BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) | 16 November 2023 | Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) | |
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | 10 October 2023 | Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal |
ML23159A130 | 8 June 2023 | Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) | |
BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements | 6 April 2023 | Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements | Nondestructive Examination |
BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) | 15 July 2022 | Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) | |
ML21355A407 | 21 December 2021 | Day Inservice Inspection Report for Interval 4, Period 2, (81 R24) | |
BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) | 13 January 2021 | Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) | |
ML20240A142 | 17 September 2020 | Day Inservice Inspection Report for Interval 4, Period 2, (B1R23) | Moisture barrier Through Wall Leak |
BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 23 | 10 September 2020 | Steam Generator Tube Inspection Report for Refueling Outage 23 | Nondestructive Examination |
RS-20-085, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | 24 July 2020 | Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | Coatings Incorporated by reference Fuel cladding |
NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 | 16 October 2019 | Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 | Boric Acid Nondestructive Examination |
ML19192A049 | 11 July 2019 | Day Inservice Inspection Report for Interval 4, Period 1, (B2R21) | Through-Wall Leak Through Wall Leak |
NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants | 30 April 2019 | Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants | Boric Acid Loop seal Nondestructive Examination |
BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) | 20 December 2018 | Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) | |
BYRON 2018-0027, Steam Generator Tube Inspection Report for Refueling Outage 20 | 5 April 2018 | Steam Generator Tube Inspection Report for Refueling Outage 20 | Nondestructive Examination |
BYRON 2018-0002, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20) | 18 January 2018 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20) | Boric Acid Nondestructive Examination Moisture barrier |
RS-17-163, Withdrawal of Relief Request RV-2 Associated with the Fourth Inservice Testing Interval | 20 November 2017 | Withdrawal of Relief Request RV-2 Associated with the Fourth Inservice Testing Interval | |
BYRON 2017-0048, Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21) | 15 June 2017 | Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21) | Boric Acid Weld Overlay Nondestructive Examination Moisture barrier Liquid penetrant |
RS-16-224, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | 8 November 2016 | Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | Nondestructive Examination Finite Element Analysis Liquid penetrant |
ML16300A036 | 26 October 2016 | Fourth Ten-Year Interval Inservice Inspection Program | Safe Shutdown Boric Acid Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Moisture barrier License Renewal Earthquake Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld |
BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) | 11 August 2016 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) | Boric Acid Nondestructive Examination |
ML16203A108 | 21 July 2016 | Fourth Ten-Year Interval Inservice Testing Program | Safe Shutdown Boric Acid Stroke time Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Grace period |
BYRON 2016-0011, Steam Generator Tube Inspection Report for Refueling Outage 20 | 5 February 2016 | Steam Generator Tube Inspection Report for Refueling Outage 20 | Nondestructive Examination |
BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20) | 29 December 2015 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20) | Boric Acid Nondestructive Examination Moisture barrier Liquid penetrant |
ML15216A609 | 20 August 2015 | Review of Fall 2014 Steam Generator Tube Inservice Inspection Report | |
RS-15-170, Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval | 22 June 2015 | Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval | Stroke time Grace period |
RS-15-155, Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | 29 May 2015 | Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | |
BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) | 21 January 2015 | 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) | Boric Acid Nondestructive Examination Liquid penetrant |
RS-14-251, Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | 8 September 2014 | Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | Weld Overlay Nondestructive Examination Liquid penetrant |
BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) | 24 June 2014 | Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) | Boric Acid Nondestructive Examination VT-2 Moisture barrier Liquid penetrant |
BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17) | 29 July 2013 | Day Inservice Inspection Report for Interval 3, Period 3, (B2R17) | Boric Acid Packing leak Hydrostatic Anchor Darling Nondestructive Examination VT-2 |
ML13008A077 | 3 January 2013 | Inservice Inspection Summary Report, for Inspection Activities from April 24, 2011 to October 8, 2012 | Boric Acid Nondestructive Examination VT-2 Liquid penetrant |
ML13008A093 | 3 January 2013 | Inservice Inspection Summary Report, Chapter 6.0, Containment ISI Program, Part 7 of 7-08X | Hydrostatic Moisture barrier |
ML13008A075 | 3 January 2013 | Inservice Inspection Summary Report, Form NIS-2 Owner'S Report for Repair/Replacement Activity, as Required by the Provisions of the ASME Code Section XI | Hydrostatic |
ML13008A073 | 3 January 2013 | Inservice Inspection Summary Report, Form NIS-2 Owner'S Report for Repair/Replacement Activity, as Required by the Provisions of the ASME Code Section XI | Hydrostatic |
ML13008A088 | 3 January 2013 | Inservice Inspection Summary Report, Form NIS-1 Owner'S Report for Inservice Inspections, Part 4 of 7-05 | |
ML13008A080 | 2 January 2013 | Inservice Inspection Summary Report, Weld/Component Outage Summary, Part 2 of 7-03 | VT-2 |
ML13008A076 | 2 January 2013 | Inservice Inspection Summary Report, Common-3rd Interval ASME Section XI Examination Status Report | |
ML112990783 | 1 February 2012 | Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | Weld Overlay Nondestructive Examination Incorporated by reference |
BYRON 2012-0001, Steam Generator Inservice Inspection Summary Report for Refueling Outage 16 | 4 January 2012 | Steam Generator Inservice Inspection Summary Report for Refueling Outage 16 | |
BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17) | 21 July 2011 | Day Inservice Inspection Report for Interval 3, Period 2, (B1R17) | Boric Acid Weld Overlay Hydrostatic Nondestructive Examination VT-2 EVT-1 |
RS-11-069, Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | 19 April 2011 | Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | Weld Overlay Nondestructive Examination Liquid penetrant |
ML111010535 | 8 April 2011 | Supplement to Byron Unit 1, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | High Radiation Area Nondestructive Examination |
RS-11-045, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | 24 March 2011 | Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations | Weld Overlay Nondestructive Examination Liquid penetrant |
BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15) | 3 August 2010 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15) | Boric Acid Weld Overlay Hydrostatic Nondestructive Examination VT-2 |
BYRON 2010-0041, Steam Generator - Inservice Inspection Summary Report for Refueling Outage 15 | 23 July 2010 | Steam Generator - Inservice Inspection Summary Report for Refueling Outage 15 | Time of Discovery Hydrostatic Nondestructive Examination |
ML100050357 | 5 January 2010 | 90-Day Inservice Inspection Report for Interval 3, Period 1, (B1R16) | Boric Acid Weld Overlay Nondestructive Examination VT-2 |
ML100050362 | 17 December 2009 | B1R16 Lsi Outage Report - Form NIS-1 Owner'S Report for Inservice Inspections | |
ML100050360 | 17 December 2009 | B1R16 Lsi Outage Report, Bolts, Pumps, and Valves Outage Summary | VT-2 |
ML090260075 | 22 January 2009 | Inservice Inspection Report for Interval 3, Period 1, (B2R14), Cover Through Section 2.0 | Boric Acid Nondestructive Examination VT-2 EVT-1 |