05000461/LER-1997-033, Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments

From kanterella
Jump to navigation Jump to search
Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments
ML20199A959
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/16/1998
From: Walter MacFarland
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199A966 List:
References
U-602904, NUDOCS 9801280131
Download: ML20199A959 (2)


LER-2097-033, Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments
Event date:
Report date:
4612097033R00 - NRC Website

text

. ..

, q lihnois Power Company Chnton Power Station P.O Box 678 Chnton. IL 61727 Tel 217 935-5623 Fax 217 93s-4632 Walter o. MacFarland IV Chief Nuclear Off.cer ILLIN91S POWER u.602904 An liknova Company 2C.220 January 16,1998 Docket No. 50-461 10CFR50.73 Document Control Desk Nuclear Regulatory Commission Washinron, D.C. 20555

Subject:

Clinton Power Station - Unit 1

.Ii c;isee Event Report No. 97 033-00

Dear Madam or Sir:

1

^

Enclosed is Licensee Event Report (LER) No. 97-033-00: Misinteroretation of Technical Specification Bases Results in Failure to Meet Reauired Technical Soccification Actions for Two Inoperable Emergency Core Coolina Subsystems. This report is being submitted in accordance with the requirements of 10CFR50.73.

This Licensee Event Report contains the following commitments:

m

  • Clinton Power Station is committed to train the Operations Department on any amendments to the Technical Specifications based on the results of a review of instrumentation.
  • Review the requirements ofinstrumentation required during a shutdown condition.

/

/

  • Revise the Operations procedure on Technical Specification tracking to add clarification on reviewing the Technical Specification Bases for any additional actions. /

p Sincerely yours, 9001280131 900116 #

PDR ADOCK 05000461 S PDR

.-avvvv Walter G. MacFarland, IV ChiefNuclear Oflicer k kkk

U-603904 Page 2 Enclosure x: NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety INPO Records Center

.