05000498/LER-1997-009, Forwards Rev 1 to LER 97-009 Re MSSV Setpoints Found Outside Required Tolerances.Another Suppl to LER Will Be Submitted to NRC by 980801 to Discuss Results of Root Cause Investigation

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to LER 97-009 Re MSSV Setpoints Found Outside Required Tolerances.Another Suppl to LER Will Be Submitted to NRC by 980801 to Discuss Results of Root Cause Investigation
ML20247K686
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 05/04/1998
From: Jordan T
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247K691 List:
References
ST-NOC-AE-00014, ST-NOC-AE-14, NUDOCS 9805220179
Download: ML20247K686 (2)


LER-2097-009, Forwards Rev 1 to LER 97-009 Re MSSV Setpoints Found Outside Required Tolerances.Another Suppl to LER Will Be Submitted to NRC by 980801 to Discuss Results of Root Cause Investigation
Event date:
Report date:
4982097009R00 - NRC Website

text

N pe aw a r sa raminpatuxamness uam na awm unth raunm .,

May 4,1998 ST-NOC-AE-000149 I

File No.: G26 10CFR50.73 STI: 30605506 U. S. Nuclear Regulatory Comnussion Attention: Document ControlDesk {1 Washington,DC 20555 South Texas Project Unit 1 Docket No. STN 50-498 Revision I to Licensee Event Repon 97-009 Main Steam Safety Valve Setpoints Found Outside Required Tolerance Pun;uant to 10CFR50.73, the South Texas Project submits the attached revision to Unit 1 Licensee Event Report 97-009 regarding Main Steam Safety Valve setpoints found outside required tolerances. This event did not have an adverse effect on the health and safety of the public.

This revision reports the results of special testing performed on Main Steam Safety Valves to confirm the effectiveness of corrective actions taken to preclude valve lift outside required tolerances. The corrective actions were not validated. Therefore, this report discusses additional j actions to address this issue. Changes are indicated by revision bars. Another supplement to this l licensee event report will be submitted to the Nuclear Regulatory Commission by August 1,1998 {

to discuss the results of the root cause investigation and long term corrective actions.

l In addition to the commitment to supplement this repon by August 1,1998, the other f commitments made in the originallicensee event report are revised as indicated in the corrective adion j section of the attachment to this letter. If you should have any questions on this matter, please contact Mr. S. M. Head at (512) 972-7136 or me at (512) 972-7902.

j 1

l!

Jh -

. ordan ,

Manager, Systems Engineering l KJT/

  • e

Attachment:

Revision I to IIR 97-009 (South Texas, Unit 1)

.c73 l 9805220179 980504 h .,

PDR ADOCK 05000498  ;

S PDR '

I i

4 .

ST-NOC-AE-000149 File No.: G26 Page 2 Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U. S. Nuclear Regulatory Commission One Alamo Center 611 Ryan Plaza Drive, Suite 400 106 S. St. Mary's Street, Suite 700 Arlington, TX 76011-8064 San Antonio,TX 78205-3692 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13H3 Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 David P. Loveless Richard A. Ratliff Sr. Resident Inspector Bureau of Radiation Control c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 1100 West 49th Street Bay City, TX 77404-0910 Austin, TX 78756-3189 J. R. Newman, Esquire D. G. Tees /R. L. Balcom Morgan, Lewis & Bockius Houston Lighting & Power Co.

1800 M. Street, N.W. P. O. Box 1700 Washington, DC 20036-5869 Houston,TX 77251 M. T. Hardt/W. C. Gunst Central Power and Light Company City Public Service ATTN: G. E. Vaughn/C. A. Johnson P. O. Box 1771 P. O. Box 289, Mail Code: N5012 San Antonio,TX 78296 Wadsworth,TX 77483 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin,TX 78704 O