BYRON 2019-0041, Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16

From kanterella
Jump to navigation Jump to search
Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16
ML19120A111
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/25/2019
From: Kanavos M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BYRON 2019-0041
Download: ML19120A111 (4)


Text

Byron Generating Station 4450 North German Church Road

  • Exelon Generation Byron, IL61010-9794 www.exeloncorp.com SAFEGUARDS INFORMATION 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

April 25, 2019 LTR: BYRON 2019-0041 File: 1.10.0101 (1 D.101, 3C.107)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 .

NRG Docket Nos. STN 50-454 and STN 50-455

Subject:

. Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, ..

Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16 Byron Generating Station has made a change to the Security Plan. As required by 10 CFR 50.54(p)(2), we have concluded that the* changes to the Security Plan do not decrease the safeguards effectiveness.

In accordance with 10 CFR 50.4(b)(4) "Security plan and related submittals," the following attachments are enclosed for your review:

  • Attachment 1: Byron Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16 (Safeguards Information)
  • Attachment 2: Table of Changes for Security Plan Change Submittals
3 b DI SAFEGUARDS INFORMATION ATTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION LTR: BYRON 2019-0041 April 25, 2019 U.S. Nuclear Regulatory Commission Page2 contains Safeguards lnform.ation. Therefore, EGG requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).

There are no regulatory commitments in this letter.

Should you have any questions concerning this letter, please contact Mr. Jonathan Cunzeman, Regulatory Assurance Manager, at (815) 406-2800.

Respectfully, b--

PL-Mark E. Kan~vos Site Vice President Byron Generating Station MEK/ZC/rm cc: Regional Administrator - NRC Region Ill (All Attachments)

NRC Senior Resident Inspector - Byron Generating Station (No attachments) : Byron Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16 (Safeguards Information) : Table of Changes for Security Plan Change Submittals SAFEGUARDS INFORMATION

~TTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 1 Byron Station, Units 1 and 2 Docket Nos. STN 50-454 and STN 50-455 Byron Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and

  • Independent Spent Fuel Storage Installation Security Program, Revision 16 (Contains Safeguards Information)

SAFEGUARDS INFORMATION ATTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 2 Byron Station, Units 1 and 2 Docket Nos. STN 50-454 and STN 50-455 .

Table of Changes for Security Plan Change Submittals SAFEGUARDS INFORMATION AlTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED