institutes (NEI) 99-04, Revision 0, Guidance for Managing NRC Commitment Changes, dated July 1999 and associated implementing procedures. For the period from January 1 201 8 through December 31 2018, there were two commitment changes processed in accordance with NEI 99-04, Revision 0 and associated implementing procedures requiring NRC notification.
If you have any questions concerning this report, please contact Gary Contrady, Acting Regulatory Assurance Manager at (815) 406-2496.
Respectfully, Mark E. Kanavos Site Vice President Byron Generating Station M EK/WG/rm Attachments
ATTACHMENT A BYRON STATION REGULATORY COMMITMENT CHANGE
SUMMARY
REPORT FOR 2018 Commitment Number: 454-251 08500, 454-251 831 00/ 1 031 4, 10339 Original Document and Commitment:
Byron Letter dated 1 1/3/88 in response to NRC Inspection Reports No 454/88016 and 455/88015 Subsection IWP-4160 of Section Xl of the ASME Code states, in part, that provision be made to duplicate the measurement point for those instruments which are position sensitive. On October 3, 1 988, spray painted markings were placed on each affected pump and a sign-off step was added to each applicable ASME pump surveillance, 41 procedures, requiring verification that vibration reference locations are clearly marked.
Subject of Change:
Delete the commitment but leave steps in the procedure.
Justifications for Change:
This does not meet the definition of a Regulatory Commitment due to being a specific corrective action to restore compliance with an Obligation.
Status:
The commitment was deleted under Commitment Change Number 18-007.
ATTACHMENT B BYRON STATION REGULATORY COMMITMENT CHANGE
SUMMARY
REPORT FOR 2018 Commitment Number: 8400-01 Original Document and Commitment:
This change refers to commitments made in response to NRC Generic Letter (GL) 93-04.
The Byron Station supplemental response to Generic Letter (GL) 93-04 is provided in an Attachment to the letter from D.J. Chrzanowski (Commonwealth Edison) to U. S. NRC, Supplemental Response to GL 93-04, Rod Control System Failure and Withdrawal of Rod Control Cluster Assemblies, dated September 16, 1993. The attachment reads as follows:
While the assessment indicates that the licensing basis is currently satisfied, Commonwealth Edison and the Westinghouse Owners Group believe that there are measures that can be taken by utilities to make compliance with GDC 25 more clear. Those recommended modifications include a combination of Rod Control System logic cabinet changes (current order timing adjustments) and a plant surveillance.
In the letter written by M.J. Vonk (Commonwealth Edison) to U.S. NRC, ComEd Response to RAI regarding Generic Letter 93-04, Rod Control System Failure and Withdrawal of Rod Cluster Assemblies, dated January 1 1 1 995, Byron Station committed to implementation of a current order timing modification prior to startup from its next refueling outage which begins after March 14, 1995 and performance of current order timing surveillance tests.
Subject of Change:
This Commitment was changed to no longer be applicable to Byron Unit 1 due to installation of the Westinghouse Ovation Rod Control Logic Cabinet Digital Upgrade. The Commitment remains in effect for Unit 2.
Justifications for Change:
As part of the Byron Unit 1 and 2 Westinghouse Ovation Rod Control Logic Cabinet Digital Upgrade, Westinghouse has updated and provided WNA-AR-00513-CCE. Section 6.2.2 within the document evaluates the applicability of WCAP-13864 to the Rod Control Logic Cabinet digital upgrade. Section 6.2.2 states the following:
The failures identified in WCAP-13864, Rod Control System Evaluation Program that resulted in single rod withdrawal (when insertion was demanded) were caused by failures in the Supervisory Logic 1 Card in the Solid State RCS Logic Cabinet. These two signals provide direction pulses to the Slave Cycler Decoder cards to identify the direction for rod motion. The failure of these signals caused both IN and OUT directions to be enabled in the Slave Cycler Decoders. This, in turn caused both the IN and OUT timed current orders to be output together, and the low output state takes precedence over the high output state. This caused demands for full current to take precedence over demands for no/reduced current, resulting in corrupted current orders. The Digital Rod Control System (DRCS) logic cabinet upgrade implements these functions (selection of IN or OUT) in software in a redundant controller. Within the Logic Cabinet upgrade, the current profiles for IN and OUT motion are stored in tables in the software. There
is no failure mode that can cause both tables of data to be selected and output simultaneously.
The failure modes outlined in WCAP-13864 are not applicable to the Logic Cabinet Upgrade.
The additional surveillance testing recommended by NSD-TB-94-05-ADA-RO is no longer required. Eased upon this, Commitment 8400-01 was changed effective to no longer be applicable to Byron Unit 1.
Status:
The commitment was changed under Commitment Change Number 18-01 2.