MONTHYEAR0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With 0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with ML20196A0191999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With 0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with ML20205R6351999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with 0CAN039904, Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with ML20199F0351998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ano,Units 1 & 2 ML20198D2441998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ano,Units 1 & 2. with 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with 0CAN109806, Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with 0CAN099803, Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with 0CAN089804, Monthly Operating Repts for July 1998 for Ano,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ano,Units 1 & 2 ML20236R0531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ano,Units 1 & 2 ML20236R0781998-05-31031 May 1998 Correction to Monthly Operating Rept for May 1998 for ANO, Unit 2 0CAN069802, Monthly Operating Repts for May 1998 for ANO Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for ANO Units 1 & 2 0CAN059805, Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 2 0CAN049802, Monthly Operating Repts for Mar 1998 for Arkansas Nuclear One,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Arkansas Nuclear One,Units 1 & 2 ML20217B1131998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 0CAN029805, Monthly Operating Repts for Jan 1998 for Ano,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Ano,Units 1 & 2 ML20217B1181998-01-31031 January 1998 Revised Monthly Operating Rept for Jan 1998 for Ano,Unit 1 0CAN019804, Monthly Operating Repts for Dec 1997 for ANO Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for ANO Units 1 & 2 ML20197J0851997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for ANO Units 1 & 2 ML20199D3841997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Arkansas Nuclear One,Units 1 & 2 0CAN109703, Monthly Operating Repts for Sept 1997 for Arkansas Nuclear One,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Arkansas Nuclear One,Units 1 & 2 0CAN099702, Monthly Operating Repts for Aug 1997 for Arkansas Nuclear One Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Arkansas Nuclear One Units 1 & 2 0CAN089704, Monthly Operating Repts for Jul 1997 for Arkansas Nuclear One1997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Arkansas Nuclear One 0CAN079706, Monthly Operating Repts for June 1997 for Arkansas Nuclear One,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Arkansas Nuclear One,Units 1 & 2 0CAN069703, Monthly Operating Repts for May 1997 for Arkansas Nuclear One (Ano),Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Arkansas Nuclear One (Ano),Units 1 & 2 0CAN059705, Monthly Operating Repts for Apr 1997 for Arkansas Nuclear One Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Arkansas Nuclear One Units 1 & 2 0CAN049705, Monthly Operating Repts for Mar 1997 for Arkansas Nuclear One,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Arkansas Nuclear One,Units 1 & 2 2CAN039703, Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 21997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 2 1CAN039706, Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 11997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 1 1CAN029703, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 11997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 1 2CAN029708, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 21997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 2 1CAN019702, Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 1 2CAN019703, Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 21996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 2 1CAN129603, Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 1 2CAN129608, Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 21996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 2 1CAN119602, Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 1 2CAN119605, Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 21996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 2 1CAN109607, Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One Unit 1 2CAN109604, Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One-Unit 21996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One-Unit 2 1CAN099602, Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One Unit 11996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One Unit 1 2CAN099606, Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One,Unit 21996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One,Unit 2 2CAN089607, Monthly Operating Rept for July 1996 for ANO-21996-07-31031 July 1996 Monthly Operating Rept for July 1996 for ANO-2 1CAN089603, Monthly Operating Rept for July 1996 for ANO-11996-07-31031 July 1996 Monthly Operating Rept for July 1996 for ANO-1 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 2CAN079605, Monthly Operating Rept for June 1996 for ANO-unit 2.W/1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for ANO-unit 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8931999-10-31031 October 1999 Rev 1 to BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20212L1141999-10-0101 October 1999 Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c 0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20216J6271999-09-27027 September 1999 Rev 0 to CALC-98-R-1020-04, ANO-1 Cycle 16 Colr ML20212F5261999-09-22022 September 1999 SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with ML20211F4281999-08-25025 August 1999 Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & Safety 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with ML20210K8831999-07-29029 July 1999 Non-proprietary Addendum B to BAW-2346P,Rev 0 Re ANO-1 Specific MSLB Leak Rates 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with ML20207E7231999-06-0202 June 1999 Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect ML20196A0191999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20196A6251999-05-31031 May 1999 Non-proprietary Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20195D1991999-05-28028 May 1999 Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14 ML20206M7711999-05-11011 May 1999 SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with ML20206F0691999-04-29029 April 1999 Safety Evaluation Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20205M6941999-04-12012 April 1999 Safety Evaluation Granting Relief for Second 10-yr Inservice Inspection Interval for Plant,Unit 1 ML20205D6061999-03-31031 March 1999 Safety Evaluation Supporting Licensee Proposed Approach Acceptable to Perform Future Structural Integrity & Operability Assessments of Carbon Steel ML20205R6351999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with ML20205D4711999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Employ Alternative Welding Matls of Code Cases 2142-1 & 2143-1 for Reactor Coolant System to Facilitate Replacement of Steam Generators at Arkansas Nuclear One,Unit 2 ML20204B1861999-03-15015 March 1999 Safety Evaluation Authorizing Licensee Request for Alternative to Augmented Exam of Certain Reactor Vessel Shell Welds,Per Provisions of 10CFR50.55a(g)(6)(ii)(A)(5) 0CAN039904, Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with ML20212G6381999-02-25025 February 1999 Ano,Unit 2 10CFR50.59 Rept for 980411-990225 ML20203E4891999-02-11011 February 1999 Rev 1 to 97-R-2018-03, ANO-2,COLR for Cycle 14 ML20199F0351998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ano,Units 1 & 2 ML20198M7841998-12-29029 December 1998 SER Accepting Util Proposal to Use ASME Code Case N-578 as Alternative to ASME Code Section Xi,Table IWX-2500 for Arkansas Nuclear One,Unit 2 0CAN129805, LER 98-S02-00:on 981124,security Officer Found Not to Have Had Control of Weapon for Period of Approx 3 Minutes Due to Inadequate self-checking to Ensure That Weapon Remained Secure.All Security Officers Briefed.With1998-12-11011 December 1998 LER 98-S02-00:on 981124,security Officer Found Not to Have Had Control of Weapon for Period of Approx 3 Minutes Due to Inadequate self-checking to Ensure That Weapon Remained Secure.All Security Officers Briefed.With ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20198D2441998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ano,Units 1 & 2. with ML20199F7401998-11-16016 November 1998 Rev 9 to ANO-1 Simulator Operability Test,Year 9 (First Cycle) ML20195B4801998-11-0707 November 1998 Rev 20 to ANO QA Manual Operations ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with ML20197H0741998-10-29029 October 1998 Rev 1 to Third Interval ISI Program for ANO-1 ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML17335A7641998-10-22022 October 1998 LER 98-004-00:on 980923,inadvertent Actuation of Efs Occurred During Surveillance Testing.Caused by Personnel Error.Personnel Involved with Event Were Counseled & Procedure Changes Were Implemented.With 981022 Ltr ML20154J2471998-10-0909 October 1998 SER Accepting Inservice Testing Program,Third ten-year Interval for License DPR-51,Arkansas Nuclear One,Unit 1 0CAN109806, Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods 0CAN099803, Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with ML20237B7671998-08-19019 August 1998 ANO REX-98 Exercise for 980819 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed 0CAN089804, Monthly Operating Repts for July 1998 for Ano,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ano,Units 1 & 2 ML20196C7831998-07-30030 July 1998 Summary Rept of Results for ASME Class 1 & 2 Pressure Retaining Components & Support for ANO-1 ML20155H7161998-07-15015 July 1998 Rev 1 to 96-R-2030-02, Revised Reactor Vessel Fluence Determination ML20236R0531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ano,Units 1 & 2 ML20249B7791998-06-22022 June 1998 Part 21 Rept Re Findings,Resolutions & Conclusions Re Failure of Safety Related Siemens 4KV,350 MVA,1200 a Circuit Breakers to Latch Closed ML20249B5091998-06-15015 June 1998 SG ISI Results for Fourteenth Refueling Outage 1999-09-30
[Table view] |
Text
. . . .
4 Entergy operations, Inc.
- ~~ENTERGY' m asa 333 R efS A,AR /2801 i
l Tel 501658 5000
~
4 January 15,1997 2CAN019703 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
- Monthly Operating Report Gentlemen
The. Arkansas Nuclear One - Unit 2 Monthly Operating Report for December 1996 is attached. This report is submitted in accordance with ANO-2 Technical Specification 6.9.1.6.
Very truly yours, Dwight C. Mims Director, Nuclear Safety
, DCM/ead attachment i
(v imu .
\
9701220290 961231 "'
PDR ADOCK 05000368 R PDR Q
U. S. NRC January 15,1997 2CAN019703 Page 2 cc: Mr. Leonard J. Callan Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector
- Arkansas Nuclear One P.O. Box 310 i
London, AR 72847 Mr. George Kalman 4 NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 4 One White Flint North
! 11555 Rockville Pike Rockville, MD 20852 4
l I
l l
W t
1 l
.. . -. . . . -.- . ..~~ - - - - . - . . . - -
s ~,
.i OPERATING DATA REPORT.
DOCKET NO: 50-368 )
DATE: January 15,1997 i COMPLETED BY: M. S. Whitt ;
TELEPHONE: (501) 858-5560 }
QiNRATING STATUS ;
i
- 1. Unit Name: Arkansas Nuclear One-Unit 2
- 2. Reporting Ponod . Dec.1-31 3, Licensed ThermalPower(MWt); 2,815 f
- 4. I'-- ;' ^: Rating (Gross MWe): 942.57 .
- 5. ' Design Electncal Rating (Net MWe): 912 !
I
- 6. Maximum Dependable Capacity (Gross MWe): 897
- 7. . Maximum t; -- ' ' ': Capacity (Not MWe): 858
- 8. If Changes Occur in Capacity Ratings (Items Number 3 This egh 7) Since Last Report, Give Reasons N/A l i
- 9. Power level To Which Restncted. If.Any (Net MWe): 884 i
- 10. Reasons For Restrictions. If Any: Selfimposed power restriction to ~ 97.0% power based on !
T-hot limitations in combination with steam generator plugging and fouling levels. l t
- I 4
4- MQ]S)) YR-TO-DATE CUMULATIVE I
b 11. Hours in Reporting Period 744.0 8,78 Q l47,000.0 '
j- 12. Number of Hours Reactor Was Critical 361.5 8,063.5 115,534.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 ]
! 14. Hours Generator On-Line 347.9 8,049.9 113,327.9 i
' 0.0 0.0 0.0
'15. Unit Reserve Shutdown Hours l 16. Gross Thermal Energy Generated (MWH) 863,486 22,072,932 302,335,417 i 17. Gross Electrical Energy Generated (MWH) 290,032 7,401,642 99,751,245 j 18. Not Electncal Energy Generated (MWH) 271,188 7,063,898 94,944,564
. 19. UMt Service Factor 46.8 91.6 77.1
} 20. Unit AvailabilityFactor 46.8 91.6 77.i
- 21. Unit Capacity Factor (Using MDC Net) 42.5 93.7 75.3 j- 22. Unit Capacity Factor (Using DER Net) 40.0 88.2 70.8 1 23. Unit Forced Outage Rate 53.2 8.4 10.I
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): .
j Refueling Outage 2R12 scheduled to begin April 25,1997 with an expected duration of 47 days !
I i
25, if Shut Down At End of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved l INITIAL CRITICALITY 12/05n8
- INITIAL ELECTRICITY 12/26n8 COMMERCIAL OPERATION 03/26/80 l
2 l
l
,j '
J .L . . . , _ . - . - . . . . - . - . , , . ._
.. . . - . -- - - . - . - ~ . . . - . -
+
h
. e AVERAGE DAILY UNIT POWER LEVEL ,
DOCKET NO: 50-368 UNIT: Two 1 DA*IE: January 15,1997 COMPLETED BY: M. S. Whitt .
i TELEPHONE: (501) 858-5560
- MONITI D%l., c 1996 3
i !
DAY AVERAGE DAILY POWERLEVEL (MWe-Net) 1............................ -5
, 2........... -5 ,
3........................... 5 ;
4............. .. -5 i 5............................. -5 ' -
6........................... -9 7............................ -12 8....-. . -12 }
9.............................. -12
{
10.......................... -1I !
11 . .... -11 l-12............................. _
-ii t 13 .. ..... -12 i 16 l 14 . .......
1....................... -28 16........................ -31 I
17............................. 28 1 18........................... 205 19............................ 684
. 20............................ 873
, 21.. ........
878 22............................. 879
- 23. 879 24.......................... 883 25........................ 883 26..................... 884 27........................... 883 28......................... 882 29........................... 882 30...........................
31 ....... 882 AVGS: 365 INSTRUCTION i On this fonnat, list the average daily unit power level in MWe-Net for each day in reporting month. Complete to the nearest whole megawatt.
I I
i 1
l
^
UNrr SHUTDOWNS AND POWER REDUCTIONS .
REPORT FOR DECEMBER 1996 DOCKET NO. 50-368 UNIT NAME ANO Unit 2 DATE January 15,1997 COMPIETED BY M. S. Whitt TEI2 PHONE 501-858-5560 METHOD OF IJCLMSEE DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO JEL DATE HPf IHOURS) REASON 8 REACTOR' REPORT # CODE' CODE' PREVENT RECURRENCE 96-41 961291 F 396.2 A 4 AB SG Unit tatem off Hee due to increased prinsary to secondary leakage la "A" -
Steam Generator.
1 2 3 4 F: Forced Reason: Method. Exhibit G -Instructices 5: Scheduled A- Equipment Failure (Explain) 1 - Manual for Preparaties of Data B - Maintenance of Test 2 - Manual Scram. Entry Sheets for Ucensee C- Refineling 3 - Automatic Scram. Event Report (LER) File (NUREG-4161)
D- Regulatory Restriction 4 - Continuation ,
E - Operator Training & Ucense Examination 5 -Imed Reduction F- Administration 9 - Other 5 G - Operational Error Exhibit I- Same Source H - Other (Explain)
. . _ _ _ . _ . _ .____m._ . . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ - -_ _ _ _ . - - , , - , , , ww+ -
NRC MONTIILY OPERATING REPORT OPERATING
SUMMARY
l DECEMBER 1996
, UNIT TWO l
The unit began the month of December off-line for forced outage 2F96-1.
Following the completion of steam generator work, the unit commenced plant startup and at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on the sixteenth the reactor achieved criticality. At 1209 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.600245e-4 months <br /> on the seventeenth, the unit was placed back on-line and proceeded with its normal power escalation following an outage. l The unit reached its maximum achievable power level at 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> on the twentieth.
The unit operated the remainder of the month at 97% power.
. - - _ - _ _ - .- - - . _ - _ . ~ . - - - . - - .--
i i
Reporting Period: December 1996 i
REFUELING INFORMATION . ;
- 1. - Name of facility: Arkansas Nuclear One - Unit 2
- 2. Scheduled date for next refueling shutdown: April 25.1997 i
- 3. Scheduled date for restart following refueling: June 13.1997 f
Will refueling or resumption of operation thercaAer require a technical specification change or other !
4.
license amendment? If answer is yes, what, in general, will there be? If answer is no, has the reload :
fuel design and core configuration been reviewed by your Plant Safety Review Committee to i determine whether any unreviewed safety questions are associated with the core reload (Ref.10CFR l Section 50.59)?
Yes. increase fuel enrichment limit from 4.1 weinht percent to 5.0 weiaht ocreent. revisc reactor t enaba* system (RCS) flow limit. revise RCS volume. add methodoloav references to the Core r Oper=*iaa Limits Report m4=la!ony list. and chanac tolerance for when core protection calculator power indications must be adjusted to calorimetric results.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
Fuel enrichment channe submitted Aunust 1996: RCS volume. methodoloav references. and power I adjustment tolerance submitted in December 1996.
l l
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unrevicwed design or performance analysis methods, significant changes in fuel design, new l operating procedures. ,
Fuel enrich acnt change discussed under auestion 4. ,
I
- 7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool: ;
I a) Ul b)2H
- 8. 'Ihe present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuct assemblies: ;
present 238!8 increase size by 0
- 9. '!he projected date of the last refueling that can be discharged to the spent fuel pool assuming the )
present licensed capacity:
DATE: 1997 (Loss of full core off-load capability)
!